← ICG BECKLEY LLC

ICG BECKLEY LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Power wires and cables; insulation and protection.

    violationRecord 5029799
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.517 · $151.00 proposed penalty

  2. Slip or fall of person

    accidentRecord 220261730006
    BECKLEY POCAHONTAS MINE · 4605252

    Days away from work only

    Accident narrative

    While operating underground, the ride became stuck in mud. The employee attempted to free the equipment when EE's foot became trapped in the mud as well. While trying to pull EE's foot loose, EE twisted EE's right leg and felt a pop in EE's knee. Employee did not seek medical evaluation until 6/4/2026. Missed June 8th due to injury.

  3. Spot Inspections

    inspectionRecord 6322746
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 6.0 on-site hours reported

  4. Roof control plan.

    violationRecord 5022690
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5022689
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5022688
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  7. Atmospheric monitoring systems.

    violationRecord 5022687
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.351(c)(4) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  8. Permanent splicing of trailing cables.

    violationRecord 5022686
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  9. Maintenance of incombustible content of rock dust.

    violationRecord 5022685
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.403 · $209.00 proposed penalty

  10. Spot Inspections

    inspectionRecord 6322745
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 6.0 on-site hours reported

  11. Protection from falls of roof, face and ribs.

    violationRecord 9849745
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · $313.00 proposed penalty

  12. Maintenance of incombustible content of rock dust.

    violationRecord 9849744
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.403 · $549.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5022684
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $366.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5022683
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $366.00 proposed penalty

  15. Spot Inspections

    inspectionRecord 6322744
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 9.0 on-site hours reported

  16. Accumulation of combustible materials.

    violationRecord 9849743
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.400 · $2,133.00 proposed penalty

  17. Drill dust control at underground areas of underground mines.

    violationRecord 5027878
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 72.630(b) · $165.00 proposed penalty

  18. Inspection of fire suppression devices.

    violationRecord 5027877
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.1107-16(b) · $366.00 proposed penalty

  19. Roof control plan.

    violationRecord 5027876
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  20. Electric equipment; examination, testing and maintenance.

    violationRecord 5027875
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.512 · $366.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 5022682
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.202(a) · $151.00 proposed penalty

  22. Maintenance of incombustible content of rock dust.

    violationRecord 5022681
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.403 · $549.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5022680
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  24. Ventilation controls.

    violationRecord 5022679
    BECKLEY POCAHONTAS MINE · 4605252

    30 CFR 75.333(h) · $245.00 proposed penalty

  25. Spot Inspections

    inspectionRecord 6322743
    BECKLEY POCAHONTAS MINE · 4605252

    103(i) · 8.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.