ICG BECKLEY LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Permanent splicing of trailing cables.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.604(b) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 6.5 on-site hours reported
Spot Inspection
BECKLEY POCAHONTAS MINE · 46052527.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.512 · $432.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 6.0 on-site hours reported
Power wires and cables; insulation and protection.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.512 · $267.00 proposed penalty
Other safeguards.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1403 · $313.00 proposed penalty
Emergency tethers.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1714-6 · $959.00 proposed penalty
Quantity and location of firefighting equipment.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1100-2(d) · $288.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 16.5 on-site hours reported
Atmospheric monitoring systems.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.351(e)(1)(ii) · $504.00 proposed penalty
Ventilation controls.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.333(d)(3) · $504.00 proposed penalty
Belt air course ventilation.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.350(a)(2) · $1,126.00 proposed penalty
Belt air course ventilation.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.350(a)(2) · $1,126.00 proposed penalty
Mine ventilation plan; submission and approval.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.370(a)(1) · $592.00 proposed penalty
Power wires and cables; insulation and protection.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.517 · $1,431.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.518 · $193.00 proposed penalty
Accumulation of combustible materials.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.400 · $592.00 proposed penalty
Emergency tethers.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1714-6 · $465.00 proposed penalty
Quantity and location of firefighting equipment.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1100-2(i) · $465.00 proposed penalty
Communications facilities; refuge alternatives.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1600-3(a)(1) · $209.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 8.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.512 · $193.00 proposed penalty
Other safeguards.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1403 · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.