Kanawha Eagle Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Permissible electric face equipment; maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.503 · $755.00 proposed penalty
Accumulation of combustible materials.
NORTH EAGLE MINE · 460875930 CFR 75.400 · $366.00 proposed penalty
Electric equipment; examination, testing and maintenance.
NORTH EAGLE MINE · 460875930 CFR 75.512 · $288.00 proposed penalty
Mechanical equipment guards.
NORTH EAGLE MINE · 460875930 CFR 75.1722(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Other safeguards.
NORTH EAGLE MINE · 460875930 CFR 75.1403 · $366.00 proposed penalty
Accumulation of combustible materials.
NORTH EAGLE MINE · 460875930 CFR 75.400 · $366.00 proposed penalty
Automatic fire sensors.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1103-1(a) · $151.00 proposed penalty
Water sprinkler systems; general.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1101-6 · $313.00 proposed penalty
Water sprinkler systems; general.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1101-6 · $313.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1107-1(a)(3)(ii) · $151.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1106-3(a)(2) · $226.00 proposed penalty
Roof bolting.
Winchester Peerless Rachel Mine · 460925830 CFR 75.204(c)(1) · $209.00 proposed penalty
Permissible electric face equipment; maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.503 · $226.00 proposed penalty
Accumulation of combustible materials.
Winchester Peerless Rachel Mine · 460925830 CFR 75.400 · $267.00 proposed penalty
Inspection of fire suppression devices.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1107-16(b) · $151.00 proposed penalty
Inspection of fire suppression devices.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1107-16(b) · $151.00 proposed penalty
Accumulation of combustible materials.
Winchester Peerless Rachel Mine · 460925830 CFR 75.400 · $267.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 7.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
NORTH EAGLE MINE · 460875930 CFR 75.512 · $288.00 proposed penalty
Ventilation controls.
NORTH EAGLE MINE · 460875930 CFR 75.333(h) · $209.00 proposed penalty
Power wires and cables; insulation and protection.
Winchester Peerless Rachel Mine · 460925830 CFR 75.517 · $1,550.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $336.00 proposed penalty
Permanent splicing of trailing cables.
NORTH EAGLE MINE · 460875930 CFR 75.604(b) · $697.00 proposed penalty
Other safeguards.
NORTH EAGLE MINE · 460875930 CFR 75.1403 · $465.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.