ACTIVE / OPERATOR PORTFOLIO

Colorado Materials, Ltd

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDL06301

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Davenport Ranch Cline Quarry4104860 · Active6/8 quarters reportedUvalde, TXSurface · MSHA: Crushed, Broken Limestone NEC0135,7219852.8
Hunter Quarry4103430 · Active6/8 quarters reportedComal, TXSurface · MSHA: Crushed, Broken Limestone NEC0722,368975202.5

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

106

21 significant & substantial (S&S)

  1. 2025 Q114
  2. 2025 Q235
  3. 2025 Q32
  4. 2025 Q44
  5. 2026 Q118
  6. 2026 Q233
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

13

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q24
  3. 2025 Q31
  4. 2025 Q42
  5. 2026 Q12
  6. 2026 Q21
  7. 2026 Q33
  8. 2026 Q4 *0

Proposed penalties · USD

129,043.00

105 of 106 violations with amounts

  1. 2025 Q111,383
  2. 2025 Q255,060
  3. 2025 Q31,718
  4. 2025 Q43,505
  5. 2026 Q117,759
  6. 2026 Q239,618
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

255.25

15 inspections · 15 with hours

  1. 2025 Q148.75
  2. 2025 Q255.25
  3. 2025 Q311.00
  4. 2025 Q417.75
  5. 2026 Q160.75
  6. 2026 Q261.75
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q114111,383.0000448.8
2025-Q2351055,060.0040455.3
2025-Q3201,718.0010111.0
2025-Q4413,505.0020117.8
2026-Q118317,759.0020360.8
2026-Q233639,618.0010261.8
2026-Q300—300—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. accident220262440012
    Hunter Quarry · 4103430

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    doing a lift to a piece of steel got hang up but release and on the bounce of the piece landed on EE's right foot, injure required 7 stiches

  2. accident220262290003
    Davenport Ranch Cline Quarry · 4104860

    HANDLING OF MATERIALS · DYS AWY FRM WRK & RESTRCTD ACT

    Accident narrative

    Employee was conducting an inspection of VSI Crusher prior to starting machine. While inspecting underneath the machine, EE was holding up the skirting and it slipped out of EE's grip. The metal crossbar on the skirting came into contact with the left side of EE's facial area, resulting in two lacerations around EEs left eyelid area. EE received 12 sutures to seal the lacerations.

  3. accident220262080009
    Davenport Ranch Cline Quarry · 4104860

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Employee was attempting to place a bearing onto a shaft by hammering bearing onto shaft. This resulted in a piece of metal shard embedding itself into the left wrist area of the employee.

  4. accident220261630012
    Davenport Ranch Cline Quarry · 4104860

    HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY

    Accident narrative

    Employee was working maintenance on a conveyor belt system and felt a strain in EE's lower back while EE lifted the belt. Upon being interviewed, EE stated that EE believed EE aggravated a prior non-work related injury that had put EE out of work for several months.

  5. violation5178411
    Hunter Quarry · 4103430

    56.20003(a) · $3,736.00 proposed

  6. violation5178410
    Hunter Quarry · 4103430

    56.18002 · $288.00 proposed

  7. violation5178409
    Hunter Quarry · 4103430

    56.20003(a) · S&S · $5,574.00 proposed

  8. violation5178408
    Hunter Quarry · 4103430

    56.14107(a) · $288.00 proposed

  9. violation5178407
    Hunter Quarry · 4103430

    56.20003(a) · $1,126.00 proposed

  10. violation5178406
    Hunter Quarry · 4103430

    56.18002(d) · $151.00 proposed

  11. violation5177719
    Hunter Quarry · 4103430

    56.12032 · $959.00 proposed

  12. violation5177718
    Hunter Quarry · 4103430

    56.11003 · $288.00 proposed

  13. violation5177717
    Hunter Quarry · 4103430

    56.12023 · $288.00 proposed

  14. violation5177716
    Hunter Quarry · 4103430

    56.11001 · S&S · $1,431.00 proposed

  15. violation5177715
    Hunter Quarry · 4103430

    56.4200(b)(2) · $288.00 proposed

  16. violation5177714
    Hunter Quarry · 4103430

    56.20003(a) · S&S · $5,574.00 proposed

  17. violation9799400
    Hunter Quarry · 4103430

    56.20003(a) · $1,550.00 proposed

  18. violation9799399
    Hunter Quarry · 4103430

    56.11001 · S&S · $165.00 proposed

  19. violation9799398
    Hunter Quarry · 4103430

    56.14100(b) · $366.00 proposed

  20. violation9799397
    Hunter Quarry · 4103430

    56.14100(a) · $366.00 proposed

  21. violation5178405
    Hunter Quarry · 4103430

    56.4600(a) · $151.00 proposed

  22. violation5178404
    Hunter Quarry · 4103430

    56.20003(a) · S&S · $7,676.00 proposed

  23. violation5178403
    Hunter Quarry · 4103430

    56.20003(a) · $1,550.00 proposed

  24. violation5178402
    Hunter Quarry · 4103430

    56.20003(a) · $1,550.00 proposed

  25. violation5178401
    Hunter Quarry · 4103430

    56.12030 · S&S · $1,818.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.