Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 7.5 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 7.5 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(a) · $151.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
HARVEY MINE · 361004530 CFR 75.601-1 · $151.00 proposed penalty
Identification of circuit breakers.
HARVEY MINE · 361004530 CFR 75.904 · $165.00 proposed penalty
Power wires and cables; insulation and protection.
HARVEY MINE · 361004530 CFR 75.517 · $165.00 proposed penalty
Machinery
Bailey Mine · 3607230No dys awy frm wrk,no rstr act
Accident narrative
Employee was bolting on the side of the miner in 7 South left section. As EE was pushing the bolt into the hole, the expander caught on the hole causing the bolt to bend. EE's hand was pinched between the bolt and the strap jack. Employee received 4 stitches and was treated and released, no lost time.
Underground electrical installations.
ENLOW FORK MINE · 360741630 CFR 75.340(a)(1)(i) · $151.00 proposed penalty
Slip or fall of person
Bailey Mine · 3607230Dys awy frm wrk & restrctd act
Accident narrative
Employee was getting out of the shuttle car and stepped into a tire rut. EE twisted EE's right leg as EE fell to the ground. EE felt a pain in EE's right knee. EE continued to work all scheduled shift until being taken off of work to repair a torn ACL ligament in EE's right knee on 10/13/2025
Spot Inspections
HARVEY MINE · 3610045103(i) · 6.5 on-site hours reported
Electric equipment; examination, testing and maintenance.
Bailey Mine · 360723030 CFR 75.512 · $151.00 proposed penalty
Air quantity.
HARVEY MINE · 361004530 CFR 75.325(a)(1) · $165.00 proposed penalty
Handling of materials
Bailey Mine · 3607230Days away from work only
Accident narrative
Employee was assisting in loading a piece of rail onto a car. EE's right hand was caught between the rail and the bed of the car as another employee shoved the rail into position. Injury was not the result of a training or compliance issue.
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $336.00 proposed penalty
Temporary notations, revisions, and supplements.
ENLOW FORK MINE · 360741630 CFR 75.1202 · $193.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 13.5 on-site hours reported
Verbal Hazard Complaint Inspections
Bailey Mine · 36072300.0 on-site hours reported
Spot Inspections
ENLOW FORK MINE · 3607416103(i) · 8.5 on-site hours reported
Roof control plan.
Bailey Mine · 360723030 CFR 75.220(a)(1) · $226.00 proposed penalty
Permanent splicing of trailing cables.
Bailey Mine · 360723030 CFR 75.604(a) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
Bailey Mine · 360723030 CFR 75.370(a)(1) · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
Bailey Mine · 360723030 CFR 75.370(a)(1) · $288.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
Bailey Mine · 360723030 CFR 75.1103-4(b) · $193.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bailey Mine · 360723030 CFR 75.1725(a) · $193.00 proposed penalty
Status change reports.
ENLOW FORK MINE · 360741630 CFR 70.212(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.