ACTIVE / OPERATOR PORTFOLIO

Crimson Oak Grove Resources LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0174313

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Oak Grove Mine0100851 · Active6/8 quarters reportedJefferson, ALUnderground · MSHA: Coal (Bituminous)3,277,1701,670,8871,2301066,872.8
Oak Grove Preparation Plant0100329 · Active6/8 quarters reportedJefferson, ALFacility · MSHA: Coal (Bituminous)0217,930314222.5

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

1,261

331 significant & substantial (S&S)

  1. 2025 Q1209
  2. 2025 Q2100
  3. 2025 Q3119
  4. 2025 Q4214
  5. 2026 Q1216
  6. 2026 Q2125
  7. 2026 Q3213
  8. 2026 Q4 *65

Accident records

110

0 records classified as fatality

  1. 2025 Q125
  2. 2025 Q213
  3. 2025 Q313
  4. 2025 Q419
  5. 2026 Q115
  6. 2026 Q219
  7. 2026 Q36
  8. 2026 Q4 *0

Proposed penalties · USD

1,421,437.00

1,093 of 1,261 violations with amounts

  1. 2025 Q1206,331
  2. 2025 Q291,854
  3. 2025 Q3143,297
  4. 2025 Q4351,574
  5. 2026 Q1300,206
  6. 2026 Q2202,492
  7. 2026 Q3125,683
  8. 2026 Q4 *—

On-site inspection hours

7,095.25

287 inspections · 287 with hours

  1. 2025 Q11,102.75
  2. 2025 Q21,066.25
  3. 2025 Q3890.00
  4. 2025 Q41,058.50
  5. 2026 Q11,019.50
  6. 2026 Q2853.75
  7. 2026 Q3940.00
  8. 2026 Q4 *164.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q120967206,331.00250411,102.8
2025-Q21002491,854.00130461,066.3
2025-Q311928143,297.0013048890.0
2025-Q421439351,574.00190401,058.5
2026-Q121653300,206.00150511,019.5
2026-Q212535202,492.0019031853.8
2026-Q321360125,683.006024940.0
2026-Q4 *6525—006164.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5063161
    Oak Grove Mine · 0100851

    75.333(c)(3) · $313.00 proposed

  2. violation5063160
    Oak Grove Mine · 0100851

    75.333(c) · $1,037.00 proposed

  3. violation5063159
    Oak Grove Mine · 0100851

    75.1403 · S&S · $7,676.00 proposed

  4. violation5063158
    Oak Grove Mine · 0100851

    75.1100-3 · $336.00 proposed

  5. violation5063157
    Oak Grove Mine · 0100851

    75.400 · $697.00 proposed

  6. violation5063156
    Oak Grove Mine · 0100851

    75.400 · $697.00 proposed

  7. violation5063155
    Oak Grove Mine · 0100851

    75.1715 · $151.00 proposed

  8. inspectionF01A72C
    Oak Grove Mine · 0100851

    103(i) Spot Inspections · 5.5 on-site hours

  9. inspectionF01A72B
    Oak Grove Mine · 0100851

    103(i) Spot Inspections · 1.5 on-site hours

  10. accident220253280011
    Oak Grove Mine · 0100851

    SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY

    Accident narrative

    IE was walking at the MN2 header when EE rolled EE's ankle and fell to EE's knees.

  11. inspectionF01A72A
    Oak Grove Mine · 0100851

    103(i) Spot Inspections · 7.5 on-site hours

  12. violation9828967
    Oak Grove Mine · 0100851

    75.202(a) · $549.00 proposed

  13. violation9828966
    Oak Grove Mine · 0100851

    75.604(b) · S&S · $2,312.00 proposed

  14. violation9828965
    Oak Grove Mine · 0100851

    75.1725(a) · S&S · $3,184.00 proposed

  15. violation5190807
    Oak Grove Mine · 0100851

    75.606 · $313.00 proposed

  16. violation5190806
    Oak Grove Mine · 0100851

    75.1910(f) · $313.00 proposed

  17. violation5190805
    Oak Grove Mine · 0100851

    75.606 · $465.00 proposed

  18. accident220253210035
    Oak Grove Mine · 0100851

    FALL OF FACE/RIB/PILLAR/SIDE/HIGHWALL · ACCIDENT ONLY

    Accident narrative

    There was a rib roll located on the MN1 belt between 14 and 15 crosscut. Due to initial information this was reported out of caution. After investigation this was deemed to be a non-reportable event. The area was also investigated by MSHA and deemed to be a non-reportable event.

  19. inspectionF02E12D
    Oak Grove Mine · 0100851

    103(i) Spot Inspections · 14.8 on-site hours

  20. violation5063154
    Oak Grove Mine · 0100851

    75.220(a)(1) · S&S · $4,383.00 proposed

  21. violation5063153
    Oak Grove Mine · 0100851

    75.1718 · $549.00 proposed

  22. violation5063152
    Oak Grove Mine · 0100851

    75.380(d)(1) · S&S · $2,312.00 proposed

  23. violation5063151
    Oak Grove Mine · 0100851

    75.220(a)(1) · S&S · $14,557.00 proposed

  24. violation5063150
    Oak Grove Mine · 0100851

    75.1100-3 · $336.00 proposed

  25. violation5063149
    Oak Grove Mine · 0100851

    75.1106-3(a)(2) · $313.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this operator in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON205.24Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS2,944,272Allocated from published county sales
ESTIMATED COAL REVENUE · USD604,282,323Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Oak Grove Mine0100851 · Jefferson, Alabama2,806,000205.242,944,272604,282,323County allocation estimate33.36% of eligible county production4 eligible mines / 4 sales respondents
Oak Grove Preparation Plant0100329 · Jefferson, Alabama0205.24——Preparation plant4 eligible mines / 4 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.