ICG BECKLEY LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Power wires and cables; insulation and protection.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.517 · $151.00 proposed penalty
Slip or fall of person
BECKLEY POCAHONTAS MINE · 4605252Days away from work only
Accident narrative
While operating underground, the ride became stuck in mud. The employee attempted to free the equipment when EE's foot became trapped in the mud as well. While trying to pull EE's foot loose, EE twisted EE's right leg and felt a pop in EE's knee. Employee did not seek medical evaluation until 6/4/2026. Missed June 8th due to injury.
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 6.0 on-site hours reported
Roof control plan.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.220(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.400 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Escapeways; bituminous and lignite mines.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.380(d)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Atmospheric monitoring systems.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.351(c)(4) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Permanent splicing of trailing cables.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.604(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Maintenance of incombustible content of rock dust.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.403 · $209.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 6.0 on-site hours reported
Protection from falls of roof, face and ribs.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.202(a) · $313.00 proposed penalty
Maintenance of incombustible content of rock dust.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.403 · $549.00 proposed penalty
Accumulation of combustible materials.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.400 · $366.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 9.0 on-site hours reported
Accumulation of combustible materials.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.400 · $2,133.00 proposed penalty
Drill dust control at underground areas of underground mines.
BECKLEY POCAHONTAS MINE · 460525230 CFR 72.630(b) · $165.00 proposed penalty
Inspection of fire suppression devices.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.1107-16(b) · $366.00 proposed penalty
Roof control plan.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.220(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.512 · $366.00 proposed penalty
Protection from falls of roof, face and ribs.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.202(a) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.403 · $549.00 proposed penalty
Mine ventilation plan; submission and approval.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.370(a)(1) · $226.00 proposed penalty
Ventilation controls.
BECKLEY POCAHONTAS MINE · 460525230 CFR 75.333(h) · $245.00 proposed penalty
Spot Inspections
BECKLEY POCAHONTAS MINE · 4605252103(i) · 8.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.