ALL STATUSES / OPERATOR PORTFOLIO

Graymont Western US Inc

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDL11495

MINE PORTFOLIO

4 of 4 mines and facilities

2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Cricket Mountain Plant & Quarry4201647 · Active6/8 quarters reportedMillard, UTSurface · MSHA: Lime0281,294653264.0
Indian Creek Lime Plant & Quarry2401652 · Active6/8 quarters reportedBroadwater, MTSurface · MSHA: Lime0117,020123104.0
Pilot Peak2601906 · Active6/8 quarters reportedElko, NVSurface · MSHA: Lime0233,496353128.3
Tacoma Plant4503290 · Active6/8 quarters reportedPierce, WAFacility · MSHA: Lime025,7935143.3

LOCATION

Portfolio map

4 of 4 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

117

17 significant & substantial (S&S)

  1. 2025 Q18
  2. 2025 Q212
  3. 2025 Q327
  4. 2025 Q47
  5. 2026 Q131
  6. 2026 Q211
  7. 2026 Q321
  8. 2026 Q4 *0

Accident records

10

0 records classified as fatality

  1. 2025 Q13
  2. 2025 Q21
  3. 2025 Q31
  4. 2025 Q43
  5. 2026 Q11
  6. 2026 Q21
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

83,929.00

116 of 117 violations with amounts

  1. 2025 Q11,853
  2. 2025 Q22,272
  3. 2025 Q315,855
  4. 2025 Q41,083
  5. 2026 Q152,729
  6. 2026 Q21,860
  7. 2026 Q38,277
  8. 2026 Q4 *—

On-site inspection hours

539.50

25 inspections · 25 with hours

  1. 2025 Q152.00
  2. 2025 Q279.00
  3. 2025 Q3104.50
  4. 2025 Q437.50
  5. 2026 Q1118.50
  6. 2026 Q256.50
  7. 2026 Q391.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1821,853.0030652.0
2025-Q21222,272.0010479.0
2025-Q327615,855.00103104.5
2025-Q4711,083.0030237.5
2026-Q131352,729.00104118.5
2026-Q21111,860.0010456.5
2026-Q32128,277.0000291.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5055623
    Cricket Mountain Plant & Quarry · 4201647

    56.12032 · $313.00 proposed

  2. violation5109224
    Pilot Peak · 2601906

    56.5001(a)/.5005 · $267.00 proposed

  3. violation5109214
    Pilot Peak · 2601906

    62.130(c) · S&S · $592.00 proposed

  4. inspectionF02B6F4
    Pilot Peak · 2601906

    Spot Inspection · 22.5 on-site hours

  5. violation5055618
    Cricket Mountain Plant & Quarry · 4201647

    56.12032 · $398.00 proposed

  6. violation5055617
    Cricket Mountain Plant & Quarry · 4201647

    56.12032 · $267.00 proposed

  7. violation5055616
    Cricket Mountain Plant & Quarry · 4201647

    56.14107(a) · $883.00 proposed

  8. violation5053046
    Cricket Mountain Plant & Quarry · 4201647

    47.41(a) · $267.00 proposed

  9. violation5053045
    Cricket Mountain Plant & Quarry · 4201647

    56.14100(b) · $883.00 proposed

  10. violation5053044
    Cricket Mountain Plant & Quarry · 4201647

    56.14132(a) · $883.00 proposed

  11. inspectionF036D34
    Cricket Mountain Plant & Quarry · 4201647

    Regular Safety and Health Inspection · 71.3 on-site hours

  12. violation5109213
    Pilot Peak · 2601906

    56.15006 · S&S · $20,047.00 proposed

  13. violation5109212
    Pilot Peak · 2601906

    46.7(a) · $151.00 proposed

  14. violation5109211
    Pilot Peak · 2601906

    50.12 · $151.00 proposed

  15. violation5109210
    Pilot Peak · 2601906

    56.12018 · $697.00 proposed

  16. violation5109209
    Pilot Peak · 2601906

    56.4102 · $209.00 proposed

  17. inspectionF02B6F3
    Pilot Peak · 2601906

    Non-Fatal Accident Investigation · 7.8 on-site hours

  18. inspectionF02B6F2
    Pilot Peak · 2601906

    Regular Safety and Health Inspection · 17.0 on-site hours

  19. violation5109203
    Pilot Peak · 2601906

    50.10(b) · $7,555.00 proposed

  20. violation5109208
    Pilot Peak · 2601906

    56.14112(b) · $151.00 proposed

  21. violation5109207
    Pilot Peak · 2601906

    56.15005 · S&S · $13,782.00 proposed

  22. violation5109206
    Pilot Peak · 2601906

    Description not reported

  23. violation5109205
    Pilot Peak · 2601906

    56.15001 · $336.00 proposed

  24. violation5109204
    Pilot Peak · 2601906

    56.4104(a) · $336.00 proposed

  25. accident220260150017
    Pilot Peak · 2601906

    MACHINERY · DYS AWY FRM WRK & RESTRCTD ACT

    Accident narrative

    Employee went to put a flame in kiln 1, EE was standing on a 29" rolling ladder, there was pulverized coal dust still in the hood of the kiln, when they introduced a flare to ignite the coal, the kiln produced a blowback, knocked the employee to the ground from the 29" ladder and they sustained burn injuries to right arm and lower back, 2nd degree burns.

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.