Coal production
0reported short tons
ALL STATUSES / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Benjamin4202528 · Active6/8 quarters reported | Utah, UTSurface · MSHA: Construction Sand and Gravel | 0 | 26,325 | 10 | 1 | 27.3 |
| Bluffdale Pit4202179 · Active6/8 quarters reported | Utah, UTSurface · MSHA: Construction Sand and Gravel | 0 | 56,197 | 10 | 1 | 31.5 |
| Brigham Pit4202523 · Active6/8 quarters reported | Box Elder, UTSurface · MSHA: Construction Sand and Gravel | 0 | 12,002 | 14 | 0 | 28.5 |
| Crusher 10504296 · Intermittent6/8 quarters reported | Mesa, COSurface · MSHA: Construction Sand and Gravel | 0 | 15,246 | 3 | 0 | 18.3 |
| Crusher 20504645 · Intermittent6/8 quarters reported | Delta, COSurface · MSHA: Construction Sand and Gravel | 0 | 18,841 | 0 | 0 | 15.0 |
| Crusher 30504593 · Intermittent6/8 quarters reported | Emery, UTSurface · MSHA: Construction Sand and Gravel | 0 | 30,510 | 1 | 1 | 31.8 |
| Crusher #60504746 · Intermittent5/8 quarters reported | Mesa, COSurface · MSHA: Construction Sand and Gravel | 0 | 11,076 | 0 | 0 | 10.5 |
| Erda Pit4201479 · Active6/8 quarters reported | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | 0 | 6,406 | 0 | 0 | 8.0 |
| Gentry Pit1001668 · Intermittent | Minidoka, IDSurface · MSHA: Construction Sand and Gravel | — | — | 1 | 0 | 3.0 |
| Grantsville Pit4202637 · Active6/8 quarters reported | Tooele, UTSurface · MSHA: Construction Sand and Gravel | 0 | 20,412 | 24 | 0 | 45.0 |
| Grey Goose0503869 · Intermittent6/8 quarters reported | Grand, COSurface · MSHA: Construction Sand and Gravel | 0 | 18,469 | 3 | 0 | 22.0 |
| Herriman Pit4201823 · Active6/8 quarters reported | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | 0 | 12,948 | 4 | 0 | 22.0 |
| HIGHLAND PIT4200941 · Active6/8 quarters reported | Utah, UTSurface · MSHA: Construction Sand and Gravel | 0 | 36,754 | 19 | 3 | 35.8 |
| HP 300 (Crusher 4)0504594 · Intermittent6/8 quarters reported | Delta, COSurface · MSHA: Construction Sand and Gravel | 0 | 7,676 | 1 | 0 | 20.5 |
| Hyrum Pit4202360 · Active6/8 quarters reported | Cache, UTSurface · MSHA: Construction Sand and Gravel | 0 | 35,721 | 12 | 0 | 36.5 |
| Little Mountain4200400 · Intermittent3/8 quarters reported | Box Elder, UTSurface · MSHA: Construction Sand and Gravel | 0 | 931 | 5 | 0 | 4.8 |
| Maryland Creek0503800 · Active6/8 quarters reported | Summit, COSurface · MSHA: Construction Sand and Gravel | 0 | 25,020 | 17 | 0 | 48.3 |
| MONA PIT4202212 · Active6/8 quarters reported | Juab, UTSurface · MSHA: Construction Sand and Gravel | 0 | 46,643 | 8 | 0 | 37.8 |
| Parley's Stone4202102 · Active6/8 quarters reported | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | 0 | 26,978 | 11 | 0 | 41.8 |
| Pit #1 43rd Ave0202867 · Active6/8 quarters reported | Maricopa, AZSurface · MSHA: Construction Sand and Gravel | 0 | 93,688 | 16 | 3 | 35.3 |
| Plant 1 Avondale0203390 · Active6/8 quarters reported | Maricopa, AZSurface · MSHA: Construction Sand and Gravel | 0 | 28,975 | 19 | 1 | 33.5 |
| Portable Crusher Unit F4202042 · Intermittent6/8 quarters reported | Sweetwater, WYSurface · MSHA: Construction Sand and Gravel | 0 | 31,109 | 7 | 1 | 39.5 |
| Stockton Pit4202480 · Active6/8 quarters reported | Tooele, UTSurface · MSHA: Construction Sand and Gravel | 0 | 51,526 | 10 | 1 | 34.5 |
| Walker Sand & Gravel1000772 · Intermittent6/8 quarters reported | Blaine, IDSurface · MSHA: Construction Sand and Gravel | 0 | 20,276 | 2 | 2 | 8.5 |
| Washplant 10504873 · Intermittent6/8 quarters reported | Mesa, COSurface · MSHA: Construction Sand and Gravel | 0 | 4,732 | 1 | 0 | 12.5 |
| Washplant 30504565 · Intermittent6/8 quarters reported | Mesa, COSurface · MSHA: Construction Sand and Gravel | 0 | 6,045 | 0 | 0 | 9.3 |
| Washplant 40503809 · Active6/8 quarters reported | La Plata, COSurface · MSHA: Construction Sand and Gravel | 0 | 3,961 | 3 | 0 | 21.0 |
| WASHPLANT 54201736 · Intermittent6/8 quarters reported | Grand, UTSurface · MSHA: Construction Sand and Gravel | 0 | 7,892 | 0 | 0 | 44.5 |
| Wellsville Pit4201960 · Intermittent6/8 quarters reported | Cache, UTSurface · MSHA: Construction Sand and Gravel | 0 | 8,676 | 2 | 0 | 18.5 |
| West Valley4201980 · Intermittent6/8 quarters reported | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | 0 | 25,253 | 12 | 0 | 34.5 |
| 1976 PIONEER PLANT #10504046 · Abandoned | Mesa, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| 19 Road Pit0503877 · Abandoned | Mesa, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Bauer Pit4202465 · Abandoned | Tooele, UTSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| BRADBURY PIT0503472 · Abandoned | Mesa, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Buckeye Plant0203165 · Temporarily Idled6/8 quarters reported | Maricopa, AZSurface · MSHA: Construction Sand and Gravel | 0 | 580 | 0 | 0 | 1.0 |
| CEDARAPIDS PLANT #2X3100503801 · Abandoned | Mesa, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| CEDAR RAPIDS PLANT #30504559 · Abandoned | Moffat, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Cottonwood Quarry0505099 · Abandoned2/8 quarters reported | Grand, COSurface · MSHA: Construction Sand and Gravel | 0 | 0 | 1 | 0 | 0.5 |
| Crusher 50505047 · Temporarily Idled6/8 quarters reported | La Plata, COSurface · MSHA: Construction Sand and Gravel | 0 | 1,966 | 0 | 0 | 13.0 |
| Elam Pit0503937 · Abandoned | Mesa, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Extec S-5 Track Mounted Screen sn96170502366 · Abandoned | Summit, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Huffer Pit0501950 · Abandoned | Mesa, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Jaffee Pit0502139 · Abandoned | Pitkin, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| KC-Portable 24801625 · Abandoned | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| KC (WY)-Portable 34801626 · Abandoned | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Lewis & Lewis, Portable 014801482 · Abandoned1/8 quarters reported | Sweetwater, WYSurface · MSHA: Construction Sand and Gravel | 0 | 520 | 1 | 0 | 1.0 |
| Metso LT106 Track Mounted Jaw Crusher0504872 · Abandoned | Routt, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Mona4201545 · Abandoned | Salt Lake, UTSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Portable Crusher Unit B4201963 · Abandoned6/8 quarters reported | Bannock, IDSurface · MSHA: Construction Sand and Gravel | 0 | 5,849 | 8 | 0 | 9.0 |
| Portable-JCI 6203 Track Screen1002146 · Abandoned | Minidoka, IDSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Powerscreen 2100-21002147 · Abandoned | Minidoka, IDSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Roadrunner Screen1001916 · Abandoned | Minidoka, IDSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Snowstorm Portable Plant0501013 · Abandoned | Clear Creek, COSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Track Plant 10504616 · Temporarily Idled6/8 quarters reported | Routt, COSurface · MSHA: Construction Sand and Gravel | 0 | 405 | 0 | 0 | — |
| Walker Sand & Gravel1002021 · Abandoned | Blaine, IDSurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
46 of 55 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 55 mines listed under this operator were checked; 35 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 80,234 | 0.00 | 145 | 32/35 mines reporting |
| 2025 Q2 | 0 | 101,435 | 0.00 | 166 | 33/35 mines reporting |
| 2025 Q3 | 0 | 107,840 | 0.00 | 165 | 32/35 mines reporting |
| 2025 Q4 | 0 | 126,964 | 0.00 | 200 | 34/35 mines reporting |
| 2026 Q1 | 0 | 133,073 | 0.00 | 233 | 33/35 mines reporting |
| 2026 Q2 | 0 | 150,062 | 0.00 | 248 | 33/35 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
42 significant & substantial (S&S)
0 records classified as fatality
213 of 225 violations with amounts
126 inspections · 126 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 10 | 2 | 1,818.00 | 1 | 0 | 12 | 61.8 |
| 2025-Q2 | 59 | 14 | 21,721.00 | 1 | 0 | 21 | 173.3 |
| 2025-Q3 | 40 | 7 | 14,751.00 | 2 | 0 | 24 | 122.0 |
| 2025-Q4 | 44 | 10 | 39,096.00 | 0 | 0 | 21 | 137.3 |
| 2026-Q1 | 29 | 5 | 11,254.00 | 5 | 0 | 15 | 68.5 |
| 2026-Q2 | 21 | 0 | 9,306.00 | 5 | 0 | 15 | 109.0 |
| 2026-Q3 | 20 | 4 | 3,688.00 | 0 | 0 | 16 | 118.3 |
| 2026-Q4 * | 2 | 0 | — | 0 | 0 | 2 | 14.0 |
All violations issued in the selected period. Counts combine subsections.
56.4102 · S&S
56.4102
56.20003(a) · $313.00 proposed
56.4102 · $465.00 proposed
Mine Idle Activity · 0.8 on-site hours
56.1000 · $151.00 proposed
Regular Safety and Health Inspection · 15.3 on-site hours
56.9301 · S&S · $313.00 proposed
56.12032 · $151.00 proposed
56.12008 · $151.00 proposed
Regular Safety and Health Inspection · 5.5 on-site hours
Regular Safety and Health Inspection · 9.3 on-site hours
56.14107(a) · $151.00 proposed
Regular Safety and Health Inspection · 15.5 on-site hours
56.12004 · $366.00 proposed
Regular Safety and Health Inspection · 10.5 on-site hours
Regular Safety and Health Inspection · 7.5 on-site hours
56.12004 · $151.00 proposed
56.12032 · $151.00 proposed
56.12004 · $151.00 proposed
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
On June 25, 2026, an employee sustained a forearm injury from a metal shard while realigning a wedged tail pulley bearing, which later required surgical removal and stitches on July 15, 2026.
MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT
EE was grinding on rusty metal, and dust went into EE's eyes.
Regular Safety and Health Inspection · 15.8 on-site hours
56.14107(a) · $151.00 proposed
56.14107(a) · $151.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.