ALL STATUSES / OPERATOR PORTFOLIO

HILLTOWN SAND & GRAVEL

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0166533

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
HILLTOWN SAND AND GRAVEL LLC1900302 · Intermittent6/8 quarters reportedHampshire, MASurface · MSHA: Construction Sand and Gravel06,60419040.8
Montgomery Sand & Gravel1901141 · AbandonedHampden, MASurface · MSHA: Construction Sand and Gravel——00—

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

19

1 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q216
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q22
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

5,828.00

19 of 19 violations with amounts

  1. 2025 Q1—
  2. 2025 Q22,416
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1151
  6. 2026 Q23,261
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

40.75

4 inspections · 4 with hours

  1. 2025 Q1—
  2. 2025 Q223.00
  3. 2025 Q31.25
  4. 2025 Q4—
  5. 2026 Q17.00
  6. 2026 Q29.50
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q21602,416.0000123.0
2025-Q300—0011.3
2025-Q400—000—
2026-Q110151.000017.0
2026-Q2213,261.000019.5
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5025959
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.14100(c) · S&S · $2,712.00 proposed

  2. violation5025958
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.12032 · $549.00 proposed

  3. inspectionF01E5FC
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    Regular Safety and Health Inspection · 9.5 on-site hours

  4. inspectionF03E3D5
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    Regular Safety and Health Inspection · 7.0 on-site hours

  5. violation5075382
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.12025 · $151.00 proposed

  6. inspectionF0109DE
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    Compliance Follow-up Inspection · 1.3 on-site hours

  7. violation5072945
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.14100(a) · $151.00 proposed

  8. violation5072944
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.14100(b) · $151.00 proposed

  9. violation5072943
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.12032 · $151.00 proposed

  10. violation5072942
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.12032 · $151.00 proposed

  11. violation5072941
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.12025 · $151.00 proposed

  12. violation5072940
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.18002(b) · $151.00 proposed

  13. violation5072939
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.11003 · $151.00 proposed

  14. violation5072938
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.12008 · $151.00 proposed

  15. violation5072937
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.14107(a) · $151.00 proposed

  16. violation5072936
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.11001 · $151.00 proposed

  17. violation5072935
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.12002 · $151.00 proposed

  18. violation5072934
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.11001 · $151.00 proposed

  19. inspectionF014FA4
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    Regular Safety and Health Inspection · 23.0 on-site hours

  20. violation5072933
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.12018 · $151.00 proposed

  21. violation5072932
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.14205 · $151.00 proposed

  22. violation5072931
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.4101 · $151.00 proposed

  23. violation5072930
    HILLTOWN SAND AND GRAVEL LLC · 1900302

    56.4104(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.