ACTIVE / OPERATOR PORTFOLIO

Lion Cave Materials

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0173093

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Lion Cave Materials Briggs Pit4105243 · Active6/8 quarters reportedComal, TXSurface · MSHA: Crushed, Broken Limestone NEC035,69512039.5

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

12

0 significant & substantial (S&S)

  1. 2025 Q11
  2. 2025 Q20
  3. 2025 Q32
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q20
  7. 2026 Q38
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

1,812.00

12 of 12 violations with amounts

  1. 2025 Q1151
  2. 2025 Q2—
  3. 2025 Q3302
  4. 2025 Q4—
  5. 2026 Q1151
  6. 2026 Q2—
  7. 2026 Q31,208
  8. 2026 Q4 *—

On-site inspection hours

39.50

7 inspections · 7 with hours

  1. 2025 Q15.25
  2. 2025 Q2—
  3. 2025 Q315.25
  4. 2025 Q4—
  5. 2026 Q13.50
  6. 2026 Q2—
  7. 2026 Q315.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q110151.000015.3
2025-Q200—000—
2025-Q320302.0000215.3
2025-Q400—000—
2026-Q110151.000023.5
2026-Q200—000—
2026-Q3801,208.0000215.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF01AC4D
    Lion Cave Materials Briggs Pit · 4105243

    Compliance Follow-up Inspection · 0.5 on-site hours

  2. inspectionF01AC4C
    Lion Cave Materials Briggs Pit · 4105243

    Regular Safety and Health Inspection · 15.0 on-site hours

  3. violation5178448
    Lion Cave Materials Briggs Pit · 4105243

    56.23003(b) · $151.00 proposed

  4. violation5178447
    Lion Cave Materials Briggs Pit · 4105243

    56.12028 · $151.00 proposed

  5. violation5178446
    Lion Cave Materials Briggs Pit · 4105243

    50.30(a) · $151.00 proposed

  6. violation5178445
    Lion Cave Materials Briggs Pit · 4105243

    45.4(b) · $151.00 proposed

  7. violation5178444
    Lion Cave Materials Briggs Pit · 4105243

    56.18002(d) · $151.00 proposed

  8. violation5178443
    Lion Cave Materials Briggs Pit · 4105243

    56.15001 · $151.00 proposed

  9. violation5178442
    Lion Cave Materials Briggs Pit · 4105243

    56.12023 · $151.00 proposed

  10. violation5178441
    Lion Cave Materials Briggs Pit · 4105243

    56.14132(b)(1) · $151.00 proposed

  11. inspectionF017F88
    Lion Cave Materials Briggs Pit · 4105243

    Regular Safety and Health Inspection · 3.3 on-site hours

  12. inspectionF017F87
    Lion Cave Materials Briggs Pit · 4105243

    Verbal Hazard Complaint Inspections · 0.3 on-site hours

  13. violation5172625
    Lion Cave Materials Briggs Pit · 4105243

    46.9(a) · $151.00 proposed

  14. inspectionF02980B
    Lion Cave Materials Briggs Pit · 4105243

    Spot Inspection · 10.3 on-site hours

  15. inspectionF015BD3
    Lion Cave Materials Briggs Pit · 4105243

    Regular Safety and Health Inspection · 5.0 on-site hours

  16. violation5009209
    Lion Cave Materials Briggs Pit · 4105243

    56.14201(b) · $151.00 proposed

  17. violation5009208
    Lion Cave Materials Briggs Pit · 4105243

    56.14107(a) · $151.00 proposed

  18. inspectionF017901
    Lion Cave Materials Briggs Pit · 4105243

    Regular Safety and Health Inspection · 5.3 on-site hours

  19. violation8821729
    Lion Cave Materials Briggs Pit · 4105243

    50.30(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.