Coal production
0reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Mineral Park0200843 · Active6/8 quarters reported | Mohave, AZSurface · MSHA: Copper Ore NEC | 0 | 511,758 | 54 | 10 | 357.0 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 1 mines listed under this operator were checked; 1 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 57,418 | 0.00 | 129 | 1/1 mines reporting |
| 2025 Q2 | 0 | 69,180 | 0.00 | 127 | 1/1 mines reporting |
| 2025 Q3 | 0 | 66,935 | 0.00 | 155 | 1/1 mines reporting |
| 2025 Q4 | 0 | 89,419 | 0.00 | 148 | 1/1 mines reporting |
| 2026 Q1 | 0 | 95,553 | 0.00 | 188 | 1/1 mines reporting |
| 2026 Q2 | 0 | 133,253 | 0.00 | 190 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
12 significant & substantial (S&S)
0 records classified as fatality
48 of 54 violations with amounts
26 inspections · 26 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 4 | 0 | 1,850.00 | 2 | 0 | 1 | 27.3 |
| 2025-Q2 | 4 | 0 | 1,118.00 | 1 | 0 | 5 | 49.5 |
| 2025-Q3 | 2 | 1 | 2,119.00 | 3 | 0 | 2 | 17.0 |
| 2025-Q4 | 13 | 4 | 4,081.00 | 0 | 0 | 6 | 89.0 |
| 2026-Q1 | 5 | 1 | 1,031.00 | 1 | 0 | 4 | 41.8 |
| 2026-Q2 | 19 | 2 | 15,161.00 | 2 | 0 | 3 | 86.3 |
| 2026-Q3 | 7 | 4 | 151.00 | 1 | 0 | 5 | 46.3 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
Non-Chargeable Accident Investigation · 8.5 on-site hours
Description not reported
56.15006 · S&S
50.10(b)
56.14205 · S&S
56.12017 · S&S
48.27 · S&S
Non-Fatal Accident Investigation · 24.0 on-site hours
ELECTRICAL · DAYS AWAY FROM WORK ONLY
Electrical control superintendent was troubleshooting inside the #10-MC-03 energized 4160-volt electrical enclosure when they contacted the phase to phase with a fluke T6-600 voltages tester. This cause an arc flash causing burns to their hands, arms, and face due to not donning any of the required PPE and the 4160 volt power circuit not being deenergized before the work began.
Impoundment Spot Inspection · 2.0 on-site hours
56.20003(a) · $151.00 proposed
Verbal Hazard Complaint Inspections · 9.3 on-site hours
Compliance Follow-up Inspection · 2.5 on-site hours
MACHINERY · DAYS AWAY FROM WORK ONLY
Employee was pulverizing dirt samples in the Lower Lab. While placing the bowl onto the pulverizer, a piece of debris was ejected from the equipment and struck the employee in the left eye beneath their safety glasses. "Lab prep room is a room enclosed in the lower lab building."
56.14107(a) · $151.00 proposed
56.14107(a) · $151.00 proposed
56.12028 · $165.00 proposed
48.25(a) · $168.00 proposed
56.12028 · $151.00 proposed
56.14206(b) · $267.00 proposed
56.14107(a) · S&S · $366.00 proposed
56.14100(a) · $151.00 proposed
56.14100(b) · $151.00 proposed
56.4104(b) · $165.00 proposed
48.29(a) · $151.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.