Kanawha Eagle Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof bolting.
Winchester Peerless Rachel Mine · 460925830 CFR 75.204(f)(7) · $267.00 proposed penalty
Ventilation controls.
Winchester Peerless Rachel Mine · 460925830 CFR 75.333(h) · $151.00 proposed penalty
Other safeguards.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1403 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Escapeways; bituminous and lignite mines.
Winchester Peerless Rachel Mine · 460925830 CFR 75.380(d)(7)(vii)(A) · $267.00 proposed penalty
Verbal Hazard Complaint Inspections
South Hollow Prep Plant and Loadout · 46030856.0 on-site hours reported
Surface installations; general.
South Hollow Prep Plant and Loadout · 460308530 CFR 77.200 · $267.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1107-1(a)(3)(ii) · $267.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $288.00 proposed penalty
Roof bolting.
Winchester Peerless Rachel Mine · 460925830 CFR 75.204(f)(7) · $267.00 proposed penalty
Escapeways; bituminous and lignite mines.
Winchester Peerless Rachel Mine · 460925830 CFR 75.380(d)(1) · $883.00 proposed penalty
Accumulation of combustible materials.
Winchester Peerless Rachel Mine · 460925830 CFR 75.400 · $504.00 proposed penalty
Other safeguards.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1403 · $165.00 proposed penalty
Spot Inspections
NORTH EAGLE MINE · 4608759103(i) · 6.0 on-site hours reported
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 6.0 on-site hours reported
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $642.00 proposed penalty
Emergency tethers.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1714-6 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester Peerless Rachel Mine · 460925830 CFR 75.202(a) · $398.00 proposed penalty
Storage of materials.
Winchester Peerless Rachel Mine · 460925830 CFR 77.208(d) · $267.00 proposed penalty
Other safeguards.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1403 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Loading and haulage equipment; operation.
Winchester Peerless Rachel Mine · 460925830 CFR 77.1607(z) · $267.00 proposed penalty
Loading and haulage equipment; installations.
Winchester Peerless Rachel Mine · 460925830 CFR 77.1605(p) · $267.00 proposed penalty
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 6.3 on-site hours reported
Permanent splicing of trailing cables.
Winchester Peerless Rachel Mine · 460925830 CFR 75.604(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $245.00 proposed penalty
Spot Inspections
NORTH EAGLE MINE · 4608759103(i) · 7.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.