  1. Spot Inspections

    inspectionRecord 6320145
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 6.5 on-site hours reported

  2. Spot Inspection

    inspectionRecord 6322195
    Beckley Pocahontas Plant · 4609216

    8.0 on-site hours reported

  3. Methane monitors.

    violationRecord 9847573
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.342(a)(4) · $226.00 proposed penalty

  4. Methane monitors.

    violationRecord 5021036
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.342(a)(4) · $245.00 proposed penalty

  5. Drill dust control at underground areas of underground mines.

    violationRecord 5021035
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 72.630(b) · $549.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5020048
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $267.00 proposed penalty

  7. Permissible electric face equipment; maintenance.

    violationRecord 5020047
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.503 · $592.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 5020046
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.503 · $642.00 proposed penalty

  9. Power wires and cables; insulation and protection.

    violationRecord 5021034
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  10. Permanent splicing of trailing cables.

    violationRecord 5021033
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.604(b) · $2,312.00 proposed penalty

  11. Permissible electric face equipment; maintenance.

    violationRecord 5021032
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.503 · $592.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5020045
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.503 · $592.00 proposed penalty

  13. Electric equipment; examination, testing and maintenance.

    violationRecord 5020044
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $193.00 proposed penalty

  14. Ventilation controls.

    violationRecord 5020043
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  15. Accumulations of combustible materials.

    violationRecord 5021031
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 77.1104 · $432.00 proposed penalty

  16. Travelways at surface installations.

    violationRecord 5021030
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 77.205(b) · $288.00 proposed penalty

  17. Water requirements.

    violationRecord 5021029
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1101-3 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  18. Spot Inspections

    inspectionRecord 6321891
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 4.5 on-site hours reported

  19. Non-Injury Accident Investigation

    inspectionRecord 6323033
    BECKLEY POCAHONTAS MINE · 4605252

    18.5 on-site hours reported

  20. Violation — cited standard not reported

    violationRecord 5020042
    BECKLEY POCAHONTAS MINE · 4605252
  21. Machinery and equipment; operation and maintenance.

    violationRecord 5021028
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1725(a) · $209.00 proposed penalty

  22. Drill dust control at underground areas of underground mines.

    violationRecord 5021027
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 72.630(b) · $549.00 proposed penalty

  23. Spot Inspections

    inspectionRecord F009585
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 8.5 on-site hours reported

  24. On-shift examination.

    violationRecord 5022022
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.362(a)(2) · $151.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 5022021
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.