Mach Mining LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $465.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $465.00 proposed penalty
Inspection of fire suppression devices.
Mach #1 Mine · 110314130 CFR 75.1107-16(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Maintenance of incombustible content of rock dust.
Mach #1 Mine · 110314130 CFR 75.403 · $245.00 proposed penalty
Permissible electric face equipment; maintenance.
Mach #1 Mine · 110314130 CFR 75.503 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $465.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 7.8 on-site hours reported
Ventilation controls.
Mach #1 Mine · 110314130 CFR 75.333(h) · $267.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mach #1 Mine · 110314130 CFR 75.1731(a) · $267.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $465.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 7.5 on-site hours reported
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mach #1 Mine · 110314130 CFR 75.1731(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Power wires and cables; insulation and protection.
Mach #1 Mine · 110314130 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 8.0 on-site hours reported
Machinery and equipment; operation and maintenance.
Mach #1 Mine · 110314130 CFR 75.1725(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $504.00 proposed penalty
Permanent splicing of trailing cables.
Mach #1 Mine · 110314130 CFR 75.604(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Power wires and cables; insulation and protection.
Mach #1 Mine · 110314130 CFR 75.517 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $465.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mach #1 Mine · 110314130 CFR 75.1731(b) · $245.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $465.00 proposed penalty
Protection from falls of roof, face and ribs.
Mach #1 Mine · 110314130 CFR 75.202(a) · $288.00 proposed penalty
Permissible electric face equipment; maintenance.
Mach #1 Mine · 110314130 CFR 75.503 · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.