Coal Mac East safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulations of combustible materials.
Powellton #1 Mine · 460921730 CFR 77.1104 · $177.00 proposed penalty
Surface installations; general.
Powellton #1 Mine · 460921730 CFR 77.200 · $177.00 proposed penalty
Permanent splicing of trailing cables.
Lower War Eagle · 460931930 CFR 75.604(b) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Accumulation of combustible materials.
Lower War Eagle · 460931930 CFR 75.400 · $504.00 proposed penalty
Permanent splicing of trailing cables.
Lower War Eagle · 460931930 CFR 75.604(b) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Permissible electric face equipment; maintenance.
Lower War Eagle · 460931930 CFR 75.503 · $177.00 proposed penalty
Spot Inspections
Lower War Eagle · 4609319103(i) · 9.8 on-site hours reported
Power wires and cables; insulation and protection.
Lower War Eagle · 460931930 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Approval of other fire suppression devices.
Lower War Eagle · 460931930 CFR 75.1107-13(g) · $151.00 proposed penalty
Methane monitors.
Lower War Eagle · 460931930 CFR 75.342(a)(4) · $151.00 proposed penalty
Permanent splicing of trailing cables.
Lower War Eagle · 460931930 CFR 75.604(b) · $165.00 proposed penalty
Accumulation of combustible materials.
Lower War Eagle · 460931930 CFR 75.400 · $432.00 proposed penalty
Roof control plan.
Lower War Eagle · 460931930 CFR 75.220(a)(1) · $465.00 proposed penalty
Roof control plan.
Lower War Eagle · 460931930 CFR 75.220(a)(1) · $151.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
Powellton #1 Mine · 460921730 CFR 77.1713(a) · $592.00 proposed penalty
Surface installations; general.
Powellton #1 Mine · 460921730 CFR 77.200 · $151.00 proposed penalty
Accumulations of combustible materials.
Powellton #1 Mine · 460921730 CFR 77.1104 · $592.00 proposed penalty
Surface installations; general.
Powellton #1 Mine · 460921730 CFR 77.200 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Powellton #1 Mine · 460921730 CFR 77.502 · $151.00 proposed penalty
Mechanical equipment guards.
Powellton #1 Mine · 460921730 CFR 77.400(d) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Powellton #1 Mine · 460921730 CFR 77.502 · $592.00 proposed penalty
Surface installations; general.
Powellton #1 Mine · 460921730 CFR 77.200 · $592.00 proposed penalty
Accumulations of combustible materials.
Powellton #1 Mine · 460921730 CFR 77.1104 · $592.00 proposed penalty
Accumulations of combustible materials.
Powellton #1 Mine · 460921730 CFR 77.1104 · $592.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
Powellton #1 Mine · 460921730 CFR 75.1107-1(a)(3)(ii) · $177.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.