Crimson Oak Grove Resources LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $697.00 proposed penalty
Preshift examination at fixed intervals.
Oak Grove Mine · 010085130 CFR 75.360(f) · $313.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $697.00 proposed penalty
On-shift examination.
Oak Grove Mine · 010085130 CFR 75.362(d)(1)(iii) · $313.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Oak Grove Mine · 010085130 CFR 75.512 · $209.00 proposed penalty
Ventilation controls.
Oak Grove Mine · 010085130 CFR 75.333(c)(3) · $313.00 proposed penalty
Ventilation controls.
Oak Grove Mine · 010085130 CFR 75.333(c) · $1,037.00 proposed penalty
Other safeguards.
Oak Grove Mine · 010085130 CFR 75.1403 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Condition and examination of firefighting equipment.
Oak Grove Mine · 010085130 CFR 75.1100-3 · $336.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $697.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $697.00 proposed penalty
Identification check system.
Oak Grove Mine · 010085130 CFR 75.1715 · $151.00 proposed penalty
Spot Inspections
Oak Grove Mine · 0100851103(i) · 5.5 on-site hours reported
Spot Inspections
Oak Grove Mine · 0100851103(i) · 1.5 on-site hours reported
Slip or fall of person
Oak Grove Mine · 0100851Days away from work only
Accident narrative
IE was walking at the MN2 header when EE rolled EE's ankle and fell to EE's knees.
Spot Inspections
Oak Grove Mine · 0100851103(i) · 7.5 on-site hours reported
Protection from falls of roof, face and ribs.
Oak Grove Mine · 010085130 CFR 75.202(a) · $549.00 proposed penalty
Permanent splicing of trailing cables.
Oak Grove Mine · 010085130 CFR 75.604(b) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Machinery and equipment; operation and maintenance.
Oak Grove Mine · 010085130 CFR 75.1725(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Protection of trailing cables.
Oak Grove Mine · 010085130 CFR 75.606 · $313.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
Oak Grove Mine · 010085130 CFR 75.1910(f) · $313.00 proposed penalty
Protection of trailing cables.
Oak Grove Mine · 010085130 CFR 75.606 · $465.00 proposed penalty
Fall of face/rib/pillar/side/highwall
Oak Grove Mine · 0100851Accident only
Accident narrative
There was a rib roll located on the MN1 belt between 14 and 15 crosscut. Due to initial information this was reported out of caution. After investigation this was deemed to be a non-reportable event. The area was also investigated by MSHA and deemed to be a non-reportable event.
Spot Inspections
Oak Grove Mine · 0100851103(i) · 14.8 on-site hours reported
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.