  1. Mine ventilation plan; submission and approval.

    violationRecord 5022968
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5022967
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  3. Travelways at surface installations.

    violationRecord 5025800
    Samples Surface Mine · 4607178

    30 CFR 77.205(b) · $165.00 proposed penalty

  4. Verbal Hazard Complaint Inspections

    inspectionRecord F00585A
    Speed Mine · 4605437

    7.5 on-site hours reported

  5. Roof control plan.

    violationRecord 9847590
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.220(a)(1) · $1,550.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5025220
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5025219
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  8. Sampling; general and technical requirements.

    violationRecord 5025218
    Speed Mine · 4605437

    30 CFR 70.201(c) · $267.00 proposed penalty

  9. Quarterly sampling; mechanized mining units.

    violationRecord 5025217
    Speed Mine · 4605437

    30 CFR 70.208(e)(3) · $151.00 proposed penalty

  10. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5025799
    Samples Surface Mine · 4607178

    30 CFR 77.1606(c) · $398.00 proposed penalty

  11. Fall of face/rib/pillar/side/highwall

    accidentRecord 220261180020
    Speed Mine · 4605437

    Days away from work only

    Accident narrative

    Employee was injured when EE's left foot was struck by a rock that dislodged from the mine rib. EE was diagnosed with a fractured metatarsal and EE's foot was temporarily immobilized.

  12. Non-Fatal Accident Investigation

    inspectionRecord F00BE65
    Speed Mine · 4605437

    3.0 on-site hours reported

  13. Regular Safety and Health Inspection

    inspectionRecord F014285
    Maple Eagle East Deep Mine · 4609416

    17.5 on-site hours reported

  14. Loading and haulage equipment; operation.

    violationRecord 5025798
    Samples Surface Mine · 4607178

    30 CFR 77.1607(i) · $165.00 proposed penalty

  15. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5025797
    Samples Surface Mine · 4607178

    30 CFR 77.1606(c) · $398.00 proposed penalty

  16. Preshift examination at fixed intervals.

    violationRecord 5029113
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.360(g) · $151.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5022966
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5020437
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $755.00 proposed penalty

  19. Loading and haulage equipment; installations.

    violationRecord 5025796
    Samples Surface Mine · 4607178

    30 CFR 77.1605(d) · $336.00 proposed penalty

  20. Loading and haulage equipment; installations.

    violationRecord 5025795
    Samples Surface Mine · 4607178

    30 CFR 77.1605(d) · $336.00 proposed penalty

  21. Loading and haulage equipment; installations.

    violationRecord 5025794
    Samples Surface Mine · 4607178

    30 CFR 77.1605(d) · $336.00 proposed penalty

  22. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 5022965
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1712-3(b) · $1,219.00 proposed penalty

  23. Machinery and equipment; operation and maintenance.

    violationRecord 5020436
    Speed Mine · 4605437

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F007054
    Speed Mine · 4605437

    103(i) · 7.0 on-site hours reported

  25. Other safeguards.

    violationRecord 5029112
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $883.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.