ACTIVE / OPERATOR PORTFOLIO

Navajo Transitional Energy Company, LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0131153

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Antelope Coal Mine4801337 · Active6/8 quarters reportedConverse, WYSurface · MSHA: Coal (Bituminous)28,674,1341,120,821303394.8
Cordero Rojo Mine4800992 · Active6/8 quarters reportedCampbell, WYSurface · MSHA: Coal (Bituminous)17,489,885811,792364427.3
Spring Creek Mine2401457 · Active6/8 quarters reportedBig Horn, MTSurface · MSHA: Coal (Bituminous)15,085,536785,254185270.8

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

84

21 significant & substantial (S&S)

  1. 2025 Q111
  2. 2025 Q218
  3. 2025 Q310
  4. 2025 Q416
  5. 2026 Q113
  6. 2026 Q28
  7. 2026 Q36
  8. 2026 Q4 *2

Accident records

12

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q20
  3. 2025 Q34
  4. 2025 Q43
  5. 2026 Q10
  6. 2026 Q21
  7. 2026 Q33
  8. 2026 Q4 *0

Proposed penalties · USD

50,897.00

81 of 84 violations with amounts

  1. 2025 Q17,348
  2. 2025 Q28,840
  3. 2025 Q32,606
  4. 2025 Q44,927
  5. 2026 Q120,247
  6. 2026 Q22,906
  7. 2026 Q34,023
  8. 2026 Q4 *—

On-site inspection hours

1,092.75

21 inspections · 21 with hours

  1. 2025 Q191.50
  2. 2025 Q2209.00
  3. 2025 Q3118.25
  4. 2025 Q4243.25
  5. 2026 Q197.50
  6. 2026 Q2122.75
  7. 2026 Q3188.00
  8. 2026 Q4 *22.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11137,348.0010191.5
2025-Q21848,840.00002209.0
2025-Q31012,606.00403118.3
2025-Q41654,927.00304243.3
2026-Q113420,247.0000397.5
2026-Q2822,906.00103122.8
2026-Q3614,023.00304188.0
2026-Q4 *21—00122.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5033917
    Cordero Rojo Mine · 4800992

    77.404(a) · S&S

  2. inspectionF00789A
    Cordero Rojo Mine · 4800992

    Regular Safety and Health Inspection · 105.3 on-site hours

  3. inspectionF002D82
    Spring Creek Mine · 2401457

    Verbal Hazard Complaint Inspections · 3.5 on-site hours

  4. violation5033136
    Antelope Coal Mine · 4801337

    77.1104 · $151.00 proposed

  5. violation9732590
    Antelope Coal Mine · 4801337

    77.1102 · $193.00 proposed

  6. violation5033135
    Antelope Coal Mine · 4801337

    77.1710(i) · $151.00 proposed

  7. violation5033134
    Antelope Coal Mine · 4801337

    77.1110 · $151.00 proposed

  8. violation9732589
    Antelope Coal Mine · 4801337

    77.405(b) · $193.00 proposed

  9. violation9732385
    Antelope Coal Mine · 4801337

    77.1101(c) · $151.00 proposed

  10. violation9732384
    Antelope Coal Mine · 4801337

    77.800 · S&S · $959.00 proposed

  11. violation9732588
    Antelope Coal Mine · 4801337

    77.1710(g) · S&S · $432.00 proposed

  12. violation9732587
    Antelope Coal Mine · 4801337

    77.205(a) · S&S · $959.00 proposed

  13. violation9732383
    Antelope Coal Mine · 4801337

    77.400(a) · $288.00 proposed

  14. violation9732382
    Antelope Coal Mine · 4801337

    77.516 · $288.00 proposed

  15. violation9732586
    Antelope Coal Mine · 4801337

    77.205(a) · S&S · $432.00 proposed

  16. inspectionF0030E4
    Antelope Coal Mine · 4801337

    Regular Safety and Health Inspection · 130.8 on-site hours

  17. accident220253170636
    Spring Creek Mine · 2401457

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    EE was cutting rubber skirting with a box cutter style knife. The knife slipped and cut through the welding gloves they were wearing. EE received 5 sutures to close a laceration on the back of their left hand above the thumb.

  18. accident220252590013
    Spring Creek Mine · 2401457

    MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    The cutoff wheel fractured during grinding, and a fragment struck the employee's right arm, causing a laceration that required sutures to close. The disc had the proper RPM rating for the grinder, and the employee was wearing all necessary PPE at the time of the incident.

  19. inspection6469046
    Cordero Rojo Mine · 4800992

    Compliance Follow-up Inspection · 12.8 on-site hours

  20. accident220252480018
    Spring Creek Mine · 2401457

    HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    EE was replacing a single point lubricator on a plant roller bearing cap. While withdrawing their hand their right index finger contacted the zero speed sensor mount causing a laceration requiring 5 sutures to close.

  21. inspection6462400
    Spring Creek Mine · 2401457

    Spot Inspection · 6.0 on-site hours

  22. violation9732346
    Spring Creek Mine · 2401457

    77.1607(b) · S&S · $1,219.00 proposed

  23. accident220252340018
    Spring Creek Mine · 2401457

    MACHINERY · DAYS RESTRICTED ACTIVITY ONLY

    Accident narrative

    EE was pushing dirt off a coal fender to bury warm coal when the fender gave out and the dozer slide off sideways. The dozer overturned landing upright on the tracks. EE sustained a 1 inch laceration on their scalp requiring a suture to close.

  24. accident220252060016
    Spring Creek Mine · 2401457

    FIRE · ACCIDENT ONLY

    Accident narrative

    A coal smoker was discovered in the ramp 20 waste dump. Dozer was walked over to bury the smoker. Smoker was extinguished but took longer than 30 minutes. No people, equipment or property was threatened at anytime.

  25. violation9732480
    Spring Creek Mine · 2401457

    77.404(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS33,423,940467 rows · 51 receiving plants
HEAT CONTENT · BTU/LB8,861Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.25 / 5.08Separate averages over measured receipts
DELIVERED COST · USD/TON34.3489.2% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *6,842,3948,9260.265.1435.44
2025-Q48,118,2318,7960.255.2532.46
2026-Q18,480,4818,8710.244.9433.33
2026-Q27,593,9398,8660.254.9835.61
2026-Q3 *2,388,8958,8450.255.2036.98
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11356 · preliminaryANTELOPE COAL MINE4801337Holcomb108 · KS · ANTELOPE77,41231.678,9510.235.30ContractSUBRail
2026-07EIA row 11515 · preliminaryANTELOPE COAL MINE4801337Walter Scott Jr Energy Center1082 · IA · NAVAJO TRANSITIONAL ENERGY CO., LLC81,93525.908,9820.234.70ContractSUBRail
2026-07EIA row 11521 · preliminaryANTELOPE COAL MINE4801337George Neal North1091 · IA · NAVAJO TRANSITIONAL ENERGY CO., LLC34,93841.348,9710.214.80ContractSUBRail
2026-07EIA row 11571 · preliminaryANTELOPE COAL MINE4801337Shawnee1379 · KY · NAVAJO TRANSITIONAL ENERGY CO., LLC174,82033.109,0190.234.60ContractSUBRail
2026-07EIA row 11575 · preliminaryANTELOPE COAL MINE4801337Shawnee1379 · KY · NAVAJO TRANSITIONAL ENERGY CO., LLC111,08232.108,9720.225.00ContractSUBRail
2026-07EIA row 11637 · preliminaryANTELOPE COAL MINE4801337Monroe (MI)1733 · MI · NAVAJO15,83641.648,9520.274.70ContractSUBRail
2026-07EIA row 11644 · preliminarySPRING CREEK COAL COMPANY2401457Clay Boswell1893 · MN · SPRING CREEK77,91437.449,3450.355.30ContractSUBRail
2026-07EIA row 11680 · preliminaryANTELOPE COAL MINE4801337Sioux2107 · MO · NAVAJO TRANSITIONAL ENERGY CO., LLC176,19441.288,9850.214.70ContractSUBRail
2026-07EIA row 11688 · preliminaryCORDERO MINE4800992North Omaha2291 · NE · NAVAJO TRANSITIONAL ENERGY CO., LLC16,83425.768,2500.286.80ContractSUBRail
2026-07EIA row 11902 · preliminaryCORDERO MINE4800992W A Parish3470 · TX · NAVAJO TRANSITIONAL ENERGY CO., LLC77,294—Not published8,4400.265.60ContractSUBRail
2026-07EIA row 11954 · preliminaryANTELOPE COAL MINE4801337South Oak Creek4041 · WI · CLOUD PEAK2,66543.879,0450.224.30ContractSUBRail
2026-07EIA row 11989 · preliminaryANTELOPE COAL MINE4801337James H Miller Jr6002 · AL · NTEC-KENNECOTT63,87743.658,8910.214.90ContractSUBRail
2026-07EIA row 11992 · preliminaryCORDERO ROJO4800992James H Miller Jr6002 · AL · NTEC-KENNECOTT31,88542.558,2620.276.40ContractSUBRail
2026-07EIA row 11993 · preliminaryANTELOPE COAL MINE4801337James H Miller Jr6002 · AL · NTEC-KENNECOTT32,02043.208,8500.255.50ContractSUBRail
2026-07EIA row 12003 · preliminaryCORDERO MINE4800992Newton6017 · IL · CORDERO48,088—Not published8,8000.265.60ContractSUBRail
2026-07EIA row 12051 · preliminaryANTELOPE COAL MINE4801337Nearman Creek6064 · KS · ANTELOPE70,73837.298,9550.194.90ContractSUBRail
2026-07EIA row 12054 · preliminaryANTELOPE COAL MINE4801337Iatan6065 · MO · NAVAJO TRANSITIONAL ENERGY CO., LLC81,78637.448,9560.205.00ContractSUBRail
2026-07EIA row 12060 · preliminaryCORDERO MINE4800992Jeffrey Energy Center6068 · KS · NAVAJO TRANSITIONAL ENERGY CO., LLC44,71529.448,4860.245.50ContractSUBRail
2026-07EIA row 12108 · preliminaryCORDERO MINE4800992Nebraska City6096 · NE · NAVAJO TRANSITIONAL ENERGY CO., LLC85,81422.868,4800.255.70ContractSUBRail
2026-07EIA row 12109 · preliminaryANTELOPE COAL MINE4801337Nebraska City6096 · NE · NAVAJO TRANSITIONAL ENERGY CO., LLC87,51426.008,9400.204.70ContractSUBRail
2026-07EIA row 12112 · preliminaryCORDERO MINE4800992Big Stone6098 · SD · NAVAJO TRIBAL AUTHORITY78,49645.388,5270.305.60ContractSUBRail
2026-07EIA row 12141 · preliminarySPRING CREEK COAL COMPANY2401457Coronado6177 · AZ · NAVAJO TRANSITIONAL ENERGY CO., LLC59,98468.409,2880.355.40ContractSUBRail
2026-07EIA row 12147 · preliminaryANTELOPE COAL MINE4801337Fayette Power Project6179 · TX · NAVAJO TRANSITIONAL ENERGY CO., LLC49,18333.059,0210.194.70SpotSUBRail
2026-07EIA row 12176 · preliminaryANTELOPE COAL MINE4801337Tolk6194 · TX · TUCO59,38241.118,8290.375.40ContractSUBRail
2026-07EIA row 12179 · preliminaryANTELOPE COAL MINE4801337John Twitty Energy Center6195 · MO · NAVAJO TRANSITIONAL ENERGY CO., LLC62,18648.718,9250.195.00ContractSUBRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON13.96Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS4,314,351Allocated from published county sales
ESTIMATED COAL REVENUE · USD60,228,340Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED13.3%1 of 3 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Cordero Rojo Mine4800992 · Campbell, Wyoming4,314,67813.964,314,35160,228,340County allocation estimate2.54% of eligible county production11 eligible mines / 11 sales respondents
Spring Creek Mine2401457 · Big Horn, Montana13,053,955———County sales or price not published2 eligible mines / 2 sales respondents
Antelope Coal Mine4801337 · Converse, Wyoming14,984,446———County sales or price not published1 eligible mines / 1 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.