ACTIVE / OPERATOR PORTFOLIO

Excel Mining

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDP24012

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Excel #51519838 · Active6/8 quarters reportedPike, KYUnderground · MSHA: Coal (Bituminous)959,134504,585275203,924.0

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

275

47 significant & substantial (S&S)

  1. 2025 Q142
  2. 2025 Q251
  3. 2025 Q354
  4. 2025 Q423
  5. 2026 Q120
  6. 2026 Q250
  7. 2026 Q331
  8. 2026 Q4 *4

Accident records

20

0 records classified as fatality

  1. 2025 Q12
  2. 2025 Q27
  3. 2025 Q33
  4. 2025 Q42
  5. 2026 Q13
  6. 2026 Q20
  7. 2026 Q33
  8. 2026 Q4 *0

Proposed penalties · USD

154,936.00

263 of 275 violations with amounts

  1. 2025 Q121,585
  2. 2025 Q237,461
  3. 2025 Q335,518
  4. 2025 Q410,266
  5. 2026 Q111,243
  6. 2026 Q227,254
  7. 2026 Q311,609
  8. 2026 Q4 *—

On-site inspection hours

3,924.00

78 inspections · 78 with hours

  1. 2025 Q1521.50
  2. 2025 Q2524.25
  3. 2025 Q3615.50
  4. 2025 Q4582.25
  5. 2026 Q1572.50
  6. 2026 Q2484.25
  7. 2026 Q3570.00
  8. 2026 Q4 *53.75
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q142321,585.002011521.5
2025-Q251637,461.007014524.3
2025-Q354935,518.003013615.5
2025-Q423210,266.00208582.3
2026-Q120511,243.00307572.5
2026-Q2501527,254.000010484.3
2026-Q331711,609.003013570.0
2026-Q4 *40—00253.8

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9273016
    Excel #5 · 1519838

    75.1403 · $151.00 proposed

  2. violation9214344
    Excel #5 · 1519838

    75.1731(b) · $151.00 proposed

  3. inspectionF005001
    Excel #5 · 1519838

    103(i) Spot Inspections · 5.5 on-site hours

  4. violation9270751
    Excel #5 · 1519838

    75.360(g) · $151.00 proposed

  5. violation9214343
    Excel #5 · 1519838

    75.350(a)(2) · $151.00 proposed

  6. violation9214342
    Excel #5 · 1519838

    75.370(a)(1) · $193.00 proposed

  7. violation9214341
    Excel #5 · 1519838

    75.202(a) · S&S · $1,126.00 proposed

  8. violation9214340
    Excel #5 · 1519838

    75.1731(b) · $151.00 proposed

  9. violation9214339
    Excel #5 · 1519838

    75.1100-2(b) · $151.00 proposed

  10. violation9214338
    Excel #5 · 1519838

    77.1900-1 · $151.00 proposed

  11. violation9214336
    Excel #5 · 1519838

    75.1722(a) · $151.00 proposed

  12. violation9214335
    Excel #5 · 1519838

    75.503 · $226.00 proposed

  13. inspectionF0102B2
    Excel #5 · 1519838

    Regular Safety and Health Inspection · 430.0 on-site hours

  14. inspectionF0056F4
    Excel #5 · 1519838

    103(i) Spot Inspections · 5.0 on-site hours

  15. accident220260920044
    Excel #5 · 1519838

    MACHINERY · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was starting to drill for their inside bolt. A piece of rock fell from the outside bolt to where they started the inside bolt. The rock hit the canopy and slid off landing on the back side of their right foot. This caused a sprain to their foot.

  16. accident220260890104
    Excel #5 · 1519838

    POWERED HAULAGE · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Employee was going around a corner on a shuttle car. Their hand was on the handle on the canopy. They rubbed the corner of the rib with the canopy. They caught a finger between the hand hold and the rib causing a laceration that required stitches.

  17. inspectionF007747
    Excel #5 · 1519838

    103(i) Spot Inspections · 5.5 on-site hours

  18. violation8309327
    Excel #5 · 1519838

    75.342(a)(4) · $151.00 proposed

  19. violation9878011
    Excel #5 · 1519838

    75.403 · $151.00 proposed

  20. violation9878010
    Excel #5 · 1519838

    75.512 · $151.00 proposed

  21. violation8281293
    Excel #5 · 1519838

    70.100(a)(2) · S&S · $549.00 proposed

  22. violation8281292
    Excel #5 · 1519838

    70.100(a)(2) · S&S · $642.00 proposed

  23. inspectionF004FFF
    Excel #5 · 1519838

    103(i) Spot Inspections · 5.0 on-site hours

  24. violation9215113
    Excel #5 · 1519838

    75.1600-2(e) · $151.00 proposed

  25. violation9878009
    Excel #5 · 1519838

    75.503 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS30,1212 rows · 1 receiving plants
HEAT CONTENT · BTU/LB12,923Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.67 / 8.22Separate averages over measured receipts
DELIVERED COST · USD/TON128.25100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2026-Q211,90212,9200.708.40128.06
2026-Q3 *18,21912,9250.658.10128.37
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11576 · preliminaryEXCEL #51519838Cooper1384 · KY · ALLIANCE COAL18,219128.3712,9250.658.10SpotBITTruck
2026-06EIA row 9688 · preliminaryEXCEL #51519838Cooper1384 · KY · ALLIANCE COAL11,902128.0612,9200.708.40SpotBITTruck
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON103.84Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS901,264Allocated from published county sales
ESTIMATED COAL REVENUE · USD93,587,284Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Excel #51519838 · Pike, Kentucky921,222103.84901,26493,587,284County allocation estimate44.48% of eligible county production10 eligible mines / 10 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO