Marshall County Coal Resources, Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Machinery and equipment; operation and maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 75.1725(a) · $151.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Criteria—Haulage; general.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-10(h) · $151.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $226.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
MARSHALL COUNTY MINE · 460143730 CFR 75.202(a) · $226.00 proposed penalty
Fall of roof or back
MARSHALL COUNTY MINE · 4601437Accident only
Accident narrative
An unplanned roof fall occurred on 8/04/2026 at approx. 5:02am. The fall measured 16' wide by 65' long by 8' high. The fall occurred on Mainline 10 Track at 10-47 crosscut, in the track entry. The area was posted on all sides, dangered off, and will be cleaned up.
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 7.0 on-site hours reported
Protection from falls of roof, face and ribs.
MARSHALL COUNTY MINE · 460143730 CFR 75.202(a) · $226.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(d) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
MARSHALL COUNTY MINE · 460143730 CFR 75.202(a) · $226.00 proposed penalty
Slip or fall of person
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was walking back to the Miner when employee slipped and reached to stop from falling and caught small finger on rib strap. Mining systems was not a factor, compliance with rules and regulations was not a factor. PPE was a factor.
Slip or fall of person
Marshall County River Loadout · 4601438Days away from work only
Accident narrative
Employee was hosing around the tail roller of surface belt when employee tripped on a piece of grading injuring right knee. Employee continued to work until 08/11/2026 then sought treatment. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
103 (g) Written Notification Hazard Complaint Inspectio
MARSHALL COUNTY MINE · 46014373.5 on-site hours reported
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
MARSHALL COUNTY MINE · 460143730 CFR 75.363(a) · Significant and substantial (S&S) · $6,041.00 proposed penalty
Permanent splicing of trailing cables.
MARSHALL COUNTY MINE · 460143730 CFR 75.604(b) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Criteria—Belt conveyors.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-5(g) · Significant and substantial (S&S) · $7,267.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(d) · $336.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(d) · $151.00 proposed penalty
Mechanical equipment guards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1722(b) · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 75.512 · $465.00 proposed penalty
Fall of roof or back
MARSHALL COUNTY MINE · 4601437Accident only
Accident narrative
An unplanned roof fall occurred on 8/01/2026 at approx. 2:25pm. The fall measured 16' wide by 12' long by 8' high. The fall occurred in 6 North 4 East at 10 crosscut, track entry. The area was posted on all sides, dangered off, and will not be cleaned up.
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $818.00 proposed penalty
Short circuit protection of trailing cables.
MARSHALL COUNTY MINE · 460143730 CFR 75.601 · $1,037.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.