Coal production
40,975,495reported short tons
ALL STATUSES / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Bailey Mine3607230 · Active6/8 quarters reported | Greene, PAUnderground · MSHA: Coal (Bituminous) | 17,629,602 | 2,611,012 | 1,229 | 106 | 10,923.5 |
| ENLOW FORK MINE3607416 · Active6/8 quarters reported | Washington, PAUnderground · MSHA: Coal (Bituminous) | 15,038,810 | 1,799,445 | 460 | 41 | 8,544.3 |
| HARVEY MINE3610045 · Active6/8 quarters reported | Greene, PAUnderground · MSHA: Coal (Bituminous) | 8,307,083 | 1,107,372 | 285 | 27 | 5,320.0 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 3 mines listed under this operator were checked; 3 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 6,585,931 | 937,288 | 7.03 | 1,593 | 3/3 mines reporting |
| 2025 Q2 | 7,171,201 | 926,203 | 7.74 | 1,605 | 3/3 mines reporting |
| 2025 Q3 | 6,917,187 | 922,618 | 7.50 | 1,605 | 3/3 mines reporting |
| 2025 Q4 | 6,654,449 | 880,224 | 7.56 | 1,619 | 3/3 mines reporting |
| 2026 Q1 | 6,601,221 | 941,704 | 7.01 | 1,625 | 3/3 mines reporting |
| 2026 Q2 | 7,045,506 | 909,792 | 7.74 | 1,609 | 3/3 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
124 significant & substantial (S&S)
2 records classified as fatality
1,783 of 1,974 violations with amounts
605 inspections · 605 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 327 | 18 | 106,396.00 | 20 | 0 | 66 | 3,950.3 |
| 2025-Q2 | 277 | 16 | 81,333.00 | 18 | 0 | 69 | 4,013.0 |
| 2025-Q3 | 314 | 14 | 86,742.00 | 27 | 0 | 77 | 3,884.5 |
| 2025-Q4 | 220 | 4 | 48,088.00 | 26 | 0 | 62 | 3,076.0 |
| 2026-Q1 | 269 | 17 | 91,034.00 | 24 | 0 | 82 | 3,148.3 |
| 2026-Q2 | 249 | 23 | 93,523.00 | 35 | 1 | 110 | 3,257.3 |
| 2026-Q3 | 278 | 27 | 48,512.00 | 24 | 1 | 117 | 3,191.0 |
| 2026-Q4 * | 40 | 5 | — | 0 | 0 | 22 | 267.5 |
All violations issued in the selected period. Counts combine subsections.
75.1403 · $398.00 proposed
75.1107-3(d) · $151.00 proposed
Fatal Accident Investigation · 35.0 on-site hours
Description not reported
FALL OF FACE/RIB/PILLAR/SIDE/HIGHWALL · FATALITY
Employee was setting a post at 24xcut in 7 South #6 track entry, to barricade off an area of concern. While tightening up a post a piece of rock dislodged from the upper portion of the rib and fell striking the employee. The employee suffered fatal injuries as a result of this event.
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
IE was a part of a crew setting posts at right track, 24 wall in the mains. The crew set 2 posts and was in the process of setting a third when a large rock dislodged from the rib. IE dove out of the way of the incoming rock, EE's hard hat fell off and EE struck EE's head on a scoop parked in the crosscut. Injury was not the result of a training issue.
Shaft, Slope or Major Construction Spot Inspection · 6.0 on-site hours
Verbal Hazard Complaint Inspections · 14.0 on-site hours
Health Technical Investigation · 11.5 on-site hours
Description not reported · S&S · $4,871.00 proposed
72.630(b) · $165.00 proposed
75.400 · $226.00 proposed
75.1725(a) · S&S · $592.00 proposed
77.1900-1 · $432.00 proposed
75.202(a) · S&S · $1,320.00 proposed
Verbal Hazard Complaint Inspections · 5.5 on-site hours
103(i) Spot Inspections · 7.5 on-site hours
103(i) Spot Inspections · 6.0 on-site hours
75.323(b)(1)(ii) · $1,037.00 proposed
75.402 · S&S · $9,757.00 proposed
75.400 · $226.00 proposed
75.1731(a) · $209.00 proposed
103(i) Spot Inspections · 4.0 on-site hours
MACHINERY · DAYS AWAY FROM WORK ONLY
Employee was bolting when a piece of the rib slid off the ventilation tube and struck EE's neck and left shoulder. Employee was diagnosed with neck contusions and a possible concussion. EE was taken off of work the same day 5/19/26.
FALL OF FACE/RIB/PILLAR/SIDE/HIGHWALL · DAYS AWAY FROM WORK ONLY
Employee was standing next to the loader straighten out the rock dust to rock dust at the end of the shift, when a piece of the rib rolled out from the top of the binder striking EE in the right ankle. Employee was treated with a fracture to EE's right ankle.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 2,321,836 | 13,028 | 2.28 | 7.83 | 95.15 | |
| 2025-Q4 | 2,943,937 | 13,059 | 2.31 | 7.85 | 92.04 | |
| 2026-Q1 | 2,696,519 | 12,956 | 2.38 | 7.99 | 90.56 | |
| 2026-Q2 | 2,821,335 | 13,012 | 2.20 | 7.87 | 93.32 | |
| 2026-Q3 * | 837,610 | 13,045 | 2.35 | 7.89 | 94.80 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 11363 · preliminary | BAILEY MINE3607230 | Cross130 · SC · CONSOL | 65,966 | 99.26 | 13,085 | 2.31 | 7.90 | ContractBIT | Rail |
| 2026-07EIA row 11410 · preliminary | BAILEY MINE3607230 | Brandon Shores602 · MD · CONSOL | 62,336 | —Not published | 13,035 | 2.43 | 7.70 | ContractBIT | Rail |
| 2026-07EIA row 11453 · preliminary | BAILEY MINE3607230 | Bowen703 · GA · CONSOL ENERGY INC | 28,911 | 90.31 | 12,950 | 2.46 | 8.30 | ContractBIT | Rail |
| 2026-07EIA row 11635 · preliminary | BAILEY MINE3607230 | Monroe (MI)1733 · MI · CONSOL | 73,642 | 88.53 | 13,035 | 2.33 | 7.70 | ContractBIT | Rail / Great Lakes |
| 2026-07EIA row 11641 · preliminary | BAILEY MINE3607230 | Monroe (MI)1733 · MI · CONSOL | 30,554 | 78.65 | 13,108 | 2.29 | 7.80 | ContractBIT | Rail / Great Lakes |
| 2026-07EIA row 11730 · preliminary | BAILEY MINE3607230 | Roxboro2712 · NC · CONSOL | 12,290 | 100.93 | 13,149 | 1.88 | 7.50 | ContractBIT | Rail |
| 2026-07EIA row 11732 · preliminary | BAILEY MINE3607230 | Roxboro2712 · NC · CONSOL | 36,803 | 102.71 | 12,965 | 2.43 | 7.70 | ContractBIT | Rail |
| 2026-07EIA row 11738 · preliminary | BAILEY MINE3607230 | James E. Rogers Energy Complex2721 · NC · CONSOL | 38,075 | 113.24 | 12,986 | 2.33 | 8.90 | ContractBIT | Rail |
| 2026-07EIA row 11749 · preliminary | BAILEY MINE3607230 | Marshall (NC)2727 · NC · CONSOL | 23,841 | 108.10 | 13,135 | 2.34 | 7.50 | ContractBIT | Rail |
| 2026-07EIA row 11751 · preliminary | BAILEY MINE3607230 | Marshall (NC)2727 · NC · CONSOL | 49,660 | 94.72 | 13,032 | 2.24 | 7.80 | ContractBIT | Rail |
| 2026-07EIA row 11858 · preliminary | BAILEY MINE3607230 | Wateree3297 · SC · CORE NATURAL RESOURCES, INC | 24,738 | 94.45 | 13,115 | 2.12 | 7.50 | ContractBIT | Rail |
| 2026-07EIA row 11879 · preliminary | BAILEY MINE3607230 | Kingston3407 · TN · CONSOL | 46,231 | 88.90 | 12,967 | 2.56 | 8.00 | ContractBIT | Rail |
| 2026-07EIA row 11948 · preliminary | BAILEY MINE3607230 | Mt Storm3954 · WV · CONSOL | 55,757 | 79.91 | 13,152 | 2.16 | 7.80 | ContractBIT | Rail |
| 2026-07EIA row 12186 · preliminary | BAILEY MINE3607230 | Winyah6249 · SC · CONSOL | 13,380 | 98.01 | 12,950 | 2.42 | 8.00 | ContractBIT | Rail |
| 2026-07EIA row 12193 · preliminary | BAILEY MINE3607230 | Mayo6250 · NC · CONSOL | 12,250 | 102.71 | 13,014 | 2.23 | 7.70 | ContractBIT | Rail |
| 2026-07EIA row 12462 · preliminary | BAILEY MINE3607230 | Belews Creek8042 · NC · CONSOL | 25,694 | 113.62 | 13,021 | 2.01 | 7.60 | ContractBIT | Rail |
| 2026-07EIA row 12464 · preliminary | BAILEY MINE3607230 | Belews Creek8042 · NC · CONSOL | 12,443 | 95.62 | 13,222 | 2.07 | 7.80 | ContractBIT | Rail |
| 2026-07EIA row 12547 · preliminary | BAILEY MINE3607230 | Calvert City8837 · KY · CONSOL | 10,809 | 84.13 | 13,047 | 2.40 | 7.70 | ContractBIT | Rail |
| 2026-07EIA row 12556 · preliminary | BAILEY MINE3607230 | Keystone Fuels Terminal8845 · PA · CONSOL | 119,022 | —Not published | 13,002 | 2.55 | 8.10 | ContractBIT | Rail |
| 2026-07EIA row 12558 · preliminary | BAILEY MINE3607230 | Conemaugh Fuels LLC -Terminal8846 · PA · CONSOL | 84,094 | —Not published | 13,088 | 2.38 | 7.90 | ContractBIT | Rail |
| 2026-07EIA row 12643 · preliminary | BAILEY MINE3607230 | Pixelle Specialty Solutions LLC - Spring50397 · PA · CONSOL | 11,114 | —Not published | 13,000 | 2.04 | 7.40 | ContractBIT | Rail |
| 2026-06EIA row 9457 · preliminary | BAILEY MINE3607230 | Cross130 · SC · CONSOL | 26,954 | 95.42 | 13,050 | 2.34 | 7.70 | ContractBIT | Rail |
| 2026-06EIA row 9458 · preliminary | BAILEY MINE3607230 | Cross130 · SC · CONSOL | 54,007 | 98.30 | 13,065 | 2.21 | 7.70 | ContractBIT | Rail |
| 2026-06EIA row 9513 · preliminary | BAILEY MINE3607230 | Brandon Shores602 · MD · CONSOL | 94,529 | —Not published | 13,125 | 2.32 | 7.80 | ContractBIT | Rail |
| 2026-06EIA row 9555 · preliminary | BAILEY MINE3607230 | Bowen703 · GA · CONSOL ENERGY INC | 14,473 | 89.50 | 13,066 | 2.48 | 8.10 | ContractBIT | Rail |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Bailey Mine3607230 · Greene, Pennsylvania | 10,761,880 | — | — | — | County sales or price not published3 eligible mines / 3 sales respondents |
| Enlow Fork Mine3607416 · Washington, Pennsylvania | 9,181,023 | — | — | — | County sales or price not published1 eligible mines / 1 sales respondents |
| Harvey Mine3610045 · Greene, Pennsylvania | 5,743,707 | — | — | — | County sales or price not published3 eligible mines / 3 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.