Coal production
61,249,555reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Antelope Coal Mine4801337 · Active6/8 quarters reported | Converse, WYSurface · MSHA: Coal (Bituminous) | 28,674,134 | 1,120,821 | 30 | 3 | 394.8 |
| Cordero Rojo Mine4800992 · Active6/8 quarters reported | Campbell, WYSurface · MSHA: Coal (Bituminous) | 17,489,885 | 811,792 | 36 | 4 | 427.3 |
| Spring Creek Mine2401457 · Active6/8 quarters reported | Big Horn, MTSurface · MSHA: Coal (Bituminous) | 15,085,536 | 785,254 | 18 | 5 | 270.8 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 3 mines listed under this operator were checked; 3 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 9,316,818 | 431,013 | 21.62 | 878 | 3/3 mines reporting |
| 2025 Q2 | 11,013,007 | 444,556 | 24.77 | 913 | 3/3 mines reporting |
| 2025 Q3 | 11,555,396 | 459,916 | 25.13 | 914 | 3/3 mines reporting |
| 2025 Q4 | 9,610,714 | 444,975 | 21.60 | 923 | 3/3 mines reporting |
| 2026 Q1 | 10,142,383 | 460,256 | 22.04 | 922 | 3/3 mines reporting |
| 2026 Q2 | 9,611,237 | 477,151 | 20.14 | 946 | 3/3 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
21 significant & substantial (S&S)
0 records classified as fatality
81 of 84 violations with amounts
21 inspections · 21 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 11 | 3 | 7,348.00 | 1 | 0 | 1 | 91.5 |
| 2025-Q2 | 18 | 4 | 8,840.00 | 0 | 0 | 2 | 209.0 |
| 2025-Q3 | 10 | 1 | 2,606.00 | 4 | 0 | 3 | 118.3 |
| 2025-Q4 | 16 | 5 | 4,927.00 | 3 | 0 | 4 | 243.3 |
| 2026-Q1 | 13 | 4 | 20,247.00 | 0 | 0 | 3 | 97.5 |
| 2026-Q2 | 8 | 2 | 2,906.00 | 1 | 0 | 3 | 122.8 |
| 2026-Q3 | 6 | 1 | 4,023.00 | 3 | 0 | 4 | 188.0 |
| 2026-Q4 * | 2 | 1 | — | 0 | 0 | 1 | 22.5 |
All violations issued in the selected period. Counts combine subsections.
77.1104
Regular Safety and Health Inspection · 22.5 on-site hours
77.1605(l) · S&S
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Driving bulk truck, about to enter shovel run and encountered a soft spot with a potential rock in rut causing some vehicle jarring. Employee continued working and started experiencing back pain and after evaluation, found a muscle strain and L1 compression fracture.
Verbal Hazard Complaint Inspections · 3.5 on-site hours
77.400(a) · $151.00 proposed
77.204 · S&S · $3,184.00 proposed
Regular Safety and Health Inspection · 74.0 on-site hours
MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT
While pulling the top cover of the conveyor belt off for vulcanizing, the Dynema rope pulling the ply puller with a winch failed. The clamp backlashed hitting the worker in the left hand. While trying to get out of the way, the worker fell landing on EE's right hand. Injuries include fracture to L 5th Metatarsal and R wrist.
77.502 · $193.00 proposed
77.502 · $151.00 proposed
MACHINERY · DAYS AWAY FROM WORK ONLY
Shovel operator was attempting to move a trip rope that was hung up on the latch bar on the shovel dipper. While they were moving the rope the latch bar shiv fell down pulling their hand into the bottom side of the shiv, pinching their hand between the shiv and the frame of the dipper. The employee was diagnosed with a fracture to their pinky finger on their right hand.
77.216(d) · $193.00 proposed
Regular Safety and Health Inspection · 102.5 on-site hours
77.107-1 · $151.00 proposed
Verbal Hazard Complaint Inspections · 8.0 on-site hours
Verbal Hazard Complaint Inspections · 4.0 on-site hours
MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was working above EE's head, using a die grinder with a bure bit. The employee's shirt sleeves were not buttoned and got caught in the bit of the die grinder causing a laceration of the left forearm. The laceration required sutures.
77.502 · S&S · $959.00 proposed
77.1713(c) · $151.00 proposed
77.505 · $193.00 proposed
77.1605(b) · $209.00 proposed
77.1110 · $209.00 proposed
77.512 · $151.00 proposed
77.502-2 · $151.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 6,842,394 | 8,926 | 0.26 | 5.14 | 35.44 | |
| 2025-Q4 | 8,118,231 | 8,796 | 0.25 | 5.25 | 32.46 | |
| 2026-Q1 | 8,480,481 | 8,871 | 0.24 | 4.94 | 33.33 | |
| 2026-Q2 | 7,593,939 | 8,866 | 0.25 | 4.98 | 35.61 | |
| 2026-Q3 * | 2,388,895 | 8,845 | 0.25 | 5.20 | 36.98 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 11356 · preliminary | ANTELOPE COAL MINE4801337 | Holcomb108 · KS · ANTELOPE | 77,412 | 31.67 | 8,951 | 0.23 | 5.30 | ContractSUB | Rail |
| 2026-07EIA row 11515 · preliminary | ANTELOPE COAL MINE4801337 | Walter Scott Jr Energy Center1082 · IA · NAVAJO TRANSITIONAL ENERGY CO., LLC | 81,935 | 25.90 | 8,982 | 0.23 | 4.70 | ContractSUB | Rail |
| 2026-07EIA row 11521 · preliminary | ANTELOPE COAL MINE4801337 | George Neal North1091 · IA · NAVAJO TRANSITIONAL ENERGY CO., LLC | 34,938 | 41.34 | 8,971 | 0.21 | 4.80 | ContractSUB | Rail |
| 2026-07EIA row 11571 · preliminary | ANTELOPE COAL MINE4801337 | Shawnee1379 · KY · NAVAJO TRANSITIONAL ENERGY CO., LLC | 174,820 | 33.10 | 9,019 | 0.23 | 4.60 | ContractSUB | Rail |
| 2026-07EIA row 11575 · preliminary | ANTELOPE COAL MINE4801337 | Shawnee1379 · KY · NAVAJO TRANSITIONAL ENERGY CO., LLC | 111,082 | 32.10 | 8,972 | 0.22 | 5.00 | ContractSUB | Rail |
| 2026-07EIA row 11637 · preliminary | ANTELOPE COAL MINE4801337 | Monroe (MI)1733 · MI · NAVAJO | 15,836 | 41.64 | 8,952 | 0.27 | 4.70 | ContractSUB | Rail |
| 2026-07EIA row 11644 · preliminary | SPRING CREEK COAL COMPANY2401457 | Clay Boswell1893 · MN · SPRING CREEK | 77,914 | 37.44 | 9,345 | 0.35 | 5.30 | ContractSUB | Rail |
| 2026-07EIA row 11680 · preliminary | ANTELOPE COAL MINE4801337 | Sioux2107 · MO · NAVAJO TRANSITIONAL ENERGY CO., LLC | 176,194 | 41.28 | 8,985 | 0.21 | 4.70 | ContractSUB | Rail |
| 2026-07EIA row 11688 · preliminary | CORDERO MINE4800992 | North Omaha2291 · NE · NAVAJO TRANSITIONAL ENERGY CO., LLC | 16,834 | 25.76 | 8,250 | 0.28 | 6.80 | ContractSUB | Rail |
| 2026-07EIA row 11902 · preliminary | CORDERO MINE4800992 | W A Parish3470 · TX · NAVAJO TRANSITIONAL ENERGY CO., LLC | 77,294 | —Not published | 8,440 | 0.26 | 5.60 | ContractSUB | Rail |
| 2026-07EIA row 11954 · preliminary | ANTELOPE COAL MINE4801337 | South Oak Creek4041 · WI · CLOUD PEAK | 2,665 | 43.87 | 9,045 | 0.22 | 4.30 | ContractSUB | Rail |
| 2026-07EIA row 11989 · preliminary | ANTELOPE COAL MINE4801337 | James H Miller Jr6002 · AL · NTEC-KENNECOTT | 63,877 | 43.65 | 8,891 | 0.21 | 4.90 | ContractSUB | Rail |
| 2026-07EIA row 11992 · preliminary | CORDERO ROJO4800992 | James H Miller Jr6002 · AL · NTEC-KENNECOTT | 31,885 | 42.55 | 8,262 | 0.27 | 6.40 | ContractSUB | Rail |
| 2026-07EIA row 11993 · preliminary | ANTELOPE COAL MINE4801337 | James H Miller Jr6002 · AL · NTEC-KENNECOTT | 32,020 | 43.20 | 8,850 | 0.25 | 5.50 | ContractSUB | Rail |
| 2026-07EIA row 12003 · preliminary | CORDERO MINE4800992 | Newton6017 · IL · CORDERO | 48,088 | —Not published | 8,800 | 0.26 | 5.60 | ContractSUB | Rail |
| 2026-07EIA row 12051 · preliminary | ANTELOPE COAL MINE4801337 | Nearman Creek6064 · KS · ANTELOPE | 70,738 | 37.29 | 8,955 | 0.19 | 4.90 | ContractSUB | Rail |
| 2026-07EIA row 12054 · preliminary | ANTELOPE COAL MINE4801337 | Iatan6065 · MO · NAVAJO TRANSITIONAL ENERGY CO., LLC | 81,786 | 37.44 | 8,956 | 0.20 | 5.00 | ContractSUB | Rail |
| 2026-07EIA row 12060 · preliminary | CORDERO MINE4800992 | Jeffrey Energy Center6068 · KS · NAVAJO TRANSITIONAL ENERGY CO., LLC | 44,715 | 29.44 | 8,486 | 0.24 | 5.50 | ContractSUB | Rail |
| 2026-07EIA row 12108 · preliminary | CORDERO MINE4800992 | Nebraska City6096 · NE · NAVAJO TRANSITIONAL ENERGY CO., LLC | 85,814 | 22.86 | 8,480 | 0.25 | 5.70 | ContractSUB | Rail |
| 2026-07EIA row 12109 · preliminary | ANTELOPE COAL MINE4801337 | Nebraska City6096 · NE · NAVAJO TRANSITIONAL ENERGY CO., LLC | 87,514 | 26.00 | 8,940 | 0.20 | 4.70 | ContractSUB | Rail |
| 2026-07EIA row 12112 · preliminary | CORDERO MINE4800992 | Big Stone6098 · SD · NAVAJO TRIBAL AUTHORITY | 78,496 | 45.38 | 8,527 | 0.30 | 5.60 | ContractSUB | Rail |
| 2026-07EIA row 12141 · preliminary | SPRING CREEK COAL COMPANY2401457 | Coronado6177 · AZ · NAVAJO TRANSITIONAL ENERGY CO., LLC | 59,984 | 68.40 | 9,288 | 0.35 | 5.40 | ContractSUB | Rail |
| 2026-07EIA row 12147 · preliminary | ANTELOPE COAL MINE4801337 | Fayette Power Project6179 · TX · NAVAJO TRANSITIONAL ENERGY CO., LLC | 49,183 | 33.05 | 9,021 | 0.19 | 4.70 | SpotSUB | Rail |
| 2026-07EIA row 12176 · preliminary | ANTELOPE COAL MINE4801337 | Tolk6194 · TX · TUCO | 59,382 | 41.11 | 8,829 | 0.37 | 5.40 | ContractSUB | Rail |
| 2026-07EIA row 12179 · preliminary | ANTELOPE COAL MINE4801337 | John Twitty Energy Center6195 · MO · NAVAJO TRANSITIONAL ENERGY CO., LLC | 62,186 | 48.71 | 8,925 | 0.19 | 5.00 | ContractSUB | Rail |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Cordero Rojo Mine4800992 · Campbell, Wyoming | 4,314,678 | 13.96 | 4,314,351 | 60,228,340 | County allocation estimate2.54% of eligible county production11 eligible mines / 11 sales respondents |
| Spring Creek Mine2401457 · Big Horn, Montana | 13,053,955 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
| Antelope Coal Mine4801337 · Converse, Wyoming | 14,984,446 | — | — | — | County sales or price not published1 eligible mines / 1 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.