Spot Inspections
Speed Mine · 4605437103(i) · 4.5 on-site hours reported
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · $336.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $313.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $504.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $504.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $313.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $504.00 proposed penalty
Mining methods.
Maple Eagle No. 1 Mine · 460423630 CFR 75.203(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $336.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Weekly examination.
Winchester 2 · 460961530 CFR 75.364(b)(2) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Speed Mine · 46054375.8 on-site hours reported
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $267.00 proposed penalty
Machinery and equipment; operation and maintenance.
Speed Mine · 460543730 CFR 75.1725(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $549.00 proposed penalty
Power wires and cables; insulation and protection.
Speed Mine · 460543730 CFR 75.517 · Significant and substantial (S&S) · $5,574.00 proposed penalty
On-shift examination.
Speed Mine · 460543730 CFR 75.362(g)(2)(i) · $151.00 proposed penalty
Inspection of dry powder chemical systems.
Speed Mine · 460543730 CFR 75.1101-22(a) · $465.00 proposed penalty
Identification of circuit breakers.
Speed Mine · 460543730 CFR 75.904 · $1,679.00 proposed penalty
Power wires and cables; insulation and protection.
Maple Eagle No. 1 Mine · 460423630 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Protection of trailing cables.
Maple Eagle No. 1 Mine · 460423630 CFR 75.606 · $366.00 proposed penalty
Power wires and cables; insulation and protection.
Maple Eagle No. 1 Mine · 460423630 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Power wires and cables; insulation and protection.
Maple Eagle No. 1 Mine · 460423630 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.