← Consol Pennsylvania Coal Company LLC

Consol Pennsylvania Coal Company LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection of trailing cables.

    violationRecord 9938848
    Bailey Mine · 3607230

    30 CFR 75.606 · $151.00 proposed penalty

  2. Testing, examination and maintenance.

    violationRecord 9934073
    ENLOW FORK MINE · 3607416

    30 CFR 75.821(a) · $193.00 proposed penalty

  3. Installation of electric equipment and conductors; permissibility.

    violationRecord 9584922
    ENLOW FORK MINE · 3607416

    30 CFR 75.1002(a) · $193.00 proposed penalty

  4. Spot Inspections

    inspectionRecord F013E02
    Bailey Mine · 3607230

    103(i) · 6.0 on-site hours reported

  5. Accumulation of combustible materials.

    violationRecord 9933564
    Bailey Mine · 3607230

    30 CFR 75.400 · $465.00 proposed penalty

  6. Permissible electric face equipment; maintenance.

    violationRecord 9933563
    Bailey Mine · 3607230

    30 CFR 75.503 · $151.00 proposed penalty

  7. Accumulations of combustible materials.

    violationRecord 9581628
    Bailey Mine · 3607230

    30 CFR 77.1104 · $1,219.00 proposed penalty

  8. Accumulations of combustible materials.

    violationRecord 9581627
    Bailey Mine · 3607230

    30 CFR 77.1104 · $151.00 proposed penalty

  9. Travelways at surface installations.

    violationRecord 9581625
    Bailey Mine · 3607230

    30 CFR 77.205(b) · $592.00 proposed penalty

  10. Machinery and equipment; operation and maintenance.

    violationRecord 5156822
    ENLOW FORK MINE · 3607416

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  11. Rock dusting.

    violationRecord 9584683
    HARVEY MINE · 3610045

    30 CFR 75.402 · $165.00 proposed penalty

  12. Respirable dust standards.

    violationRecord 5156824
    HARVEY MINE · 3610045

    30 CFR 70.100(a)(2) · Significant and substantial (S&S) · $549.00 proposed penalty

  13. Respirable dust standards.

    violationRecord 5156823
    HARVEY MINE · 3610045

    30 CFR 70.100(a)(2) · Significant and substantial (S&S) · $549.00 proposed penalty

  14. Slip or fall of person

    accidentRecord 220261260020
    Bailey Mine · 3607230

    Days away from work only

    Accident narrative

    Employee got EE's foot caught and twisted EE's knee while repairing a sump jack on a Continuous Miner. EE did not feel immediate pain but began to experience pain when EE exited EE's mantrip at the end of EE's shift. EE worked all shifts until being taken off and scheduled for surgery to repair a torn meniscus on 5/5/2026

  15. Machinery

    accidentRecord 220260540021
    Bailey Mine · 3607230

    Days away from work only

    Accident narrative

    IE was assisting placing new floor section into a vessel. The crew was in the process of lowering it in with an air hoist. The floor plate shifted and the employee's ankle/foot was wedged between the floor section and the feed impact plate. Injury was not the result of a training or compliance issue.

  16. Spot Inspections

    inspectionRecord F015364
    Bailey Mine · 3607230

    103(i) · 3.0 on-site hours reported

  17. Spot Inspections

    inspectionRecord F0083E8
    HARVEY MINE · 3610045

    103(i) · 10.5 on-site hours reported

  18. Clamping of trailing cables to equipment.

    violationRecord 9938847
    Bailey Mine · 3607230

    30 CFR 75.605 · $151.00 proposed penalty

  19. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 9938846
    Bailey Mine · 3607230

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5150238
    ENLOW FORK MINE · 3607416

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  21. Handling of materials

    accidentRecord 220260540019
    Bailey Mine · 3607230

    Days away from work only

    Accident narrative

    IE was shoveling the tunnel belt. As EE was shoveling under the stairs, EE bumped EE's head into the stairs. EE continued shoveling until EE bumped EE's head into the stairs again. Injury was not the result of a training or compliance issue.

  22. Permanent splicing of trailing cables.

    violationRecord 9933562
    Bailey Mine · 3607230

    30 CFR 75.604(b) · $366.00 proposed penalty

  23. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9933561
    Bailey Mine · 3607230

    30 CFR 75.1731(b) · $151.00 proposed penalty

  24. Dust accumulations in surface installations.

    violationRecord 9581624
    Bailey Mine · 3607230

    30 CFR 77.202 · $245.00 proposed penalty

  25. Examination and maintenance of firefighting equipment.

    violationRecord 9581623
    Bailey Mine · 3607230

    30 CFR 77.1110 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.