Spot Inspections
Itmann No 5 · 4609569103(i) · 4.0 on-site hours reported
Ventilation controls.
Itmann No 5 · 460956930 CFR 75.333(c)(2)
Ventilation controls.
Itmann No 5 · 460956930 CFR 75.333(c)(2)
Ventilation controls.
Itmann No 5 · 460956930 CFR 75.333(e)(1)(ii)
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Itmann No 5 · 460956930 CFR 75.1106-3(a)(2)
Maintenance of belt conveyors and belt conveyor entries.
Itmann No 5 · 460956930 CFR 75.1731(a)
Maintenance of belt conveyors and belt conveyor entries.
Itmann No 5 · 460956930 CFR 75.1731(b)
Water sprinkler systems; fire warning devices at belt drives.
Itmann No 5 · 460956930 CFR 75.1101-10
Water sprinkler systems; fire warning devices at belt drives.
Itmann No 5 · 460956930 CFR 75.1101-10
Mine ventilation plan; submission and approval.
Itmann No 5 · 460956930 CFR 75.370(a)(1)
Ventilation controls.
Itmann No 5 · 460956930 CFR 75.333(e)(1)(ii)
Machinery and equipment; operation and maintenance.
Itmann No 5 · 460956930 CFR 75.1725(a) · Significant and substantial (S&S)
Protection from falls of roof, face and ribs.
Itmann No 5 · 460956930 CFR 75.202(a)
Other safeguards.
Itmann No 5 · 460956930 CFR 75.1403
Examination and maintenance of firefighting equipment.
Itmann No 5 · 460956930 CFR 77.1110
Escapeways; bituminous and lignite mines.
Itmann No 5 · 460956930 CFR 75.380(d)(7)(vii)(B)
Communications facilities; refuge alternatives.
Itmann No 5 · 460956930 CFR 75.1600-3(a)(1)
Spot Inspections
Itmann No 5 · 4609569103(i) · 5.0 on-site hours reported
Permanent splicing of trailing cables.
Itmann No 5 · 460956930 CFR 75.604(b) · Significant and substantial (S&S)
Approval of other fire suppression devices.
Itmann No 5 · 460956930 CFR 75.1107-13(g)
Permanent splicing of trailing cables.
Itmann No 5 · 460956930 CFR 75.604(b)
Drill dust control at underground areas of underground mines.
Itmann No 5 · 460956930 CFR 72.630(b)
Permanent splicing of trailing cables.
Itmann No 5 · 460956930 CFR 75.604(b)
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400
Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers.
Itmann No 5 · 460956930 CFR 75.900 · Significant and substantial (S&S)
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.