← Kanawha Eagle Mining, LLC

Kanawha Eagle Mining, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Fall of roof or back

    accidentRecord 220263020020
    Winchester Peerless Rachel Mine · 4609258

    Accident only

    Accident narrative

    An unintentional roof fall occurred on the #3 Section, #6 Entry, spad # 50035. Area was dangered off. No injuries or entrapments occurred. MSHA and WVMHST Officials were notified and are currently on site conducting investigation.

  2. Non-Injury Accident Investigation

    inspectionRecord F0402EE
    Winchester Peerless Rachel Mine · 4609258

    0.0 on-site hours reported

  3. Spot Inspections

    inspectionRecord F00585E
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 0.0 on-site hours reported

  4. Violation — cited standard not reported

    violationRecord 9847616
    Winchester Peerless Rachel Mine · 4609258
  5. Electric equipment; examination, testing and maintenance.

    violationRecord 5134441
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.512

  6. Condition and examination of firefighting equipment.

    violationRecord 5134440
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1100-3

  7. Power wires and cables; insulation and protection.

    violationRecord 5021900
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.517 · Significant and substantial (S&S)

  8. Permanent splicing of trailing cables.

    violationRecord 5021899
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.604(b) · Significant and substantial (S&S)

  9. Roof testing and scaling.

    violationRecord 5021898
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.211(d)

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 5021897
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.512

  11. Mine ventilation plan; submission and approval.

    violationRecord 5021896
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1)

  12. Electric equipment; examination, testing and maintenance.

    violationRecord 5021895
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.512

  13. Roof control plan.

    violationRecord 5021894
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.220(a)(1) · Significant and substantial (S&S)

  14. Mechanical equipment guards.

    violationRecord 5021893
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1722(a) · Significant and substantial (S&S)

  15. Roof bolting.

    violationRecord 5021892
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.204(c)(1) · Significant and substantial (S&S)

  16. Mine ventilation plan; submission and approval.

    violationRecord 5021891
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1)

  17. Protection from falls of roof, face and ribs.

    violationRecord 5021890
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · Significant and substantial (S&S)

  18. Permissible electric face equipment; maintenance.

    violationRecord 5028739
    NORTH EAGLE MINE · 4608759

    30 CFR 75.503

  19. Protection from falls of roof, face and ribs.

    violationRecord 5134439
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · Significant and substantial (S&S)

  20. Ventilation controls.

    violationRecord 5134438
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.333(c)(2)

  21. Accumulation of combustible materials.

    violationRecord 5134437
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.400

  22. Permanent splicing of trailing cables.

    violationRecord 5021889
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.604(b) · Significant and substantial (S&S)

  23. Preshift examination at fixed intervals.

    violationRecord 5021888
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.360(g)

  24. Escapeways; bituminous and lignite mines.

    violationRecord 5134436
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.380(d)(4) · Significant and substantial (S&S)

  25. Emergency tethers.

    violationRecord 5134435
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1714-6

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.