← MARFORK COAL COMPANY, LLC

MARFORK COAL COMPANY, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 5020116
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.503 · $398.00 proposed penalty

  2. Roof control plan.

    violationRecord 5020115
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  3. Examination and maintenance of firefighting equipment.

    violationRecord 5020114
    Glen Alum Tunnel Mine · 4609375

    30 CFR 77.1110 · $151.00 proposed penalty

  4. Escapeway maps.

    violationRecord 5020113
    Glen Alum Tunnel Mine · 4609375

    30 CFR 75.1505(b) · $151.00 proposed penalty

  5. Maintenance of incombustible content of rock dust.

    violationRecord 5026186
    BLACK EAGLE · 4609550

    30 CFR 75.403 · $226.00 proposed penalty

  6. Permanent splicing of trailing cables.

    violationRecord 5026185
    BLACK EAGLE · 4609550

    30 CFR 75.604(b) · $697.00 proposed penalty

  7. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 5026184
    BLACK EAGLE · 4609550

    30 CFR 75.1107-4(c) · $151.00 proposed penalty

  8. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 5020713
    BLACK EAGLE · 4609550

    30 CFR 75.1103-4(a)(1)(i) · $465.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5020712
    BLACK EAGLE · 4609550

    30 CFR 75.370(a)(1) · $883.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5020711
    BLACK EAGLE · 4609550

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  11. Roof control plan.

    violationRecord 5020710
    BLACK EAGLE · 4609550

    30 CFR 75.220(a)(1) · $1,818.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5020709
    BLACK EAGLE · 4609550

    30 CFR 75.370(a)(1) · $883.00 proposed penalty

  13. Weekly examination.

    violationRecord 5097944
    BLACK EAGLE · 4609550

    30 CFR 75.364(h) · $151.00 proposed penalty

  14. Violation — cited standard not reported

    violationRecord 5097943
    BLACK EAGLE · 4609550

    $1,037.00 proposed penalty

  15. Quantity and location of firefighting equipment.

    violationRecord 5097942
    BLACK EAGLE · 4609550

    30 CFR 75.1100-2(d) · $151.00 proposed penalty

  16. Approval of other fire suppression devices.

    violationRecord 5097941
    BLACK EAGLE · 4609550

    30 CFR 75.1107-13(h) · $151.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5020708
    BLACK EAGLE · 4609550

    30 CFR 75.400 · $1,126.00 proposed penalty

  18. Roof control plan.

    violationRecord 5020707
    BLACK EAGLE · 4609550

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5027814
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  20. Quantity and location of firefighting equipment.

    violationRecord 5026183
    BLACK EAGLE · 4609550

    30 CFR 75.1100-2(f) · $313.00 proposed penalty

  21. Mechanical equipment guards.

    violationRecord 5026182
    BLACK EAGLE · 4609550

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  22. Refuge alternatives.

    violationRecord 5020706
    BLACK EAGLE · 4609550

    30 CFR 75.1506(h)(2) · $1,037.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5131584
    BLACK EAGLE · 4609550

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  24. Power wires and cables; insulation and protection.

    violationRecord 5026181
    BLACK EAGLE · 4609550

    30 CFR 75.517 · $592.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5026180
    BLACK EAGLE · 4609550

    30 CFR 75.400 · $697.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.