← ICG BECKLEY LLC

ICG BECKLEY LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5027868
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5027867
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5027866
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  4. Rock dusting.

    violationRecord 5027865
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.402 · $226.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5095184
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · Significant and substantial (S&S) · $697.00 proposed penalty

  6. On-shift examination.

    violationRecord 5095183
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.362(d)(1)(iii) · $818.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5095182
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $177.00 proposed penalty

  8. Other safeguards.

    violationRecord 5027864
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1403 · $151.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5027863
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $592.00 proposed penalty

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 5027862
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $336.00 proposed penalty

  11. Other safeguards.

    violationRecord 5027861
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1403 · $226.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5027860
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1731(a) · $151.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F00D153
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 8.0 on-site hours reported

  14. Permissible electric face equipment; maintenance.

    violationRecord 5029795
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.503 · $151.00 proposed penalty

  15. Methane monitors.

    violationRecord 5029794
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  16. Machinery

    accidentRecord 220261380007
    BECKLEY POCAHONTAS MINE · 4605252

    Days away from work only

    Accident narrative

    Employee stated that as EE was installing a rib bolt EE felt a sharp pain in EE's middle / left lower back.

  17. Verbal Hazard Complaint Inspections

    inspectionRecord F021038
    BECKLEY POCAHONTAS MINE · 4605252

    32.5 on-site hours reported

  18. Verbal Hazard Complaint Inspections

    inspectionRecord F02B62A
    BECKLEY POCAHONTAS MINE · 4605252

    6.0 on-site hours reported

  19. Accumulation of combustible materials.

    violationRecord 5095179
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $549.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5095178
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $245.00 proposed penalty

  21. Roof control plan.

    violationRecord 5095177
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 5095176
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  23. Permanent splicing of trailing cables.

    violationRecord 5095175
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5095174
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5092945
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.