Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection of trailing cables.
Bailey Mine · 360723030 CFR 75.606 · $151.00 proposed penalty
Testing, examination and maintenance.
ENLOW FORK MINE · 360741630 CFR 75.821(a) · $193.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
ENLOW FORK MINE · 360741630 CFR 75.1002(a) · $193.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 6.0 on-site hours reported
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $465.00 proposed penalty
Permissible electric face equipment; maintenance.
Bailey Mine · 360723030 CFR 75.503 · $151.00 proposed penalty
Accumulations of combustible materials.
Bailey Mine · 360723030 CFR 77.1104 · $1,219.00 proposed penalty
Accumulations of combustible materials.
Bailey Mine · 360723030 CFR 77.1104 · $151.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(b) · $592.00 proposed penalty
Machinery and equipment; operation and maintenance.
ENLOW FORK MINE · 360741630 CFR 75.1725(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Rock dusting.
HARVEY MINE · 361004530 CFR 75.402 · $165.00 proposed penalty
Respirable dust standards.
HARVEY MINE · 361004530 CFR 70.100(a)(2) · Significant and substantial (S&S) · $549.00 proposed penalty
Respirable dust standards.
HARVEY MINE · 361004530 CFR 70.100(a)(2) · Significant and substantial (S&S) · $549.00 proposed penalty
Slip or fall of person
Bailey Mine · 3607230Days away from work only
Accident narrative
Employee got EE's foot caught and twisted EE's knee while repairing a sump jack on a Continuous Miner. EE did not feel immediate pain but began to experience pain when EE exited EE's mantrip at the end of EE's shift. EE worked all shifts until being taken off and scheduled for surgery to repair a torn meniscus on 5/5/2026
Machinery
Bailey Mine · 3607230Days away from work only
Accident narrative
IE was assisting placing new floor section into a vessel. The crew was in the process of lowering it in with an air hoist. The floor plate shifted and the employee's ankle/foot was wedged between the floor section and the feed impact plate. Injury was not the result of a training or compliance issue.
Spot Inspections
Bailey Mine · 3607230103(i) · 3.0 on-site hours reported
Spot Inspections
HARVEY MINE · 3610045103(i) · 10.5 on-site hours reported
Clamping of trailing cables to equipment.
Bailey Mine · 360723030 CFR 75.605 · $151.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Bailey Mine · 360723030 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
ENLOW FORK MINE · 360741630 CFR 75.370(a)(1) · $151.00 proposed penalty
Handling of materials
Bailey Mine · 3607230Days away from work only
Accident narrative
IE was shoveling the tunnel belt. As EE was shoveling under the stairs, EE bumped EE's head into the stairs. EE continued shoveling until EE bumped EE's head into the stairs again. Injury was not the result of a training or compliance issue.
Permanent splicing of trailing cables.
Bailey Mine · 360723030 CFR 75.604(b) · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(b) · $151.00 proposed penalty
Dust accumulations in surface installations.
Bailey Mine · 360723030 CFR 77.202 · $245.00 proposed penalty
Examination and maintenance of firefighting equipment.
Bailey Mine · 360723030 CFR 77.1110 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.