ACTIVE / OPERATOR PORTFOLIO

Hommel Concrete Company

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0100967

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-17. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Clear Creek Quarry4003610 · ActiveCocke, TNSurface · MSHA: Crushed, Broken Stone NEC——20068.5
Hommel Concrete Co. Quarry4003352 · ActiveCocke, TNSurface · MSHA: Crushed, Broken Limestone NEC——10069.5

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-17Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

30

13 significant & substantial (S&S)

  1. 2025 Q112
  2. 2025 Q29
  3. 2025 Q32
  4. 2025 Q43
  5. 2026 Q10
  6. 2026 Q22
  7. 2026 Q32
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

28,489.00

28 of 30 violations with amounts

  1. 2025 Q16,388
  2. 2025 Q220,194
  3. 2025 Q3344
  4. 2025 Q41,261
  5. 2026 Q1—
  6. 2026 Q2302
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

138.00

14 inspections · 14 with hours

  1. 2025 Q122.75
  2. 2025 Q226.00
  3. 2025 Q320.50
  4. 2025 Q429.00
  5. 2026 Q15.00
  6. 2026 Q225.75
  7. 2026 Q39.00
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11276,388.0000222.8
2025-Q29520,194.0000226.0
2025-Q320344.0000120.5
2025-Q4311,261.0000329.0
2026-Q100—0015.0
2026-Q220302.0000325.8
2026-Q320—0029.0
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF03E22A
    Clear Creek Quarry · 4003610

    Compliance Follow-up Inspection · 0.5 on-site hours

  2. inspectionF026705
    Hommel Concrete Co. Quarry · 4003352

    Spot Inspection · 8.5 on-site hours

  3. violation5080630
    Hommel Concrete Co. Quarry · 4003352

    56.12002

  4. violation5080629
    Hommel Concrete Co. Quarry · 4003352

    56.12008

  5. violation5087455
    Hommel Concrete Co. Quarry · 4003352

    56.12018 · $151.00 proposed

  6. inspectionF02344F
    Hommel Concrete Co. Quarry · 4003352

    Regular Safety and Health Inspection · 8.8 on-site hours

  7. violation5087453
    Clear Creek Quarry · 4003610

    46.9(g) · $151.00 proposed

  8. inspectionF02344E
    Clear Creek Quarry · 4003610

    Regular Safety and Health Inspection · 14.5 on-site hours

  9. inspectionF023450
    Hommel Concrete Co. Quarry · 4003352

    Spot Inspection · 2.5 on-site hours

  10. inspectionF007857
    Hommel Concrete Co. Quarry · 4003352

    Verbal Hazard Complaint Inspections · 5.0 on-site hours

  11. violation5087423
    Hommel Concrete Co. Quarry · 4003352

    56.12008 · $151.00 proposed

  12. inspectionF007851
    Clear Creek Quarry · 4003610

    Spot Inspection · 3.0 on-site hours

  13. violation5087421
    Hommel Concrete Co. Quarry · 4003352

    56.14132(a) · $151.00 proposed

  14. inspectionF012883
    Hommel Concrete Co. Quarry · 4003352

    Regular Safety and Health Inspection · 10.5 on-site hours

  15. inspectionF020DF3
    Clear Creek Quarry · 4003610

    Regular Safety and Health Inspection · 15.5 on-site hours

  16. violation5087711
    Clear Creek Quarry · 4003610

    56.9301 · S&S · $959.00 proposed

  17. violation9775759
    Hommel Concrete Co. Quarry · 4003352

    56.14100(b) · $193.00 proposed

  18. violation9775758
    Hommel Concrete Co. Quarry · 4003352

    56.14100(b) · $151.00 proposed

  19. inspectionF00CD4A
    Hommel Concrete Co. Quarry · 4003352

    Regular Safety and Health Inspection · 20.5 on-site hours

  20. inspectionF00783F
    Hommel Concrete Co. Quarry · 4003352

    Spot Inspection · 4.0 on-site hours

  21. inspectionF01287A
    Clear Creek Quarry · 4003610

    Regular Safety and Health Inspection · 22.0 on-site hours

  22. violation9776860
    Clear Creek Quarry · 4003610

    56.9300(a) · S&S · $1,431.00 proposed

  23. violation9776859
    Clear Creek Quarry · 4003610

    56.9300(b) · $288.00 proposed

  24. violation9776858
    Clear Creek Quarry · 4003610

    56.14100(a) · S&S · $959.00 proposed

  25. violation9776857
    Clear Creek Quarry · 4003610

    56.14100(b) · $193.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-17.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.