Coal production
0reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Ball Road Quarry3503771 · Active6/8 quarters reported | Clackamas, ORSurface · MSHA: Crushed, Broken Basalt | 0 | 28,368 | 1 | 0 | 13.3 |
| Farmington Pit3500634 · Active6/8 quarters reported | Washington, ORSurface · MSHA: Crushed, Broken Traprock | 0 | 104,147 | 3 | 2 | 75.8 |
| FISHER ISLAND PLANT3500463 · Active6/8 quarters reported | Benton, ORSurface · MSHA: Crushed, Broken Traprock | 0 | 20,143 | 3 | 1 | 24.5 |
| KEIZER PIT & PLANT3500503 · Active6/8 quarters reported | Marion, ORSurface · MSHA: Construction Sand and Gravel | 0 | 8,658 | 0 | 0 | 10.5 |
| KIRTLAND3500512 · Active6/8 quarters reported | Jackson, ORSurface · MSHA: Construction Sand and Gravel | 0 | 59,720 | 2 | 0 | 44.8 |
| METRO PORTABLE #13503558 · Active6/8 quarters reported | Columbia, ORSurface · MSHA: Crushed, Broken Stone NEC | 0 | 10,958 | 1 | 2 | 5.5 |
| METRO PORTABLE #23503527 · Active6/8 quarters reported | Multnomah, ORSurface · MSHA: Crushed, Broken Stone NEC | 0 | 22,771 | 1 | 2 | 38.0 |
| METRO PORTABLE #33500426 · Active6/8 quarters reported | Columbia, ORSurface · MSHA: Crushed, Broken Stone NEC | 0 | 54,931 | 1 | 0 | 30.0 |
| METRO PORTABLE #43500495 · Active6/8 quarters reported | Columbia, WASurface · MSHA: Construction Sand and Gravel | 0 | 6,004 | 0 | 0 | 2.8 |
| REED PIT3502968 · Active6/8 quarters reported | Marion, ORSurface · MSHA: Construction Sand and Gravel | 0 | 91,878 | 9 | 3 | 63.3 |
| ROGUE PORTABLE #23503595 · Active6/8 quarters reported | Klamath, ORSurface · MSHA: Crushed, Broken Stone NEC | 0 | 15,952 | 5 | 0 | 30.8 |
| ROGUE PORTABLE #33503667 · Active6/8 quarters reported | Jackson, ORSurface · MSHA: Crushed, Broken Stone NEC | 0 | 14,606 | 3 | 0 | 24.5 |
| ROGUE PORTABLE #43503131 · Active6/8 quarters reported | Jackson, ORSurface · MSHA: Crushed, Broken Traprock | 0 | 16,418 | 0 | 2 | 22.0 |
| ROGUE PORTABLE #83503639 · Active6/8 quarters reported | Deschutes, ORSurface · MSHA: Crushed, Broken Stone NEC | 0 | 18,992 | 4 | 0 | 28.8 |
| STAYTON ROCK PIT3500521 · Active6/8 quarters reported | Linn, ORSurface · MSHA: Construction Sand and Gravel | 0 | 8,910 | 1 | 0 | 11.0 |
| WATERVIEW3503605 · Active6/8 quarters reported | Columbia, ORSurface · MSHA: Construction Sand and Gravel | 0 | 46,015 | 5 | 0 | 35.3 |
| WILLAMETTE PORTABLE #13503321 · Active6/8 quarters reported | Clatsop, ORSurface · MSHA: Crushed, Broken Traprock | 0 | 7,353 | 2 | 0 | 19.0 |
| WILLAMETTE PORTABLE #33503642 · Active6/8 quarters reported | Linn, ORSurface · MSHA: Crushed, Broken Stone NEC | 0 | 15,940 | 3 | 0 | 32.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
18 of 18 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 18 mines listed under this operator were checked; 18 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 100,656 | 0.00 | 145 | 18/18 mines reporting |
| 2025 Q2 | 0 | 90,766 | 0.00 | 131 | 18/18 mines reporting |
| 2025 Q3 | 0 | 92,996 | 0.00 | 127 | 18/18 mines reporting |
| 2025 Q4 | 0 | 85,176 | 0.00 | 117 | 18/18 mines reporting |
| 2026 Q1 | 0 | 88,816 | 0.00 | 128 | 18/18 mines reporting |
| 2026 Q2 | 0 | 93,354 | 0.00 | 126 | 18/18 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
2 significant & substantial (S&S)
0 records classified as fatality
44 of 44 violations with amounts
62 inspections · 62 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 4 | 0 | 1,773.00 | 0 | 0 | 8 | 76.8 |
| 2025-Q2 | 9 | 1 | 1,876.00 | 1 | 0 | 12 | 89.0 |
| 2025-Q3 | 0 | 0 | — | 2 | 0 | 4 | 45.3 |
| 2025-Q4 | 13 | 1 | 2,157.00 | 0 | 0 | 14 | 101.0 |
| 2026-Q1 | 1 | 0 | 151.00 | 1 | 0 | 6 | 56.8 |
| 2026-Q2 | 5 | 0 | 769.00 | 4 | 0 | 8 | 79.8 |
| 2026-Q3 | 12 | 0 | 1,838.00 | 4 | 0 | 10 | 63.5 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
Special Emphasis Programs · 0.8 on-site hours
56.14100(b) · $151.00 proposed
56.12004 · $151.00 proposed
Regular Safety and Health Inspection · 6.3 on-site hours
46.9(d)(1) · $151.00 proposed
56.12004 · $151.00 proposed
56.11002 · $177.00 proposed
46.9(a) · $151.00 proposed
56.12004 · $151.00 proposed
Regular Safety and Health Inspection · 18.5 on-site hours
Compliance Follow-up Inspection · 1.3 on-site hours
50.20(a) · $151.00 proposed
50.20(a) · $151.00 proposed
103 (g) Written Notification Hazard Complaint Inspectio · 3.3 on-site hours
56.12004 · $151.00 proposed
56.12008 · $151.00 proposed
Regular Safety and Health Inspection · 5.8 on-site hours
Regular Safety and Health Inspection · 5.0 on-site hours
FIRE · ACCIDENT ONLY
Miner was starting up the crusher, had just powered everything on in the MCC then went up into the control tower and heard a loud pop noise and saw smoke come out of MCC knew there was a fire and evacuated and called supervisor. Fire department and power company came out to shut off electrical and put out the fire, fire department is investigating results pending.
Non-Injury Accident Investigation · 1.3 on-site hours
HANDLING OF MATERIALS · DYS AWY FRM WRK & RESTRCTD ACT
Miner was shoveling light build up off of a catwalk. Felt something in neck that brought them to their knee. Requested medical, CT scan was done. No known injury, miner was released back to work. Pain continued went back to Dr on 07/20/2026 and got a doctor note requiring time off/ modified duty.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Team member climbed onto a water truck to check the water level. As they were climbing back down, their left ring became caught on a step, causing a snag incident.
Regular Safety and Health Inspection · 18.0 on-site hours
56.12004 · $151.00 proposed
HANDLING OF MATERIALS · DYS AWY FRM WRK & RESTRCTD ACT
Pulling cable out of the water during repairs, lead to a strain in lumbar region.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.