ACTIVE / OPERATOR PORTFOLIO

GCC Permian

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0148313

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Odessa Cement Plant4100060 · Active6/8 quarters reportedEctor, TXFacility · MSHA: Cement0459,84417312413.5

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

173

14 significant & substantial (S&S)

  1. 2025 Q16
  2. 2025 Q20
  3. 2025 Q357
  4. 2025 Q424
  5. 2026 Q137
  6. 2026 Q20
  7. 2026 Q349
  8. 2026 Q4 *0

Accident records

12

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q24
  3. 2025 Q32
  4. 2025 Q41
  5. 2026 Q11
  6. 2026 Q22
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

33,343.00

169 of 173 violations with amounts

  1. 2025 Q13,359
  2. 2025 Q2—
  3. 2025 Q311,084
  4. 2025 Q44,086
  5. 2026 Q17,358
  6. 2026 Q2—
  7. 2026 Q37,456
  8. 2026 Q4 *—

On-site inspection hours

413.50

11 inspections · 11 with hours

  1. 2025 Q180.75
  2. 2025 Q2—
  3. 2025 Q356.00
  4. 2025 Q4119.75
  5. 2026 Q11.25
  6. 2026 Q2—
  7. 2026 Q3155.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1603,359.0010180.8
2025-Q200—400—
2025-Q357311,084.0020356.0
2025-Q42424,086.00103119.8
2026-Q13757,358.001021.3
2026-Q200—200—
2026-Q34947,456.00102155.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF0458AA
    Odessa Cement Plant · 4100060

    Spot Inspection · 0.0 on-site hours

  2. violation5174115
    Odessa Cement Plant · 4100060

    50.20-1

  3. violation5088819
    Odessa Cement Plant · 4100060

    56.14100(b) · $177.00 proposed

  4. violation5088818
    Odessa Cement Plant · 4100060

    56.4203 · $151.00 proposed

  5. violation5088817
    Odessa Cement Plant · 4100060

    56.14100(b) · $151.00 proposed

  6. violation5088612
    Odessa Cement Plant · 4100060

    56.12032 · $151.00 proposed

  7. violation5088611
    Odessa Cement Plant · 4100060

    56.4101 · $151.00 proposed

  8. violation5088610
    Odessa Cement Plant · 4100060

    56.12006 · $151.00 proposed

  9. violation5088816
    Odessa Cement Plant · 4100060

    56.14100(d) · S&S · $151.00 proposed

  10. violation5088815
    Odessa Cement Plant · 4100060

    56.14100(b) · $151.00 proposed

  11. violation5088814
    Odessa Cement Plant · 4100060

    56.11001 · $151.00 proposed

  12. violation5088813
    Odessa Cement Plant · 4100060

    56.14100(b) · $151.00 proposed

  13. violation5088609
    Odessa Cement Plant · 4100060

    56.12006 · $151.00 proposed

  14. violation5088812
    Odessa Cement Plant · 4100060

    56.4402 · $151.00 proposed

  15. violation5088811
    Odessa Cement Plant · 4100060

    56.4402 · $151.00 proposed

  16. violation5088810
    Odessa Cement Plant · 4100060

    56.11001 · $151.00 proposed

  17. violation5088809
    Odessa Cement Plant · 4100060

    56.12008 · $151.00 proposed

  18. violation5088608
    Odessa Cement Plant · 4100060

    56.12032 · $151.00 proposed

  19. violation5088607
    Odessa Cement Plant · 4100060

    56.12032 · $151.00 proposed

  20. violation5088606
    Odessa Cement Plant · 4100060

    56.4101 · $151.00 proposed

  21. violation5088605
    Odessa Cement Plant · 4100060

    56.12006 · $151.00 proposed

  22. violation5088808
    Odessa Cement Plant · 4100060

    56.12030 · $151.00 proposed

  23. violation5088807
    Odessa Cement Plant · 4100060

    56.12030 · $151.00 proposed

  24. violation5088806
    Odessa Cement Plant · 4100060

    47.41(a)

  25. violation5088805
    Odessa Cement Plant · 4100060

    56.4203 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.