Itmann No 5 · 460956930 CFR 75.1202-1(b)(3) · $226.00 proposed penalty
On-shift examination.
Itmann No 5 · 460956930 CFR 75.362(a)(2) · $755.00 proposed penalty
Electric equipment other than power-connection points; outby the last open crosscut; return air; permissibility requirements.
Itmann No 5 · 460956930 CFR 75.507-1(a) · $755.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Itmann No 5 · 460956930 CFR 75.512 · $1,126.00 proposed penalty
Permissible electric face equipment; maintenance.
Itmann No 5 · 460956930 CFR 75.503 · $432.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 8.3 on-site hours reported
Permanent splicing of trailing cables.
Itmann No 5 · 460956930 CFR 75.604(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Protection from falls of roof, face and ribs.
Itmann No 5 · 460956930 CFR 75.202(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $226.00 proposed penalty
Mechanical equipment guards.
Itmann No 5 · 460956930 CFR 75.1722(a) · $336.00 proposed penalty
Verbal Hazard Complaint Inspections
Itmann No 5 · 460956912.5 on-site hours reported
Spot Inspections
Itmann No 5 · 4609569103(i) · 7.5 on-site hours reported
Communications facilities; refuge alternatives.
Itmann No 5 · 460956930 CFR 75.1600-3(a)(1) · $151.00 proposed penalty
Permanent splicing of trailing cables.
Itmann No 5 · 460956930 CFR 75.604(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Mine ventilation plan; submission and approval.
Itmann No 5 · 460956930 CFR 75.370(a)(1) · $193.00 proposed penalty
Ventilation controls.
Itmann No 5 · 460956930 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty
Spot Inspections
Itmann No 5 · 4609569103(i) · 5.5 on-site hours reported
Spot Inspections
Itmann No 5 · 4609569103(i) · 4.0 on-site hours reported
Mine ventilation plan; submission and approval.
Itmann No 5 · 460956930 CFR 75.370(a)(1) · $209.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
Itmann No 5 · 460956912.0 on-site hours reported
Preshift examination at fixed intervals.
Itmann No 5 · 460956930 CFR 75.360(g) · $151.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
Itmann No 5 · 460956930 CFR 75.400 · $165.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
Itmann No 5 · 460956930 CFR 50.20(a) · $165.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.