Coal production
0reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| EVANSVILLE PLANT3600185 · Active6/8 quarters reported | Berks, PAFacility · MSHA: Cement | 0 | 413,658 | 51 | 11 | 212.0 |
| Leeds Plant0100043 · Active6/8 quarters reported | Jefferson, ALFacility · MSHA: Cement | 0 | 381,013 | 70 | 3 | 225.8 |
| Logansport Cement Plant1200065 · Active6/8 quarters reported | Cass, INFacility · MSHA: Cement | 0 | 324,803 | 57 | 5 | 236.5 |
| Mason City Plant1300095 · Active6/8 quarters reported | Cerro Gordo, IAFacility · MSHA: Cement | 0 | 439,649 | 267 | 7 | 486.5 |
| Mitchell Plant1200063 · Active6/8 quarters reported | Lawrence, INSurface · MSHA: Cement | 0 | 599,503 | 41 | 7 | 362.8 |
| Nazareth Plant I3600190 · Active6/8 quarters reported | Northampton, PAFacility · MSHA: Cement | 0 | 542,391 | 180 | 9 | 534.0 |
| UNION BRIDGE MD1800017 · Active6/8 quarters reported | Carroll, MDFacility · MSHA: Cement | 0 | 518,335 | 86 | 8 | 324.3 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
7 of 7 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 7 mines listed under this operator were checked; 7 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 570,683 | 0.00 | 956 | 7/7 mines reporting |
| 2025 Q2 | 0 | 526,339 | 0.00 | 952 | 7/7 mines reporting |
| 2025 Q3 | 0 | 528,070 | 0.00 | 946 | 7/7 mines reporting |
| 2025 Q4 | 0 | 505,883 | 0.00 | 940 | 7/7 mines reporting |
| 2026 Q1 | 0 | 545,447 | 0.00 | 940 | 7/7 mines reporting |
| 2026 Q2 | 0 | 542,930 | 0.00 | 954 | 7/7 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
165 significant & substantial (S&S)
0 records classified as fatality
735 of 752 violations with amounts
107 inspections · 107 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 91 | 16 | 156,964.00 | 12 | 0 | 11 | 215.5 |
| 2025-Q2 | 128 | 18 | 258,728.00 | 4 | 0 | 10 | 461.8 |
| 2025-Q3 | 39 | 10 | 25,556.00 | 3 | 0 | 11 | 145.3 |
| 2025-Q4 | 47 | 10 | 95,419.00 | 6 | 0 | 10 | 232.3 |
| 2026-Q1 | 188 | 49 | 417,884.00 | 8 | 0 | 21 | 512.5 |
| 2026-Q2 | 50 | 13 | 214,374.00 | 8 | 0 | 18 | 280.8 |
| 2026-Q3 | 200 | 48 | 538,119.00 | 9 | 0 | 25 | 518.8 |
| 2026-Q4 * | 9 | 1 | — | 0 | 0 | 1 | 15.0 |
All violations issued in the selected period. Counts combine subsections.
56.14100(b) · $267.00 proposed
56.19057 · $151.00 proposed
56.16009 · S&S · $4,383.00 proposed
56.14130(g) · $151.00 proposed
56.12028 · $209.00 proposed
56.14207 · $209.00 proposed
56.14207 · $209.00 proposed
56.14207 · $151.00 proposed
56.14100(c) · $313.00 proposed
56.14112(b) · $313.00 proposed
56.12004 · $697.00 proposed
56.20003(a) · $209.00 proposed
POWERED HAULAGE · DAYS RESTRICTED ACTIVITY ONLY
An employee was a passenger inside of a fellow employee's personal vehicle that was involved in an incident on the quarry road headed to return to work from their break. Employee initially declined medical treatment but, on the 12th, requested to been seen by medical professionals. Employee was diagnosed with a mild concussion and was given restrictions.
Regular Safety and Health Inspection · 38.0 on-site hours
Verbal Hazard Complaint Inspections · 9.0 on-site hours
Verbal Hazard Complaint Inspections · 5.5 on-site hours
56.9315 · $465.00 proposed
Verbal Hazard Complaint Inspections · 5.8 on-site hours
SLIP OR FALL OF PERSON · DAYS RESTRICTED ACTIVITY ONLY
Loader operator drove to Central Control for a pre-shift safety meeting. While exiting the payloader, the operator missed stepped on the last rung and fell backward, landing on the left hip.
Verbal Hazard Complaint Inspections · 1.5 on-site hours
MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was using an air lance with 90 psi air to clear a chute plug in the #4 Finish Mill feed chute. The employee lost grip causing the air lance to hit them in the mouth. They initially declined medical attention. On 10/24/2025, they requested to be seen at the emergency room due to mouth pain.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was installing a blank in the meal pipe. While pushing blank in and didn't realize a finger was in the bolt hole. When blank finally went in it cut tip of right ring finger.
SLIP OR FALL OF PERSON · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was working on the long reclaimer. Employee went to reposition and while doing so slipped and left butt cheek landed on the point of a metal plate. This caused a 2cm puncture to butt cheek. This didn't become a medical until they went to wound care and they started packing the wound. This started on Oct 29th
Regular Safety and Health Inspection · 77.3 on-site hours
103 (g) Written Notification Hazard Complaint Inspectio · 2.3 on-site hours
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.