Coal production
0reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Arturo2602767 · Active6/8 quarters reported | Eureka, NVSurface · MSHA: Gold Ore | 0 | 1,294,095 | 12 | 11 | 84.5 |
| Cortez District2600827 · Active6/8 quarters reported | Lander, NVSurface · MSHA: Gold Ore | 0 | 2,770,542 | 83 | 23 | 392.0 |
| Cortez District-Underground2602573 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 1,131,296 | 117 | 6 | 610.0 |
| El Nino2602830 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 203,911 | 51 | 1 | 207.3 |
| Emigrant2602697 · Active6/8 quarters reported | Elko, NVSurface · MSHA: Gold Ore | 0 | 9,674 | 5 | 1 | 95.8 |
| Exodus2602661 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 712,625 | 96 | 2 | 396.5 |
| Genesis2600062 · Active6/8 quarters reported | Eureka, NVSurface · MSHA: Gold Ore | 0 | 221,894 | 33 | 2 | 81.8 |
| Goldrush2602822 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 1,037,871 | 124 | 15 | 674.3 |
| Goldstrike Mine2601089 · Active6/8 quarters reported | Eureka, NVSurface · MSHA: Gold Ore | 0 | 243,531 | 15 | 10 | 120.8 |
| Leeville2602512 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 1,966,011 | 371 | 10 | 1,214.0 |
| Long Canyon2602778 · Active6/8 quarters reported | Elko, NVSurface · MSHA: Gold Ore | 0 | 32,746 | 1 | 0 | 25.5 |
| Meikle Mine2602246 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 1,817,651 | 358 | 17 | 1,179.5 |
| Mill 62602678 · Active6/8 quarters reported | Eureka, NVFacility · MSHA: Gold Ore | 0 | 726,003 | 64 | 7 | 183.5 |
| Mill/Autoclave Operations2602674 · Active6/8 quarters reported | Eureka, NVFacility · MSHA: Gold Ore | 0 | 849,001 | 190 | 9 | 366.5 |
| Pete Bajo2602689 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 641,211 | 141 | 8 | 597.3 |
| Phoenix Mine2600550 · Active6/8 quarters reported | Lander, NVSurface · MSHA: Gold Ore | 0 | 1,500,105 | 80 | 14 | 285.0 |
| Roaster Operations2602673 · Active6/8 quarters reported | Eureka, NVFacility · MSHA: Gold Ore | 0 | 507,213 | 102 | 4 | 295.8 |
| South Area2600500 · Active6/8 quarters reported | Eureka, NVSurface · MSHA: Gold Ore | 0 | 1,405,427 | 123 | 25 | 450.8 |
| Turquoise Ridge2602286 · Active6/8 quarters reported | Humboldt, NVUnderground · MSHA: Gold Ore | 0 | 1,465,184 | 270 | 23 | 900.0 |
| Twin Creeks Mine2601942 · Active6/8 quarters reported | Humboldt, NVSurface · MSHA: Gold Ore | 0 | 1,205,477 | 54 | 9 | 296.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
20 of 20 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 20 mines listed under this operator were checked; 20 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 3,330,594 | 0.00 | 6,539 | 20/20 mines reporting |
| 2025 Q2 | 0 | 3,415,549 | 0.00 | 6,680 | 20/20 mines reporting |
| 2025 Q3 | 0 | 3,295,773 | 0.00 | 6,491 | 20/20 mines reporting |
| 2025 Q4 | 0 | 3,461,007 | 0.00 | 6,613 | 20/20 mines reporting |
| 2026 Q1 | 0 | 3,271,491 | 0.00 | 6,760 | 20/20 mines reporting |
| 2026 Q2 | 0 | 2,967,054 | 0.00 | 6,835 | 20/20 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
188 significant & substantial (S&S)
1 records classified as fatality
2,151 of 2,290 violations with amounts
378 inspections · 378 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 416 | 31 | 407,751.00 | 30 | 0 | 53 | 1,286.3 |
| 2025-Q2 | 350 | 26 | 270,857.00 | 21 | 0 | 48 | 1,086.5 |
| 2025-Q3 | 326 | 34 | 364,046.00 | 31 | 1 | 52 | 1,258.5 |
| 2025-Q4 | 267 | 16 | 208,605.00 | 24 | 0 | 36 | 922.5 |
| 2026-Q1 | 401 | 27 | 555,319.00 | 30 | 0 | 61 | 1,424.0 |
| 2026-Q2 | 201 | 19 | 313,891.00 | 32 | 0 | 46 | 1,100.5 |
| 2026-Q3 | 298 | 33 | 261,674.00 | 29 | 0 | 69 | 1,323.3 |
| 2026-Q4 * | 31 | 2 | — | 0 | 0 | 13 | 55.5 |
All violations issued in the selected period. Counts combine subsections.
57.3360 · $592.00 proposed
57.8529 · $366.00 proposed
Description not reported
50.10(d) · S&S · $2,133.00 proposed
50.10(d) · S&S · $2,133.00 proposed
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
EE was taking wire to a heading. Reports they were walking downhill, stepped wrong, straining ankle. Seen at ER, given brace and crutches, and released to return to work restricted.
EXPLOSIVES AND BREAKING AGENTS · ACCIDENT ONLY
In the Arturo pit at approximately 11:30 am, shovel 191 was working on the 5200-bench trim Pattern #19, cleaning up the blasted material. The shovel bucket made contact with explosives, causing it to detonate. This caused damage to the window. All employees were safe, and no injuries were sustained.
MACHINERY · DAYS RESTRICTED ACTIVITY ONLY
Ee removing haul truck tire on CAT 795. EE was trying to get rad gun on the nut to loosen them and improperly placed their right hand, accidentally hit trigger of rad gun with left hand, pinching right thumb between gun and hub of tire. Seen at clinic, released with restrictions and referred to ortho.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
A heavy toolbox being moved on fork tines fell to the ground. Two employees attempted to manually stand it upright. During the lift, one employee lost control, causing the box to shift and trap the other employee's finger between the box, the ground, and EE's boot, resulting in a laceration. (requiring several sutures)
57.6202(b)(1) · $1,126.00 proposed
57.6201 · $366.00 proposed
Spot Inspection · 4.0 on-site hours
Verbal Hazard Complaint Inspections · 6.0 on-site hours
57.14100(a) · $366.00 proposed
57.4200(b)(2) · $549.00 proposed
57.14100(b) · $642.00 proposed
57.4462(d)(3) · $366.00 proposed
47.41(a) · $165.00 proposed
57.6160(b)(2) · $366.00 proposed
57.6102 · $366.00 proposed
Compliance Follow-up Inspection · 2.8 on-site hours
57.3401 · $398.00 proposed
57.13021 · $267.00 proposed
57.14207 · $151.00 proposed
57.4201(a)(2) · $267.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.