Safety activity
Roof control plan.
BLACK EAGLE · 460955030 CFR 75.220(a)(1) · $1,818.00 proposed penalty
Spot Inspections
BLACK EAGLE · 4609550103(i) · 5.5 on-site hours reported
Roof control plan.
BLACK EAGLE · 460955030 CFR 75.220(a)(1) · $818.00 proposed penalty
Spot Inspections
BLACK EAGLE · 4609550103(i) · 1.5 on-site hours reported
Protection from falls of roof, face and ribs.
PANTHER EAGLE MINE · 460921230 CFR 75.202(a) · $398.00 proposed penalty
Accumulation of combustible materials.
PANTHER EAGLE MINE · 460921230 CFR 75.400 · $549.00 proposed penalty
Electric equipment; examination, testing and maintenance.
PANTHER EAGLE MINE · 460921230 CFR 75.512 · $504.00 proposed penalty
Violation — cited standard not reported
PANTHER EAGLE MINE · 4609212$320.00 proposed penalty
Accumulation of combustible materials.
PANTHER EAGLE MINE · 460921230 CFR 75.400 · $549.00 proposed penalty
Permanent splicing of trailing cables.
PANTHER EAGLE MINE · 460921230 CFR 75.604(b) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Protection from falls of roof, face and ribs.
PANTHER EAGLE MINE · 460921230 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Mine ventilation plan; submission and approval.
BLACK EAGLE · 460955030 CFR 75.370(a)(1) · $267.00 proposed penalty
Permissible electric face equipment; maintenance.
BLACK EAGLE · 460955030 CFR 75.503 · $193.00 proposed penalty
Permanent splicing of trailing cables.
BLACK EAGLE · 460955030 CFR 75.604(b) · $697.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BLACK EAGLE · 460955030 CFR 75.512 · $366.00 proposed penalty
Ventilation controls.
BLACK EAGLE · 460955030 CFR 75.333(e)(1)(ii) · $313.00 proposed penalty
Roof control plan.
PANTHER EAGLE MINE · 460921230 CFR 75.220(a)(1) · $883.00 proposed penalty
Protection from falls of roof, face and ribs.
PANTHER EAGLE MINE · 460921230 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Electric equipment; examination, testing and maintenance.
PANTHER EAGLE MINE · 460921230 CFR 75.512 · $504.00 proposed penalty
Regular Safety and Health Inspection
PANTHER EAGLE MINE · 4609212363.0 on-site hours reported
Regular Safety and Health Inspection
Glen Alum Tunnel Mine · 4609375206.0 on-site hours reported
Regular Safety and Health Inspection
BLACK EAGLE · 4609550568.3 on-site hours reported
Other safeguards.
BLACK EAGLE · 460955030 CFR 75.1403 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Verbal Hazard Complaint Inspections
Marfork Processing · 46083742.5 on-site hours reported
Spot Inspection
PANTHER EAGLE MINE · 46092126.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.