Eureka Stone Quarry Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspection
EUREKA STONE QUARRY INC · 360552710.0 on-site hours reported
Spot Inspection
Sterling Quarry · 360687712.3 on-site hours reported
Housekeeping.
Daleville Quarry · 360429330 CFR 56.20003(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Daleville Quarry · 360429320.5 on-site hours reported
Safety defects; examination, correction and records.
Daleville Quarry · 360429330 CFR 56.14100(b) · $151.00 proposed penalty
Compliance Follow-up Inspection
POCONO QUARRY PLANT · 36042431.0 on-site hours reported
Regular Safety and Health Inspection
Pocono Sand Plant · 360537811.5 on-site hours reported
Spillage and leakage.
Pocono Sand Plant · 360537830 CFR 56.4102 · $151.00 proposed penalty
Safety defects; examination, correction and records.
POCONO QUARRY PLANT · 360424330 CFR 56.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
POCONO QUARRY PLANT · 360424315.3 on-site hours reported
Inspection and cover plates.
POCONO QUARRY PLANT · 360424330 CFR 56.12032 · $151.00 proposed penalty
Controls and switches.
POCONO QUARRY PLANT · 360424330 CFR 56.12002 · Significant and substantial (S&S) · $642.00 proposed penalty
Access to stationary electrical equipment or switchgear.
POCONO QUARRY PLANT · 360424330 CFR 56.12019 · $151.00 proposed penalty
Compliance Follow-up Inspection
Warrington Quarry · 36000750.8 on-site hours reported
Compliance Follow-up Inspection
Rush Valley Quarry Plant I · 36042971.8 on-site hours reported
Safety defects; examination, correction and records.
Rush Valley Quarry Plant I · 360429730 CFR 56.14100(b) · $151.00 proposed penalty
Testing grounding systems.
Rush Valley Quarry Plant I · 360429730 CFR 56.12028 · $151.00 proposed penalty
Electrical conductors.
Rush Valley Quarry Plant I · 360429730 CFR 56.12004 · $151.00 proposed penalty
Construction and maintenance of guards.
Rush Valley Quarry Plant I · 360429730 CFR 56.14112(a)(1) · $151.00 proposed penalty
Inspection and cover plates.
Rush Valley Quarry Plant I · 360429730 CFR 56.12032 · $151.00 proposed penalty
Flying or falling materials.
Rush Valley Quarry Plant I · 360429730 CFR 56.14110 · $151.00 proposed penalty
Handrails and toeboards.
Rush Valley Quarry Plant I · 360429730 CFR 56.11002 · $151.00 proposed penalty
Construction and maintenance of guards.
Rush Valley Quarry Plant I · 360429730 CFR 56.14112(a)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
Rush Valley Quarry Plant I · 360429723.8 on-site hours reported
Berms or guardrails.
Rush Valley Quarry Plant I · 360429730 CFR 56.9300(b) · Significant and substantial (S&S) · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.