ACTIVE / OPERATOR PORTFOLIO

Mark Latham Excavation

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0096505

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Plant #1-Roll Crusher/Powerscrn3503713 · Active6/8 quarters reportedDeschutes, ORSurface · MSHA: Pumice011,1087029.3

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

7

0 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q21
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q13
  6. 2026 Q23
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

1,074.00

7 of 7 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2168
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1453
  6. 2026 Q2453
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

29.25

5 inspections · 5 with hours

  1. 2025 Q1—
  2. 2025 Q24.50
  3. 2025 Q36.50
  4. 2025 Q4—
  5. 2026 Q111.25
  6. 2026 Q27.00
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q210168.000014.5
2025-Q300—0026.5
2025-Q400—000—
2026-Q130453.0000111.3
2026-Q230453.000017.0
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5160192
    Plant #1-Roll Crusher/Powerscrn · 3503713

    47.44(b) · $151.00 proposed

  2. violation5160191
    Plant #1-Roll Crusher/Powerscrn · 3503713

    56.14112(a)(2) · $151.00 proposed

  3. violation5160190
    Plant #1-Roll Crusher/Powerscrn · 3503713

    56.14100(b) · $151.00 proposed

  4. inspectionF03C87A
    Plant #1-Roll Crusher/Powerscrn · 3503713

    Regular Safety and Health Inspection · 7.0 on-site hours

  5. violation5100692
    Plant #1-Roll Crusher/Powerscrn · 3503713

    48.29(a) · $151.00 proposed

  6. violation5100691
    Plant #1-Roll Crusher/Powerscrn · 3503713

    56.11001 · $151.00 proposed

  7. violation5100690
    Plant #1-Roll Crusher/Powerscrn · 3503713

    56.14100(b) · $151.00 proposed

  8. inspectionF02A878
    Plant #1-Roll Crusher/Powerscrn · 3503713

    Regular Safety and Health Inspection · 11.3 on-site hours

  9. inspectionF02553F
    Plant #1-Roll Crusher/Powerscrn · 3503713

    Special Emphasis Programs · 0.3 on-site hours

  10. inspectionF025540
    Plant #1-Roll Crusher/Powerscrn · 3503713

    Spot Inspection · 6.3 on-site hours

  11. inspectionF01E1B9
    Plant #1-Roll Crusher/Powerscrn · 3503713

    Regular Safety and Health Inspection · 4.5 on-site hours

  12. violation9990267
    Plant #1-Roll Crusher/Powerscrn · 3503713

    48.25 · $168.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.