Coal production
8,975,802reported short tons
ALL STATUSES / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| OHIO COUNTY MINE4601436 · Active6/8 quarters reported | Marshall, WVUnderground · MSHA: Coal (Bituminous) | 8,975,802 | 1,739,392 | 549 | 95 | 5,047.8 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 1 mines listed under this operator were checked; 1 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 1,560,695 | 272,169 | 5.73 | 422 | 1/1 mines reporting |
| 2025 Q2 | 1,398,761 | 288,245 | 4.85 | 447 | 1/1 mines reporting |
| 2025 Q3 | 1,470,098 | 305,742 | 4.81 | 465 | 1/1 mines reporting |
| 2025 Q4 | 1,663,493 | 293,452 | 5.67 | 460 | 1/1 mines reporting |
| 2026 Q1 | 1,123,294 | 273,505 | 4.11 | 427 | 1/1 mines reporting |
| 2026 Q2 | 1,759,461 | 306,279 | 5.74 | 474 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
61 significant & substantial (S&S)
1 records classified as fatality
506 of 549 violations with amounts
211 inspections · 211 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 122 | 12 | 50,402.00 | 14 | 0 | 30 | 696.8 |
| 2025-Q2 | 53 | 11 | 25,334.00 | 10 | 0 | 30 | 589.3 |
| 2025-Q3 | 85 | 15 | 51,476.00 | 18 | 0 | 32 | 841.0 |
| 2025-Q4 | 77 | 5 | 26,738.00 | 8 | 0 | 23 | 747.3 |
| 2026-Q1 | 29 | 1 | 9,055.00 | 9 | 0 | 25 | 595.3 |
| 2026-Q2 | 81 | 4 | 34,155.00 | 15 | 1 | 27 | 714.0 |
| 2026-Q3 | 96 | 13 | 18,209.00 | 21 | 0 | 36 | 775.0 |
| 2026-Q4 * | 6 | 0 | — | 0 | 0 | 8 | 89.3 |
All violations issued in the selected period. Counts combine subsections.
75.1731(a) · $151.00 proposed
75.360(b)(11)(i) · $818.00 proposed
75.206(e) · $245.00 proposed
75.220(a)(1) · $883.00 proposed
FALL OF ROOF OR BACK · DAYS AWAY FROM WORK ONLY
Employee was standing on the side of the miner bolting when a piece of green rock came down and struck the employee in the mouth area. Compliance with rules/regs, PPE, mining equip/systems not a factor. Miner proficiency may be a factor.
103(i) Spot Inspections · 7.0 on-site hours
75.370(a)(1) · $549.00 proposed
75.220(a)(1) · $267.00 proposed
103(i) Spot Inspections · 4.0 on-site hours
75.363(a) · $818.00 proposed
75.202(a) · $1,219.00 proposed
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Employees were loading roof straps on top of the miner and the injured employee attempted to duck out of the way, when EE was struck in the forehead. Compliance with rules/regs, PPE, mining equip/systems not a factor. Miner proficiency may be a factor.
103 (g) Written Notification Hazard Complaint Inspectio · 3.5 on-site hours
DUST DISEASE OF LUNGS · OCCUPATNAL ILLNESS NOT DEG 1-6
Employee was diagnosed with Occupational Pneumoconiosis. The employee was diagnosed with an additional 10% permanent partial disability. The employee filed on 10/30/25. It didn't involve any compliance issues. No equipment involved. No other 50.20 criteria applies.
75.400 · $465.00 proposed
75.400 · $209.00 proposed
75.360(b)(11)(iii) · $2,712.00 proposed
75.403 · $2,712.00 proposed
75.380(f)(4) · $151.00 proposed
103(i) Spot Inspections · 7.0 on-site hours
75.400 · $209.00 proposed
FALL OF ROOF OR BACK · DAYS AWAY FROM WORK ONLY
Employee was bolting in the 9 South Return when a rock fell from between the straps and struck EE on the right arm. Compliance with rules/regs, PPE, mining equip/systems not a factor. Miner proficiency may be a factor.
FALL OF ROOF OR BACK · DAYS AWAY FROM WORK ONLY
IE was travelling into a job site with a shift foreman to inspect the work area. As EE was crawling up the walkway a rock dislodged from the top and struck EE in the back. Injury was not the result of a training or compliance issue.
103(i) Spot Inspections · 5.0 on-site hours
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
A shaft driller apprentice was helping apply gunite to the shaft ribs on 6/3/26 at approx. 11pm. During the course of this process the miners pants became soaked with the concrete material. When the miner woke up at 1pm on 6/4/26 EE discovered significant concrete burns on both of EE's legs from the knees down.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 729,117 | 12,583 | 4.10 | 8.94 | 51.15 | |
| 2025-Q4 | 985,482 | 12,715 | 3.62 | 8.36 | 47.68 | |
| 2026-Q1 | 931,310 | 12,699 | 3.90 | 8.35 | 52.16 | |
| 2026-Q2 | 1,173,607 | 12,616 | 3.87 | 8.50 | 57.60 | |
| 2026-Q3 * | 428,124 | 12,687 | 3.80 | 8.35 | 57.18 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 11547 · preliminary | SHOEMAKER MINE4601436 | Ghent1356 · KY · ACNR COAL SALES, Inc. | 1,785 | 45.77 | 12,506 | 3.31 | 8.80 | ContractBIT | River |
| 2026-07EIA row 11766 · preliminary | SHOEMAKER MINE4601436 | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 66,627 | —Not published | 12,699 | 3.65 | 8.40 | ContractBIT | River |
| 2026-07EIA row 11773 · preliminary | SHOEMAKER MINE4601436 | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 26,254 | —Not published | 12,748 | 3.67 | 8.30 | ContractBIT | River |
| 2026-07EIA row 11777 · preliminary | SHOEMAKER MINE4601436 | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 73,467 | —Not published | 12,740 | 3.39 | 8.40 | ContractBIT | River |
| 2026-07EIA row 11997 · preliminary | SHOEMAKER MINE4601436 | Pleasants Power Station6004 · WV · ACNR COAL SALES, Inc. | 15,885 | —Not published | 12,615 | 5.15 | 8.10 | SpotBIT | River |
| 2026-07EIA row 12022 · preliminary | SHOEMAKER MINE4601436 | H L Spurlock6041 · KY · ACNR COAL SALES, Inc. | 9,292 | 62.67 | 12,665 | 3.82 | 8.90 | ContractBIT | River |
| 2026-07EIA row 12028 · preliminary | SHOEMAKER MINE4601436 | H L Spurlock6041 · KY · ACNR COAL SALES, Inc. | 15,716 | 62.67 | 12,665 | 3.96 | 8.40 | ContractBIT | River |
| 2026-07EIA row 12218 · preliminary | SHOEMAKER MINE4601436 | Mountaineer6264 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 106,054 | 57.10 | 12,700 | 3.55 | 8.37 | ContractBIT | River |
| 2026-07EIA row 12220 · preliminary | SHOEMAKER MINE4601436 | Mountaineer6264 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 28,457 | 53.39 | 12,725 | 3.61 | 8.30 | ContractBIT | River |
| 2026-07EIA row 12486 · preliminary | SHOEMAKER MINE4601436 | Gavin Power, LLC8102 · OH · ACNR COAL SALES, Inc. | 71,100 | —Not published | 12,605 | 4.34 | 8.30 | ContractBIT | River |
| 2026-07EIA row 13111 · preliminary | SHOEMAKER MINE4601436 | Longview Power Plant56671 · WV · ACNR COAL SALES, Inc. | 13,487 | —Not published | 12,615 | 4.87 | 8.00 | ContractBIT | River / Truck |
| 2026-06EIA row 9657 · preliminary | SHOEMAKER MINE4601436 | Ghent1356 · KY · ACNR COAL SALES, Inc. | 12,018 | 45.77 | 12,608 | 3.19 | 8.60 | ContractBIT | River |
| 2026-06EIA row 9875 · preliminary | SHOEMAKER MINE4601436 | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 77,751 | —Not published | 12,656 | 3.41 | 8.40 | ContractBIT | River |
| 2026-06EIA row 9883 · preliminary | SHOEMAKER MINE4601436 | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 49,778 | —Not published | 12,634 | 3.40 | 8.50 | ContractBIT | River |
| 2026-06EIA row 9884 · preliminary | SHOEMAKER MINE4601436 | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 46,544 | —Not published | 12,649 | 3.43 | 8.60 | ContractBIT | River |
| 2026-06EIA row 10116 · preliminary | SHOEMAKER MINE4601436 | H L Spurlock6041 · KY · ACNR COAL SALES, Inc. | 10,692 | 58.21 | 12,600 | 4.99 | 8.30 | ContractBIT | River |
| 2026-06EIA row 10306 · preliminary | SHOEMAKER MINE4601436 | Mountaineer6264 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 112,384 | 58.69 | 12,665 | 3.55 | 8.38 | ContractBIT | River |
| 2026-06EIA row 10307 · preliminary | SHOEMAKER MINE4601436 | Mountaineer6264 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 23,103 | 54.12 | 12,645 | 3.52 | 8.54 | ContractBIT | River |
| 2026-06EIA row 10540 · preliminary | SHOEMAKER MINE4601436 | Gavin Power, LLC8102 · OH · ACNR COAL SALES, Inc. | 240,929 | —Not published | 12,600 | 4.42 | 8.40 | ContractBIT | River |
| 2026-05EIA row 8033 · preliminary | SHOEMAKER MINE4601436 | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 91,969 | —Not published | 12,636 | 3.33 | 8.30 | ContractBIT | River |
| 2026-05EIA row 8036 · preliminary | SHOEMAKER MINE4601436 | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 27,822 | —Not published | 12,637 | 3.63 | 8.50 | ContractBIT | River |
| 2026-05EIA row 8043 · preliminary | SHOEMAKER MINE4601436 | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 44,332 | —Not published | 12,635 | 3.27 | 8.40 | ContractBIT | River |
| 2026-05EIA row 8273 · preliminary | SHOEMAKER MINE4601436 | H L Spurlock6041 · KY · ACNR COAL SALES, Inc. | 21,721 | 59.25 | 12,595 | 4.73 | 8.60 | ContractBIT | River |
| 2026-05EIA row 8441 · preliminary | SHOEMAKER MINE4601436 | Mountaineer6264 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 97,139 | 58.40 | 12,630 | 3.57 | 8.35 | ContractBIT | River |
| 2026-05EIA row 8443 · preliminary | SHOEMAKER MINE4601436 | Mountaineer6264 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 24,947 | 53.59 | 12,615 | 3.57 | 8.32 | ContractBIT | River |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Ohio County Mine4601436 · Marshall, West Virginia | 5,558,609 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.