ACTIVE / OPERATOR PORTFOLIO

Eureka Stone Quarry Inc

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDL00086

MINE PORTFOLIO

8 of 8 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Daleville Quarry3604293 · Active6/8 quarters reportedLackawanna, PASurface · MSHA: Crushed, Broken Limestone NEC050,9477052.8
EUREKA STONE QUARRY INC3605527 · Active6/8 quarters reportedBucks, PASurface · MSHA: Crushed, Broken Stone NEC049,4487238.3
Milford Quarry3605515 · Active6/8 quarters reportedPike, PASurface · MSHA: Crushed, Broken Granite044,72825069.3
POCONO QUARRY PLANT3604243 · Active6/8 quarters reportedMonroe, PASurface · MSHA: Crushed, Broken Limestone NEC061,4486143.3
Pocono Sand Plant3605378 · Active6/8 quarters reportedMonroe, PASurface · MSHA: Construction Sand and Gravel033,5221030.8
Rush Valley Quarry Plant I3604297 · Active6/8 quarters reportedBucks, PASurface · MSHA: Crushed, Broken Limestone NEC093,76011084.0
Sterling Quarry3606877 · Active6/8 quarters reportedWayne, PASurface · MSHA: Crushed, Broken Traprock09,5440029.3
Warrington Quarry3600075 · Active6/8 quarters reportedBucks, PASurface · MSHA: Crushed, Broken Limestone NEC076,5725064.8

LOCATION

Portfolio map

8 of 8 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

62

18 significant & substantial (S&S)

  1. 2025 Q14
  2. 2025 Q210
  3. 2025 Q39
  4. 2025 Q44
  5. 2026 Q13
  6. 2026 Q230
  7. 2026 Q32
  8. 2026 Q4 *0

Accident records

3

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q21
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

16,136.00

61 of 62 violations with amounts

  1. 2025 Q1604
  2. 2025 Q21,536
  3. 2025 Q31,427
  4. 2025 Q4604
  5. 2026 Q13,679
  6. 2026 Q27,984
  7. 2026 Q3302
  8. 2026 Q4 *—

On-site inspection hours

412.25

43 inspections · 43 with hours

  1. 2025 Q151.50
  2. 2025 Q259.25
  3. 2025 Q370.50
  4. 2025 Q444.75
  5. 2026 Q127.00
  6. 2026 Q2115.50
  7. 2026 Q343.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q141604.0010751.5
2025-Q21021,536.0010459.3
2025-Q3931,427.0000870.5
2025-Q441604.0000344.8
2026-Q1333,679.0010527.0
2026-Q23087,984.000012115.5
2026-Q320302.0000443.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF019B44
    EUREKA STONE QUARRY INC · 3605527

    Spot Inspection · 10.0 on-site hours

  2. inspectionF03D000
    Sterling Quarry · 3606877

    Spot Inspection · 12.3 on-site hours

  3. violation9603034
    Daleville Quarry · 3604293

    56.20003(a) · $151.00 proposed

  4. inspectionF03CFF7
    Daleville Quarry · 3604293

    Regular Safety and Health Inspection · 20.5 on-site hours

  5. violation9603033
    Daleville Quarry · 3604293

    56.14100(b) · $151.00 proposed

  6. inspectionF046B9C
    POCONO QUARRY PLANT · 3604243

    Compliance Follow-up Inspection · 1.0 on-site hours

  7. inspectionF046B99
    Pocono Sand Plant · 3605378

    Regular Safety and Health Inspection · 11.5 on-site hours

  8. violation5078938
    Pocono Sand Plant · 3605378

    56.4102 · $151.00 proposed

  9. violation5078937
    POCONO QUARRY PLANT · 3604243

    56.14100(b) · $151.00 proposed

  10. inspectionF046B98
    POCONO QUARRY PLANT · 3604243

    Regular Safety and Health Inspection · 15.3 on-site hours

  11. violation5078936
    POCONO QUARRY PLANT · 3604243

    56.12032 · $151.00 proposed

  12. violation5078935
    POCONO QUARRY PLANT · 3604243

    56.12002 · S&S · $642.00 proposed

  13. violation5078934
    POCONO QUARRY PLANT · 3604243

    56.12019 · $151.00 proposed

  14. inspectionF02E2DC
    Warrington Quarry · 3600075

    Compliance Follow-up Inspection · 0.8 on-site hours

  15. inspectionF02E2DD
    Rush Valley Quarry Plant I · 3604297

    Compliance Follow-up Inspection · 1.8 on-site hours

  16. violation5079908
    Rush Valley Quarry Plant I · 3604297

    56.14100(b) · $151.00 proposed

  17. violation5079907
    Rush Valley Quarry Plant I · 3604297

    56.12028 · $151.00 proposed

  18. violation5079906
    Rush Valley Quarry Plant I · 3604297

    56.12004 · $151.00 proposed

  19. violation5079905
    Rush Valley Quarry Plant I · 3604297

    56.14112(a)(1) · $151.00 proposed

  20. violation5079904
    Rush Valley Quarry Plant I · 3604297

    56.12032 · $151.00 proposed

  21. violation5079903
    Rush Valley Quarry Plant I · 3604297

    56.14110 · $151.00 proposed

  22. violation5079902
    Rush Valley Quarry Plant I · 3604297

    56.11002 · $151.00 proposed

  23. violation5079901
    Rush Valley Quarry Plant I · 3604297

    56.14112(a)(1) · $151.00 proposed

  24. inspectionF02E2DA
    Rush Valley Quarry Plant I · 3604297

    Regular Safety and Health Inspection · 23.8 on-site hours

  25. violation5078000
    Rush Valley Quarry Plant I · 3604297

    56.9300(b) · S&S · $313.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.