ACTIVE / OPERATOR PORTFOLIO

FRANK W WHITCOMB CONSTRUCTION CORP

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDL00579

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
CRUSHED STONE QUARRY AND PLANT4300005 · Active6/8 quarters reportedChittenden, VTSurface · MSHA: Crushed, Broken Stone NEC068,4427059.3

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

7

1 significant & substantial (S&S)

  1. 2025 Q13
  2. 2025 Q20
  3. 2025 Q32
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q32
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

1,371.00

7 of 7 violations with amounts

  1. 2025 Q1767
  2. 2025 Q2—
  3. 2025 Q3302
  4. 2025 Q4—
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3302
  8. 2026 Q4 *—

On-site inspection hours

59.25

5 inspections · 5 with hours

  1. 2025 Q114.25
  2. 2025 Q2—
  3. 2025 Q316.00
  4. 2025 Q4—
  5. 2026 Q18.50
  6. 2026 Q2—
  7. 2026 Q320.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q131767.0000214.3
2025-Q200—000—
2025-Q320302.0000116.0
2025-Q400—000—
2026-Q100—0018.5
2026-Q200—000—
2026-Q320302.0000120.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF034302
    CRUSHED STONE QUARRY AND PLANT · 4300005

    Regular Safety and Health Inspection · 20.5 on-site hours

  2. violation5020320
    CRUSHED STONE QUARRY AND PLANT · 4300005

    56.14132(a) · $151.00 proposed

  3. violation5020319
    CRUSHED STONE QUARRY AND PLANT · 4300005

    56.9300(a) · $151.00 proposed

  4. inspectionF006F10
    CRUSHED STONE QUARRY AND PLANT · 4300005

    Regular Safety and Health Inspection · 8.5 on-site hours

  5. violation9879718
    CRUSHED STONE QUARRY AND PLANT · 4300005

    56.4201(a)(1) · $151.00 proposed

  6. violation9879717
    CRUSHED STONE QUARRY AND PLANT · 4300005

    56.14100(b) · $151.00 proposed

  7. inspectionF0092C7
    CRUSHED STONE QUARRY AND PLANT · 4300005

    Regular Safety and Health Inspection · 16.0 on-site hours

  8. inspectionF016988
    CRUSHED STONE QUARRY AND PLANT · 4300005

    Compliance Follow-up Inspection · 1.5 on-site hours

  9. violation9807785
    CRUSHED STONE QUARRY AND PLANT · 4300005

    56.12004 · $151.00 proposed

  10. violation9807784
    CRUSHED STONE QUARRY AND PLANT · 4300005

    56.14130(g) · S&S · $465.00 proposed

  11. violation9807783
    CRUSHED STONE QUARRY AND PLANT · 4300005

    56.14132(a) · $151.00 proposed

  12. inspectionF017AF3
    CRUSHED STONE QUARRY AND PLANT · 4300005

    Regular Safety and Health Inspection · 12.8 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.