Panther Creek Mining LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1106-3(a)(2) · $288.00 proposed penalty
Mechanical equipment guards.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.400(b) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.1606(c) · $151.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Regular Safety and Health Inspection
Winchester 2 · 4609615228.3 on-site hours reported
Electric equipment; examination, testing and maintenance.
Speed Mine · 460543730 CFR 75.512 · $755.00 proposed penalty
Preshift examination at fixed intervals.
Speed Mine · 460543730 CFR 75.360(f) · $1,550.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(a) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $3,448.00 proposed penalty
Regular Safety and Health Inspection
Maple Eagle No. 1 Mine · 4604236230.0 on-site hours reported
Additional self-contained self-rescuers (SCSRs).
Maple Eagle No. 1 Mine · 460423630 CFR 75.1714-4(f) · $245.00 proposed penalty
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · $1,037.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1106-3(a)(2) · $288.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Speed Mine · 460543730 CFR 75.1106-3(a)(2) · $883.00 proposed penalty
Illumination.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.207 · $151.00 proposed penalty
Travelways at surface installations.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.205(b) · $267.00 proposed penalty
Dust accumulations in surface installations.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.202 · $151.00 proposed penalty
Mechanical equipment guards.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.400(d) · $151.00 proposed penalty
Travelways at surface installations.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.205(b) · $267.00 proposed penalty
Travelways at surface installations.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.205(b) · $267.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 1.5 on-site hours reported
Regular Safety and Health Inspection
Speed Mine · 4605437511.5 on-site hours reported
Regular Safety and Health Inspection
Maple Eagle East Deep Mine · 460941685.3 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 4.5 on-site hours reported
Spot Inspection
Sycamore Surface Mine · 46070582.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.