← Panther Creek Mining LLC

Panther Creek Mining LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5022982
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $5,574.00 proposed penalty

  2. Ventilation controls.

    violationRecord 5022981
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(h) · $755.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5022980
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(a) · $959.00 proposed penalty

  4. Other safeguards.

    violationRecord 5022979
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $642.00 proposed penalty

  5. Mobile equipment; automatic warning devices.

    violationRecord 5025808
    Samples Surface Mine · 4607178

    30 CFR 77.410(c) · $165.00 proposed penalty

  6. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5029120
    Maple Eagle East Deep Mine · 4609416

    30 CFR 77.1606(c) · $151.00 proposed penalty

  7. Other safeguards.

    violationRecord 5022978
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $5,574.00 proposed penalty

  8. Electric equipment; examination, testing and maintenance.

    violationRecord 5020446
    Speed Mine · 4605437

    30 CFR 75.512 · $642.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020445
    Speed Mine · 4605437

    30 CFR 75.1731(b) · $549.00 proposed penalty

  10. Ventilation controls.

    violationRecord 5020444
    Speed Mine · 4605437

    30 CFR 75.333(c)(2) · $267.00 proposed penalty

  11. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5025807
    Samples Surface Mine · 4607178

    30 CFR 77.1606(c) · $366.00 proposed penalty

  12. Mobile equipment; automatic warning devices.

    violationRecord 5025806
    Samples Surface Mine · 4607178

    30 CFR 77.410(a)(1) · $165.00 proposed penalty

  13. Mobile equipment; automatic warning devices.

    violationRecord 5025805
    Samples Surface Mine · 4607178

    30 CFR 77.410(c) · $165.00 proposed penalty

  14. Loading and haulage equipment; installations.

    violationRecord 5025804
    Samples Surface Mine · 4607178

    30 CFR 77.1605(d) · $313.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5022977
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $755.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 5022976
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  17. Other safeguards.

    violationRecord 5022975
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $1,431.00 proposed penalty

  18. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 5022974
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1712-3(c)(2)(iv) · $818.00 proposed penalty

  19. Permissible electric face equipment; maintenance.

    violationRecord 5021804
    Speed Mine · 4605437

    30 CFR 75.503 · $9,757.00 proposed penalty

  20. Methane monitors.

    violationRecord 5021803
    Speed Mine · 4605437

    30 CFR 75.342(a)(4) · $9,004.00 proposed penalty

  21. Protection of trailing cables.

    violationRecord 5021802
    Speed Mine · 4605437

    30 CFR 75.606 · Significant and substantial (S&S) · $6,540.00 proposed penalty

  22. Mobile equipment; automatic warning devices.

    violationRecord 5025803
    Samples Surface Mine · 4607178

    30 CFR 77.410(c) · $165.00 proposed penalty

  23. Transportation of persons; overcrowding.

    violationRecord 5025802
    Samples Surface Mine · 4607178

    30 CFR 77.1604(b) · $165.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F00C76E
    Speed Mine · 4605437

    103(i) · 6.0 on-site hours reported

  25. Mine ventilation plan; submission and approval.

    violationRecord 5029119
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.