Coal production
0reported short tons
ALL STATUSES / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| GCC Dacotah Inc3900022 · Active6/8 quarters reported | Pennington, SDFacility · MSHA: Cement | 0 | 462,762 | 174 | 13 | 395.8 |
| KONECHNE MINE3901617 · Active6/8 quarters reported | Meade, SDSurface · MSHA: Gypsum | 0 | 3,740 | 1 | 0 | 24.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 2 mines listed under this operator were checked; 2 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 70,633 | 0.00 | 139 | 2/2 mines reporting |
| 2025 Q2 | 0 | 63,027 | 0.00 | 136 | 2/2 mines reporting |
| 2025 Q3 | 0 | 70,695 | 0.00 | 138 | 2/2 mines reporting |
| 2025 Q4 | 0 | 61,505 | 0.00 | 119 | 2/2 mines reporting |
| 2026 Q1 | 0 | 111,088 | 0.00 | 139 | 2/2 mines reporting |
| 2026 Q2 | 0 | 89,554 | 0.00 | 131 | 2/2 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
33 significant & substantial (S&S)
1 records classified as fatality
174 of 175 violations with amounts
11 inspections · 11 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 14 | 1 | 11,898.00 | 1 | 1 | 2 | 85.0 |
| 2025-Q2 | 69 | 11 | 103,184.00 | 2 | 0 | 1 | 130.0 |
| 2025-Q3 | 11 | 7 | 271,280.00 | 0 | 0 | 2 | 8.3 |
| 2025-Q4 | 0 | 0 | — | 6 | 0 | 1 | 0.8 |
| 2026-Q1 | 60 | 12 | 23,828.00 | 1 | 0 | 3 | 120.5 |
| 2026-Q2 | 21 | 2 | 19,245.00 | 2 | 0 | 2 | 75.8 |
| 2026-Q3 | 0 | 0 | — | 1 | 0 | 0 | — |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
56.4201(a)(2) · $151.00 proposed
56.14207 · $177.00 proposed
56.12004 · $398.00 proposed
56.20011 · S&S · $592.00 proposed
56.14112(a)(2) · $151.00 proposed
Regular Safety and Health Inspection · 116.3 on-site hours
56.11001 · $959.00 proposed
56.4102 · $592.00 proposed
56.12028 · $398.00 proposed
56.4104(b) · $151.00 proposed
56.11012 · $151.00 proposed
56.4101 · $151.00 proposed
56.4201(a)(2) · $151.00 proposed
56.15005 · S&S · $432.00 proposed
Verbal Hazard Complaint Inspections · 2.0 on-site hours
HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY
The employee was assisting in installing a new drop pipe. The pipe remained secured but shifted from its placement, and the employee on the ground had a hold of it to keep it from swinging and felt the impact of the pipe shifting and felt discomfort in EE's back.
FIRE · ACCIDENT ONLY
Lost the kiln mcc and lost power to kiln draft, and the atox feed belt caught fire. Fire was controlled in about 15 minutes.
Spot Inspection · 0.8 on-site hours
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
The employee was moving thin sheets of metal (not wearing the appropriate PPE, cut-proof gloves) and cut EE's finger, resulting in five stitches.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
The employee was bent down picking up extra bolts when they felt a pop in their knee as they stood up. It was determined that the employee tore their meniscus and needed surgery.
HANDTOOLS (NONPOWERED) · DAYS RESTRICTED ACTIVITY ONLY
Miner was replacing rear belt skirting. After removing the old skirting, the miner used it to trace and cut a new piece. As the affected miner was starting to cut the new piece, the knife slipped and embedded itself about an inch into their leg. The miner was taken to urgent care, where they received four stitches just above the knee.
SLIP OR FALL OF PERSON · DAYS RESTRICTED ACTIVITY ONLY
Miner was called in to repair the splice in a belt. After completing the repair and reassembling the equipment, the miner checked the belt's operation. While inspecting the belt, the miner accidentally stepped on some clinker on the ground, causing them to slip and hyperextend their knee.
56.23002(a) · $151.00 proposed
Regular Safety and Health Inspection · 6.3 on-site hours
56.23002(a) · $165.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.