1 of 1 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Kemmerer Mine4800086 · Active6/8 quarters reportedLincoln, WYSurface · MSHA: Coal (Bituminous)1,991,453406,4552310360.3

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

23

2 significant & substantial (S&S)

  1. 2025 Q111
  2. 2025 Q20
  3. 2025 Q37
  4. 2025 Q42
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q33
  8. 2026 Q4 *0

Accident records

10

0 records classified as fatality

  1. 2025 Q12
  2. 2025 Q22
  3. 2025 Q31
  4. 2025 Q42
  5. 2026 Q11
  6. 2026 Q21
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

12,942.00

20 of 23 violations with amounts

  1. 2025 Q13,332
  2. 2025 Q2—
  3. 2025 Q39,308
  4. 2025 Q4302
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

360.25

11 inspections · 11 with hours

  1. 2025 Q1124.25
  2. 2025 Q23.00
  3. 2025 Q3109.50
  4. 2025 Q476.50
  5. 2026 Q14.50
  6. 2026 Q26.00
  7. 2026 Q336.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11103,332.00203124.3
2025-Q200—2013.0
2025-Q3729,308.00102109.5
2025-Q420302.0020176.5
2026-Q100—1014.5
2026-Q200—1026.0
2026-Q330—10136.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. accident220251810004
    Kemmerer Mine · 4800086

    HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY

    Accident narrative

    Employee was removing boom shims from a 6060 Shovel. The shim moved unexpectedly and pinched the employee's finger between it and a bolt. The employee received 3 stitches in the left ring finger.

  2. inspectionF019ABE
    Kemmerer Mine · 4800086

    103 (g) Written Notification Hazard Complaint Inspectio · 3.0 on-site hours

  3. accident220251410004
    Kemmerer Mine · 4800086

    DISORDERS (REPEATED TRAUMA) · OCCUPATNAL ILLNESS NOT DEG 1-6

    Accident narrative

    Employee was diagnosed with carpel tunnel in the right hand. The physician stated the injury is from operating the controls on a dozer. Employee required surgery.

  4. inspectionF019AB0
    Kemmerer Mine · 4800086

    103 (g) Written Notification Hazard Complaint Inspectio · 12.5 on-site hours

  5. violation9905143
    Kemmerer Mine · 4800086

    77.1713(a) · $1,126.00 proposed

  6. accident220250630010
    Kemmerer Mine · 4800086

    SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY

    Accident narrative

    While walking to the steam bay to retrieve a truck EE slipped on some ice and trying to catch themself grabbed the side of a dumpster and experienced pain in the shoulder, neck and chest.

  7. inspection6945373
    Kemmerer Mine · 4800086

    Spot Inspection · 11.5 on-site hours

  8. accident220250990012
    Kemmerer Mine · 4800086

    POWERED HAULAGE · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee stated they had a sore neck from a truck bed coming down onto the frame unusually hard. The employee saw an Ortho who ordered an MRI and the Ortho will not let the employee return to work.

  9. violation9905391
    Kemmerer Mine · 4800086

    77.404(a) · $549.00 proposed

  10. violation9904848
    Kemmerer Mine · 4800086

    77.1104 · $165.00 proposed

  11. violation9904847
    Kemmerer Mine · 4800086

    77.505 · $165.00 proposed

  12. violation9904846
    Kemmerer Mine · 4800086

    77.401(a)(2) · $245.00 proposed

  13. violation9904845
    Kemmerer Mine · 4800086

    77.205(b) · $165.00 proposed

  14. violation9904844
    Kemmerer Mine · 4800086

    77.400(a) · $245.00 proposed

  15. violation9904934
    Kemmerer Mine · 4800086

    77.505 · $165.00 proposed

  16. violation9904843
    Kemmerer Mine · 4800086

    77.1104 · $177.00 proposed

  17. violation9904842
    Kemmerer Mine · 4800086

    77.206(a) · $165.00 proposed

  18. violation9722239
    Kemmerer Mine · 4800086

    77.208(e) · $165.00 proposed

  19. inspection6944898
    Kemmerer Mine · 4800086

    Regular Safety and Health Inspection · 100.3 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS268,0845 rows · 1 receiving plants
HEAT CONTENT · BTU/LB9,981Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.52 / 6.09Separate averages over measured receipts
DELIVERED COST · USD/TON53.15100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *95,6579,9890.586.2253.18
2025-Q4172,4279,9760.486.0253.13
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2025-12EIA row 34709 · finalKEMMERER MINE4800086Naughton4162 · WY · KEMMERER60,42853.7310,0890.465.50ContractSUBTram/conveyor
2025-11EIA row 31726 · finalKEMMERER MINE4800086Naughton4162 · WY · KEMMERER57,73652.649,8870.476.50ContractSUBTram/conveyor
2025-10EIA row 28774 · finalKEMMERER MINE4800086Naughton4162 · WY · KEMMERER54,26352.989,9470.516.10ContractSUBTram/conveyor
2025-09EIA row 25706 · finalKEMMERER MINE4800086Naughton4162 · WY · KEMMERER50,58052.869,9290.586.50ContractSUBTram/conveyor
2025-08EIA row 22556 · finalKEMMERER MINE4800086Naughton4162 · WY · KEMMERER45,07753.5510,0580.585.90ContractSUBTram/conveyor
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Kemmerer Mine4800086 · Lincoln, Wyoming2,417,282———County sales or price not published1 eligible mines / 1 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.