← Gibson County Coal, LLC

Gibson County Coal, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord 7037839
    Gibson South · 1202388

    103(i) · 6.5 on-site hours reported

  2. Accumulation of combustible materials.

    violationRecord 9780821
    Gibson South · 1202388

    30 CFR 75.400 · $193.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F0161D4
    Gibson South · 1202388

    103(i) · 7.5 on-site hours reported

  4. Methane monitors.

    violationRecord 9780820
    Gibson South · 1202388

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  5. Handtools (nonpowered)

    accidentRecord 220252460005
    Gibson South · 1202388

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was cutting a piece of scrape belt to make DTI pads when the blade slipped contacting the employees left forearm resulting in a laceration. (1) lace suture was required to close the wound.

  6. Mine ventilation plan; submission and approval.

    violationRecord 9780819
    Gibson South · 1202388

    30 CFR 75.370(a)(1) · $165.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F0161D3
    Gibson South · 1202388

    103(i) · 7.0 on-site hours reported

  8. Slip or fall of person

    accidentRecord 220252400033
    Gibson South · 1202388

    Days away from work only

    Accident narrative

    Employee was loading a shuttle car in the first turn of 7 right. They went to take a step back and lost footing and fell backwards striking their head, neck and upper back against the shuttle car resulting in an acute fracture of the T6 vertebrae. Employee is expected to make a full recovery without surgery being required. They started missing work on 08/27/2025.

  9. Accumulation of combustible materials.

    violationRecord 9780818
    Gibson South · 1202388

    30 CFR 75.400 · $193.00 proposed penalty

  10. Spot Inspections

    inspectionRecord F0161D2
    Gibson South · 1202388

    103(i) · 8.0 on-site hours reported

  11. Mine ventilation plan; submission and approval.

    violationRecord 9780817
    Gibson South · 1202388

    30 CFR 75.370(a)(1) · $177.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9780245
    Gibson South · 1202388

    30 CFR 75.400 · $177.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 9780921
    Gibson South · 1202388

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  14. Roof control plan.

    violationRecord 9780816
    Gibson South · 1202388

    30 CFR 75.220(a)(1) · $165.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F0161D1
    Gibson South · 1202388

    103(i) · 7.0 on-site hours reported

  16. Permissible electric face equipment; maintenance.

    violationRecord 9780920
    Gibson South · 1202388

    30 CFR 75.503 · Significant and substantial (S&S) · $818.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 9780919
    Gibson South · 1202388

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  18. Machinery

    accidentRecord 220252310005
    Gibson South · 1202388

    No dys awy frm wrk,no rstr act

    Accident narrative

    While handing an angle grinder to EE's supervisor, EE inadvertently contacted the rotating grinding wheel with EE's left hand resulting in a laceration. (8) sutures were required to close the wound.

  19. Spot Inspections

    inspectionRecord F0161D0
    Gibson South · 1202388

    103(i) · 7.0 on-site hours reported

  20. Methane monitors.

    violationRecord 9780815
    Gibson South · 1202388

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  21. Handling of materials

    accidentRecord 220252310007
    Gibson South · 1202388

    Days away from work only

    Accident narrative

    Employee was picking up a hollow block while building an intake stopping and felt a sharp pain in EE's lower back. EE was placed off work beginning on 08/14/2025 for a lower back strain.

  22. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 9780244
    Gibson South · 1202388

    30 CFR 75.601-1 · $165.00 proposed penalty

  23. Handling of materials

    accidentRecord 220252310004
    Gibson South · 1202388

    Days away from work only

    Accident narrative

    Employee was moving miner cable over in order to hang when EE felt a sharp pain in EE's lower abdomen. EE was later seen by a doctor and diagnosed with a hernia. EE underwent surgery on 8/11/2025 and is expected to make a full recovery.

  24. Spot Inspections

    inspectionRecord 7011012
    Gibson South · 1202388

    103(i) · 7.0 on-site hours reported

  25. Methane monitors.

    violationRecord 9545504
    Gibson South · 1202388

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $883.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.