ICG BECKLEY LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof control plan.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.220(a)(1) · $245.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 5.0 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 5.0 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 4.5 on-site hours reported
Regular Safety and Health Inspection
Beckley Pocahontas Plant · 460921649.3 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 6.3 on-site hours reported
Automatic fire sensors and manual actuators; installation; minimum requirements.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1107-4(c) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.517 · $642.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 7.0 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 6.0 on-site hours reported
Striking or bumping
BECKLEY POCAHONTAS MINE · 4605252No dys awy frm wrk,no rstr act
Accident narrative
On January 29th, 2026, Mine management personnel received info about an injury that happened on December 3rd, 2025. Employee received a laceration behind EE's right ear from a roof bolt that required 3 stitches. The employee did not notify mine management of the incident, went home and went to the clinic on EE's own without notifying mine management of the injury.
Escapeways; bituminous and lignite mines.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.380(d)(7)(vi) · $432.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 6.3 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 7.8 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 6.0 on-site hours reported
Accumulation of combustible materials.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.400 · $883.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 7.0 on-site hours reported
Permanent splicing of trailing cables.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.604(b) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.202(a) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.370(a)(1) · $883.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 6.5 on-site hours reported
Electric equipment; examination, testing and maintenance.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.512 · $288.00 proposed penalty
Non-Injury Accident Investigation
BECKLEY POCAHONTAS MINE · 460525222.0 on-site hours reported
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 13.5 on-site hours reported
Methane monitors.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.342(a)(4) · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.