Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MSHA OPERATOR IDL08263
MINE PORTFOLIO
1 of 1 mines and facilities
2025-01-01 – 2026-10-17. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
Mine location
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
Database snapshot · 2026-10-17. All 1 mines listed under this operator were checked; 0 have reports in the available quarters. Totals use current ownership.
Coal production
—
reported short tons
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Hours worked
—
reported employee hours
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Tons per hour
—
production ÷ hours worked
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
Quarterly data and reporting coverage
Quarterly production, employment and reporting coverage for Coeur Rochester, Inc.
Quarter
Coal (short tons)
Hours worked
Tons / hour
Avg. employees
Coverage
2025 Q1
—
—
—
—
No report
2025 Q2
—
—
—
—
No report
2025 Q3
—
—
—
—
No report
2025 Q4
—
—
—
—
No report
2026 Q1
—
—
—
—
No report
2026 Q2
—
—
—
—
No report
2026 Q3
—
—
—
—
No report
2026 Q4
—
—
—
—
No report
Safety and enforcement
2025-01-01 – 2026-10-17
Violations
63
4 significant & substantial (S&S)
2025 Q12
2025 Q22
2025 Q311
2025 Q40
2026 Q119
2026 Q21
2026 Q328
2026 Q4 *0
Accident records
16
0 records classified as fatality
2025 Q11
2025 Q20
2025 Q35
2025 Q43
2026 Q12
2026 Q21
2026 Q34
2026 Q4 *0
Proposed penalties · USD
30,222.00
62 of 63 violations with amounts
2025 Q11,277
2025 Q2730
2025 Q317,653
2025 Q4—
2026 Q13,054
2026 Q2151
2026 Q37,357
2026 Q4 *—
On-site inspection hours
410.50
23 inspections · 23 with hours
2025 Q187.00
2025 Q25.50
2025 Q376.25
2025 Q413.00
2026 Q170.50
2026 Q210.50
2026 Q3147.75
2026 Q4 *—
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
Quarterly safety data
Quarter
Violations
S&S
Proposed USD
Accident records
Fatality records
Inspections
On-site hours
2025-Q1
2
1
1,277.00
1
0
2
87.0
2025-Q2
2
0
730.00
0
0
1
5.5
2025-Q3
11
1
17,653.00
5
0
9
76.3
2025-Q4
0
0
—
3
0
2
13.0
2026-Q1
19
1
3,054.00
2
0
3
70.5
2026-Q2
1
0
151.00
1
0
2
10.5
2026-Q3
28
1
7,357.00
4
0
4
147.8
2026-Q4 *
0
0
—
0
0
0
—
Most cited CFR sections
All violations issued in the selected period. Counts combine subsections.
While performing a pre-operational inspection of a haul truck, the employee tripped and struck their elbow against the haul truck. The impact resulted in an injury to the employee's shoulder.
Employees were loading a 6-inch DR11 pipe into a fusion welder in the Stage 6 laydown area when the pipe became caught on the welder clamp. The employee reached in to reposition the pipe. When the pipe moved, the pressure released, causing the employee's hand to become pinched between the two sections of pipe.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
1 linked controller.
Relationships reflect the selected mine status and current MSHA controller/operator fields.