ALL STATUSES / OPERATOR PORTFOLIO

Evans Construction Company

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDL15912

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-13. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Evans No 1 Pit4801141 · Active6/8 quarters reportedTeton, WYSurface · MSHA: Construction Sand and Gravel033,0427135.3
Evans Wash Plant4801189 · Intermittent6/8 quarters reportedTeton, WYSurface · MSHA: Construction Sand and Gravel016,0963032.5
Small Crusher #13304801547 · Abandoned2/8 quarters reportedTeton, WYSurface · MSHA: Construction Sand and Gravel0300—

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

10

2 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q37
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q22
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

3,398.00

10 of 10 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q32,887
  4. 2025 Q4—
  5. 2026 Q1151
  6. 2026 Q2360
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

67.75

6 inspections · 6 with hours

  1. 2025 Q18.25
  2. 2025 Q2—
  3. 2025 Q322.50
  4. 2025 Q4—
  5. 2026 Q15.00
  6. 2026 Q232.00
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—0018.3
2025-Q200—000—
2025-Q3722,887.0000222.5
2025-Q400—000—
2026-Q110151.001015.0
2026-Q220360.0000232.0
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5051678
    Evans No 1 Pit · 4801141

    56.12004 · $209.00 proposed

  2. inspectionF027098
    Evans No 1 Pit · 4801141

    Regular Safety and Health Inspection · 16.5 on-site hours

  3. inspectionF027092
    Evans Wash Plant · 4801189

    Regular Safety and Health Inspection · 15.5 on-site hours

  4. violation5051646
    Evans Wash Plant · 4801189

    46.9(c)(3) · $151.00 proposed

  5. accident220260890091
    Evans No 1 Pit · 4801141

    HANDTOOLS (NONPOWERED) · DAYS RESTRICTED ACTIVITY ONLY

    Accident narrative

    Employee was performing maintenance work on an electrical motor that drives the screen deck. After losing balance when the nut/bolt started to loosen, they caught himself from falling with their left arm.

  6. violation9905263
    Evans No 1 Pit · 4801141

    56.20003(c) · $151.00 proposed

  7. inspectionF02769D
    Evans No 1 Pit · 4801141

    Regular Safety and Health Inspection · 5.0 on-site hours

  8. violation5051560
    Evans Wash Plant · 4801189

    56.12018 · $151.00 proposed

  9. violation5051559
    Evans Wash Plant · 4801189

    56.14112(a)(1) · $151.00 proposed

  10. inspectionF012576
    Evans Wash Plant · 4801189

    Regular Safety and Health Inspection · 17.0 on-site hours

  11. inspectionF02552B
    Evans No 1 Pit · 4801141

    Regular Safety and Health Inspection · 5.5 on-site hours

  12. violation5100245
    Evans No 1 Pit · 4801141

    56.14132(a) · $151.00 proposed

  13. violation5100244
    Evans No 1 Pit · 4801141

    56.14107(a) · S&S · $1,037.00 proposed

  14. violation5100243
    Evans No 1 Pit · 4801141

    56.14132(a) · $209.00 proposed

  15. violation5100242
    Evans No 1 Pit · 4801141

    56.12023 · $151.00 proposed

  16. violation5100241
    Evans No 1 Pit · 4801141

    56.11012 · S&S · $1,037.00 proposed

  17. inspectionF009D52
    Evans No 1 Pit · 4801141

    Regular Safety and Health Inspection · 8.3 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.