ACTIVE / OPERATOR PORTFOLIO

Hostetler Quarry LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0056458

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Hostetler Quarry LLC2302255 · Active6/8 quarters reportedDallas, MOSurface · MSHA: Crushed, Broken Limestone NEC013,33317043.0

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

17

1 significant & substantial (S&S)

  1. 2025 Q17
  2. 2025 Q20
  3. 2025 Q34
  4. 2025 Q40
  5. 2026 Q13
  6. 2026 Q20
  7. 2026 Q33
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

8,299.00

17 of 17 violations with amounts

  1. 2025 Q11,173
  2. 2025 Q2—
  3. 2025 Q31,538
  4. 2025 Q4—
  5. 2026 Q12,310
  6. 2026 Q2—
  7. 2026 Q33,278
  8. 2026 Q4 *—

On-site inspection hours

43.00

5 inspections · 5 with hours

  1. 2025 Q18.50
  2. 2025 Q2—
  3. 2025 Q317.00
  4. 2025 Q4—
  5. 2026 Q17.25
  6. 2026 Q2—
  7. 2026 Q310.25
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1701,173.000028.5
2025-Q200—000—
2025-Q3401,538.0000117.0
2025-Q400—000—
2026-Q1302,310.000017.3
2026-Q200—000—
2026-Q3313,278.0000110.3
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5220327
    Hostetler Quarry LLC · 2302255

    56.23002(a) · $165.00 proposed

  2. violation5220326
    Hostetler Quarry LLC · 2302255

    56.9300(a) · S&S · $2,936.00 proposed

  3. violation5220325
    Hostetler Quarry LLC · 2302255

    56.16005 · $177.00 proposed

  4. inspectionF034CC7
    Hostetler Quarry LLC · 2302255

    Regular Safety and Health Inspection · 10.3 on-site hours

  5. inspectionF034CA9
    Hostetler Quarry LLC · 2302255

    Regular Safety and Health Inspection · 7.3 on-site hours

  6. violation5220218
    Hostetler Quarry LLC · 2302255

    50.30(a) · $165.00 proposed

  7. violation5220217
    Hostetler Quarry LLC · 2302255

    56.14107(a) · $1,968.00 proposed

  8. violation5220216
    Hostetler Quarry LLC · 2302255

    56.12004 · $177.00 proposed

  9. inspectionF01D666
    Hostetler Quarry LLC · 2302255

    Regular Safety and Health Inspection · 17.0 on-site hours

  10. violation5040483
    Hostetler Quarry LLC · 2302255

    56.14107(a) · $592.00 proposed

  11. violation5040482
    Hostetler Quarry LLC · 2302255

    56.12032 · $592.00 proposed

  12. violation5040481
    Hostetler Quarry LLC · 2302255

    56.12032 · $177.00 proposed

  13. violation5040480
    Hostetler Quarry LLC · 2302255

    56.12013(b) · $177.00 proposed

  14. inspectionF00C64B
    Hostetler Quarry LLC · 2302255

    Compliance Follow-up Inspection · 1.0 on-site hours

  15. inspectionF012718
    Hostetler Quarry LLC · 2302255

    Regular Safety and Health Inspection · 7.5 on-site hours

  16. violation5040418
    Hostetler Quarry LLC · 2302255

    56.12028 · $267.00 proposed

  17. violation5040417
    Hostetler Quarry LLC · 2302255

    50.30(a) · $151.00 proposed

  18. violation5040416
    Hostetler Quarry LLC · 2302255

    50.30(a) · $151.00 proposed

  19. violation5040415
    Hostetler Quarry LLC · 2302255

    56.12018 · $151.00 proposed

  20. violation5040414
    Hostetler Quarry LLC · 2302255

    56.12032 · $151.00 proposed

  21. violation5040413
    Hostetler Quarry LLC · 2302255

    56.14100(b) · $151.00 proposed

  22. violation5040412
    Hostetler Quarry LLC · 2302255

    56.14100(b) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.