ALL STATUSES / OPERATOR PORTFOLIO

Miles Sand & Gravel Company

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDL00797

MINE PORTFOLIO

26 of 26 mines and facilities

2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Belleville4503633 · Active6/8 quarters reportedSkagit, WASurface · MSHA: Construction Sand and Gravel037,8556031.5
Boulder Hill Pit4503481 · Intermittent6/8 quarters reportedIsland, WASurface · MSHA: Crushed, Broken Stone NEC012,7814221.5
Canyon Resources4503561 · Active6/8 quarters reportedPierce, WASurface · MSHA: Construction Sand and Gravel030,7225226.8
Fennel Resources4503423 · Active6/8 quarters reportedPierce, WASurface · MSHA: Construction Sand and Gravel074,49323366.5
Getchell Pit4503110 · Active6/8 quarters reportedSnohomish, WASurface · MSHA: Construction Sand and Gravel019,0035016.8
Hamilton Pit4503782 · Active6/8 quarters reportedSkagit, WASurface · MSHA: Construction Sand and Gravel020,7121031.5
High Ridge4503746 · Intermittent6/8 quarters reportedKitsap, WASurface · MSHA: Construction Sand and Gravel0447006.0
Island County RM4500951 · Active6/8 quarters reportedIsland, WASurface · MSHA: Construction Sand and Gravel07,1771014.8
Lacey4500670 · Active6/8 quarters reportedThurston, WASurface · MSHA: Construction Sand and Gravel030,2591121.0
Miracle Mine4503861 · Intermittent2/8 quarters reportedIsland, WASurface · MSHA: Sand, Common03,450008.3
Nooksack Pit4503802 · Intermittent6/8 quarters reportedWhatcom, WASurface · MSHA: Construction Sand and Gravel03,099206.8
Roy4503281 · Active6/8 quarters reportedPierce, WASurface · MSHA: Construction Sand and Gravel025,14715066.0
Shelton Pit4502282 · Active6/8 quarters reportedMason, WASurface · MSHA: Construction Sand and Gravel016,6262024.5
Shine Facility4502816 · Active6/8 quarters reportedJefferson, WASurface · MSHA: Construction Sand and Gravel032,48421194.0
Siper Road Pit4503341 · Active6/8 quarters reportedWhatcom, WASurface · MSHA: Construction Sand and Gravel030,8029026.0
Tenino4503119 · Active6/8 quarters reportedThurston, WASurface · MSHA: Construction Sand and Gravel046,82814327.5
BUTLER PIT4500590 · AbandonedSkagit, WASurface · MSHA: Construction Sand and Gravel——00—
CANYON PIT4500587 · AbandonedPierce, WASurface · MSHA: Construction Sand and Gravel——00—
Cheiftain Powerscreen4503634 · AbandonedSkagit, WASurface · MSHA: Construction Sand and Gravel——00—
Maytown Pit4503575 · AbandonedAdams, WASurface · MSHA: Construction Sand and Gravel——00—
Miles Sand & Gravel4500662 · AbandonedKing, WASurface · MSHA: Construction Sand and Gravel——00—
Oak Harbor Pit4500607 · AbandonedIsland, WASurface · MSHA: Construction Sand and Gravel——00—
Peterson Pit4503189 · AbandonedSkagit, WASurface · MSHA: Construction Sand and Gravel——00—
Samish Pit4500605 · AbandonedSkagit, WASurface · MSHA: Construction Sand and Gravel——00—
Shotwell Pit4502610 · AbandonedPierce, WASurface · MSHA: Construction Sand and Gravel——00—
Trapline Pit4502986 · AbandonedWhatcom, WASurface · MSHA: Construction Sand and Gravel——00—

LOCATION

Portfolio map

23 of 26 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

109

14 significant & substantial (S&S)

  1. 2025 Q112
  2. 2025 Q222
  3. 2025 Q314
  4. 2025 Q417
  5. 2026 Q121
  6. 2026 Q214
  7. 2026 Q36
  8. 2026 Q4 *3

Accident records

12

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q25
  3. 2025 Q30
  4. 2025 Q42
  5. 2026 Q11
  6. 2026 Q21
  7. 2026 Q32
  8. 2026 Q4 *0

Proposed penalties · USD

29,192.00

106 of 109 violations with amounts

  1. 2025 Q11,974
  2. 2025 Q24,390
  3. 2025 Q310,293
  4. 2025 Q43,100
  5. 2026 Q13,951
  6. 2026 Q23,950
  7. 2026 Q31,534
  8. 2026 Q4 *—

On-site inspection hours

489.25

74 inspections · 74 with hours

  1. 2025 Q161.75
  2. 2025 Q297.50
  3. 2025 Q366.50
  4. 2025 Q460.25
  5. 2026 Q165.50
  6. 2026 Q292.25
  7. 2026 Q330.00
  8. 2026 Q4 *15.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11211,974.00101261.8
2025-Q22254,390.00501197.5
2025-Q314210,293.0000666.5
2025-Q41723,100.00201060.3
2026-Q12133,951.00101165.5
2026-Q21403,950.00101492.3
2026-Q3601,534.0020730.0
2026-Q4 *31—00315.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5100356
    Shelton Pit · 4502282

    56.12032 · $151.00 proposed

  2. inspectionF03D366
    Shine Facility · 4502816

    Impoundment Spot Inspection · 1.5 on-site hours

  3. inspectionF030D04
    Shelton Pit · 4502282

    Regular Safety and Health Inspection · 13.5 on-site hours

  4. accident220260620006
    Tenino · 4503119

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Miner was cutting a belt using a box blade and cut self.

  5. inspectionF02AE72
    Miracle Mine · 4503861

    Regular Safety and Health Inspection · 1.8 on-site hours

  6. inspectionF02A880
    Lacey · 4500670

    Regular Safety and Health Inspection · 8.0 on-site hours

  7. inspectionF00804E
    Shine Facility · 4502816

    Compliance Follow-up Inspection · 1.8 on-site hours

  8. inspectionF02AE6C
    Siper Road Pit · 4503341

    Compliance Follow-up Inspection · 1.3 on-site hours

  9. inspectionF02AE6A
    Nooksack Pit · 4503802

    Regular Safety and Health Inspection · 2.0 on-site hours

  10. inspectionF02AE66
    Siper Road Pit · 4503341

    Regular Safety and Health Inspection · 5.5 on-site hours

  11. violation5107294
    Siper Road Pit · 4503341

    56.12004 · $151.00 proposed

  12. violation5107293
    Siper Road Pit · 4503341

    56.11002 · $151.00 proposed

  13. violation5107511
    Shine Facility · 4502816

    56.16005 · $151.00 proposed

  14. violation5107510
    Shine Facility · 4502816

    56.16006 · $151.00 proposed

  15. violation5107509
    Shine Facility · 4502816

    56.16003 · $151.00 proposed

  16. violation5107508
    Shine Facility · 4502816

    56.11001 · $151.00 proposed

  17. violation5107507
    Shine Facility · 4502816

    56.13015(a) · $267.00 proposed

  18. violation5107506
    Shine Facility · 4502816

    56.9300(a) · $151.00 proposed

  19. violation5107505
    Shine Facility · 4502816

    56.11001 · $151.00 proposed

  20. violation5107504
    Shine Facility · 4502816

    56.14107(a) · S&S · $697.00 proposed

  21. inspectionF0257AD
    Shine Facility · 4502816

    Regular Safety and Health Inspection · 12.8 on-site hours

  22. violation5107503
    Tenino · 4503119

    46.6(b) · $168.00 proposed

  23. violation5107502
    Tenino · 4503119

    56.4603 · $151.00 proposed

  24. violation5107501
    Tenino · 4503119

    56.4201(a)(2) · $151.00 proposed

  25. violation5107500
    Tenino · 4503119

    56.4602 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.